Home  >  PRODUCT  >  Living Room Furniture  >  Living room sofa  >  Carelli Ball Shape Orange Fabric Armchair With Black Metal Leg
Carelli Ball Shape Orange Fabric Armchair With Black Metal Leg

Carelli Ball Shape Orange Fabric Armchair With Black Metal Leg

Trade Term
EXW, FOB, CIF, CNF
MOQ
1 Set
Payment Term
T/T, L/C, D/P, Ali Trade Assurance
Lead Time
30-35 days after receive deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:




   PRODUCT  & PARAMETERS
INDUSTRY



PARAMETERS

Product Name:

Carelli Living Room Furniture Fabric Sofa

Style:

Modern Light Luxury Style

Item Number:

Y02

Brand:

Carelli

Application:

Living Room Furniture

Material:

Fabric,Iron,Sponge

Color:

Orange

Size:

820*830*730 MM

MOQ:

1 Set

Packing:

Standard Export Package



   PRODUCT  DETAILS
INDUSTRY


Velour material
The elegant flocking fabric gives out a luxury feeling in a brief design with the feature forskin-friendly, heat preservation,and antifriction.
Wider handrail design
Full filling , elegant lines, comfortable feeling when put the hands on it
High metal leg

Black painting steel leg, anti-rust meanwhile adding mysterious color,high leg design,can easy for house cleaning. 

109 degree comfortable oblique back
Full filling seating with 109 degree oblique back, creat a turely comfortable chair.
   PACKING  & SERVICES
INDUSTRY



After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Personalized
Provide personalized service for customers according to the needs of different customers.
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.




Product Message
社媒暂无评论
Contact