A laundry and storage unit looks like a small line item on a residential schedule until it arrives on site and the appliance will not close into the recess, or the door swing clashes with the vanity. Our Laundry & Storage Combo is made to measure for each project, so the result depends on what you send us before production starts. Below is the information we work through with architects, builders and interior designers on villa and apartment projects.

The appliance decides the carcass, not the other way around

Send the exact appliance models early: washer, dryer, or a single combined unit, together with their installation drawings. Front-acting machines need clearance in front for the door arc and room behind for inlet and waste connections; top-acting lid machines do not, which is why the machine type changes the depth of the carcass before anything else does. Under-bench built-ins are dimensioned against the manufacturer's recess drawing rather than the brochure size on the retail page.

Two numbers matter most: total machine height, and whether a worktop is going over the top of it. A bench above the appliance reduces the usable height and changes how the unit is supported. If you want the machines stacked, tell us which way they stack and which side the control panel sits on, because that sets where the access opening goes.

Room type, moisture and the material you specify

The Laundry & Storage Combo sits in the Laundry Integration collection and is designed for residential bathroom projects, so it is usually specified inside a wet or damp zone rather than a separate utility room. That affects board choice, edge treatment and how close the cabinet can sit to a shower enclosure, basin or trough.

Where laundry duties share a main bathroom, we also need to know how the space is ventilated: mechanical extraction, an openable window, or neither. An internal bathroom with no external wall is not the same environment as a cross-ventilated one, and the finish and hardware you choose should reflect that difference rather than follow what looks good on the rendering.

Layout constraints to fix before ordering

  • Finished floor level and finished wall faces. Tiles, waterproofing and render consume thickness, so rough dimensions from a builder's sketch will not match the opening the cabinet finally drops into.
  • Location of waste, taps, power points and any isolating valves, so we can decide whether services run behind the unit or through a service bay.
  • Door and drawer clearance. Hinged doors, sliding pocket systems and pull-out drawers each need their own swing or travel zone; check them against the toilet, vanity and shower door.
  • Floor levelness in older or renovated villas. A made-to-measure unit can be scribed to an out-of-square wall, but only if we know that is the case.

Storage mix: what is kept in the room

Tell us who uses the room and how. A family bathroom needs different compartments from a guest-wing bathroom in a villa, and both differ again from a serviced apartment where housekeeping stocks linen and cleaning supplies. Open shelving suits daily items; deep drawers suit detergents and bulk stock; closed tall storage hides things you do not want visible from the bedroom.

If part of the room has to work as general storage outside laundry days, we can carry the same finish into a matching Multi Function Tall Cabinets so the laundry and the rest of the joinery read as one set. Where the footprint is tight, Compact Laundry Solutions covers shorter runs, and where machines must sit one above the other, Stacked Laundry Units handles the vertical arrangement.

Finishes, and how they tie back to the rest of the fit-out

Finish, layout and dimensions are all specified per project. When the laundry or bathroom cabinetry has to match kitchen cabinets, wardrobes or vanities in the same dwelling, send us the door profile, colour reference and sheen level you have already fixed elsewhere. A board sample number is far more reliable than a photograph, and we supply material and finish options against that reference and confirm the selected specification with you before manufacture.

How many units, and how they reach the site

Quantity changes what we build and how it travels. A single villa unit can be made to a bespoke opening; a repeated apartment type should be standardised across units so that one drawing serves every floor and the trade price follows. For multi-unit work, confirm the number of identical bathrooms, whether levels repeat exactly, and where the crates can be staged on site.

As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we handle production, packing and door-to-door delivery, then coordinate installation and after-sales support. That means dimensions and service access have to be agreed with your site team before drawings are released, not adjusted after the container has shipped.

Before you send an enquiry

  • Appliance make, model and installation drawing
  • Finished dimensions of the opening, plus floor level
  • Positions of waste, water, power and ventilation
  • Door type and clearance envelope
  • Storage mix and who uses the room daily
  • Quantity, unit repetition and site delivery access

Dimensions and selected specifications are confirmed for each project. Send us the six items above with your drawings and we will come back with a layout, finish schedule and quotation matched to the space.