Genal  > 

AI - Page Sitemap

 > 

Best dining table and 6 chairs manufacturers

Best dining table and 6 chairs manufacturers

Best dining table and 6 chairs manufacturers

Trade Term
EXW / FOB shenzhen
MOQ
5 SETS
Payment Term
T/T, Ali trade assurance
Lead Time
30-35day after deposit received
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Company Advantages
1. Our dining table and 6 chairs varies from sizes, color and shapes. Sophistication and aesthetic appeal can be seen in every Genal furniture
2. Genal Furinture Industry Co.,Limited's domestic market appeal has gradually increased recent years. Genal furniture combines functionality with aesthetics
3. This product can maintain a hygienic surface. The material used does not easily harbor bacteria, germs, and other harmful microorganisms such as mold. The production of Genal furniture applies the most modern technology


Best dining table and 6 chairs manufacturers-1



   PRODUCT  & PARAMETERS
INDUSTRY


Best dining table and 6 chairs manufacturers-2
Best dining table and 6 chairs manufacturers-3


PARAMETERS

Product name

Round shape solid wood dining table

Model no

CH 1703

Frame material

Imported Zingana 

Color

Natural gold and black color

Feature

Eco-friendly Akzo nobel paint,

Dimension

ф1350*760H (mm)

Ф53.1*29.9 inch

Loading qty

106 pcs / 20’GP , 268 pcs / 40’HQ

Packing details

Standard export carton box with wood frame packing



   PRODUCT  DESCRIPTION
INDUSTRY


Best dining table and 6 chairs manufacturers-4



Product features


- Natural unique Ebody wood texture, shining gold and black mixed color 

- Clear and natural wood frain, smooth and flat furface

- Round and large table base design,  make whole table feel more the table more stable
- Heavy load bearing for the table base





   PRODUCT  DETAILS
INDUSTRY


Best dining table and 6 chairs manufacturers-5
 Material
Glossy, straight texture, fine and uniform structure; hard wood, high strength.
Best dining table and 6 chairs manufacturers-6
Design
Round and large table base design,  make whole table feel more stable.
Best dining table and 6 chairs manufacturers-7
AkzoNobel painting

AkzoNobel painting is green painting, the advantage is that no poison, no pollution, no waste. Better protect your family member's health. 

Best dining table and 6 chairs manufacturers-8
Color difference
  • Solid wood is spiritual, hierarchical, if the people look from different angle, it will show different visual aesthetics;

  • Due to the different light sources, the lamplight or the sunlight will affect the color of the wood;

  • Due to the wood's natural nature, after reprocessing, drying and polishing, the inconsistency of water absorption capacity will cause chromatic aberration.

   PACKING  & SERVICES
INDUSTRY


Best dining table and 6 chairs manufacturers-9


Best dining table and 6 chairs manufacturers-10
After-sales service
Your experience and feedback on products will be highly valued, we are always ready to get ourselves better. Any other problems, please feel free to contact us at any time!
Best dining table and 6 chairs manufacturers-11
Consulting
We provide 24h consulting service, solve the doubt for customer timely.
Best dining table and 6 chairs manufacturers-12
Personalized
Provide personalized service for customers according to the needs of different customers.
Best dining table and 6 chairs manufacturers-13
Logistics
Our factory is located in the Foshan where have rich transportation resources.We can provide all kind of logistics service to satisfy different customer.





Company Features
1. Genal Furinture Industry Co.,Limited is a top provider of dining table and 6 chairs and solutions.
2. By performing high technology, Genal is able to ensure the quality of the solid wood dining table .
3. Genal Furinture Industry Co.,Limited adheres to the concept of customer first. Please contact us!
Product Message
Contact