A swim spa quotation is easy to compare on price and hard to compare on scope. Two proposals for the same outdoor swim spa model can sit far apart in total cost, and the difference usually sits in what is not written on the line item list: pump sizing, filtration duty, electrical supply, site preparation and who carries the risk between the factory floor and the finished pool deck. This guide walks through how to read a manufacturer's proposal for the WS-PC06ST-L outdoor swim spa model line by line, so you can put two quotes on the same basis before you commit.
Start with the shell dimensions, not the headline price
The model code tells you more than the marketing name. In this catalogue family the "ST" variants are the swim-training configurations, and the "-L" suffix marks the longer shell within each size band — a WS-PC06ST-L sits alongside a shorter WS-PC06ST, and both sit next to the PC05 and PC07 bands. Treat every length figure as one to verify on your own quotation rather than in a brochure heading, because catalogue entries for this range are revised between printings. Length is not a cosmetic choice: it changes how much of the basin is usable swimming length once the jet array and any seating are accounted for, and it changes the shipping envelope, the crane or forklift access needed on site, and whether the unit clears your setback and boundary lines.
Before you accept a dimension, check three numbers against your own drawings:
- Shell footprint versus clear opening. Measure the access route from the street to the final position — gate width, side passage, overhead power lines — not just the pad. A spa that fits the deck can still fail to reach it.
- Water depth and seating height. Depth governs swim posture; built-in bench height governs whether the hydrotherapy seats are usable by the people who will actually use them.
- Weight filled, empty and during installation. Ask for all three. Structural engineers and rigging quotes need the filled figure, while the delivery quote needs the transit figure.
Read the equipment schedule line by line
A serious proposal lists what is fitted, in quantity, with the model or rating of each component. Below is the shape of that schedule for this product line, with the checks each row should trigger on your own quotation. Use your quoted figures rather than any published ones — configurations change between revisions.
| Specification item | What the catalogue schedule shows | What to confirm on your quote |
|---|---|---|
| Shell dimensions | Length, width and depth stated for the exact model suffix quoted | Whether the quoted unit is the -L long shell or the shorter standard shell |
| Control system | One control set listed | Controller brand, touchscreen or keypad, remote/diagnostic access, language of the interface |
| Swim training system | One swim-training set listed | Adjustable flow intensity and whether the output is stated in a way you can compare between suppliers |
| Water pump | May be absent from the published schedule for this model | Whether it is included, optional or omitted — and at what flow rate and head |
| Filter pump | One filter pump listed | Filtration turnover time for the full water volume at the stated pump rate |
| Jet total | A stated number of jets | Jet types and positions, and which of them are swim jets rather than massage jets |
| LED lights | A stated number of in-shell fittings | Colour options, controller integration, and how the fitting is serviced after the shell is set |
| Total power | A single total power figure for the unit | Whether this covers heater, pumps and controls together, and what supply it assumes |
The line that most often moves the price later is the water pump. Where a specification sheet leaves it unlisted, ask directly whether the quoted price includes it; on this product line the swim-training set and filter pump are stated while the water pump may not be. A proposal that omits a pump and then adds one as a variation after order confirmation is not cheaper — it simply arrives late.
The same applies to total power. A single total power figure needs its basis stated: does it include the heat pump or inline heater, and is it measured at the supply breaker or at the equipment panel? An electrician pricing your site works from that number, so an ambiguous one turns into a contingency on their side of the contract.
Separate standard equipment from catalogue options
Configurable swim spa ranges such as this one list options that are not automatically fitted — control system upgrades, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option named on a brochure page is not the same thing as an option quoted for your unit.
For a swim spa that will run in cool mornings or shoulder seasons, the two options worth pricing properly are insulation and the heat source. They determine running cost more than any lighting or jet upgrade. Ask for the insulated shell construction, the lid specification and the heater or heat pump rating as three separate priced items.
Filtration deserves the same treatment. A filter pump fitted as standard does not automatically mean the filtration duty suits your use. Ask what turnover rate the quoted pump achieves for this water volume, whether sand filtration is offered instead of cartridge filtration, and what consumables you will be buying each year.
Check the electrical and site-preparation boundary
This is where overseas-manufactured equipment most often creates surprise. The manufacturer supplies the spa; your local contractor supplies the supply. Get the following in writing on both sides:
- Supply voltage, phase and breaker rating the unit requires, plus the recommended cable size and run length limit.
- Who provides the isolator, residual-current protection and any dedicated earth bonding — factory or local electrician.
- Whether the control system supports the timer, filtration cycles and heating schedule you intend to run overnight.
- Local approval requirements for an outdoor water feature near boundaries, including any pool-fencing rules that apply once the water depth crosses the threshold in your area. These are set by your council or authority, not by the supplier's datasheet.
A manufacturer that states its electrical requirements clearly is doing you a favour; one that answers "standard" is passing the cost of clarification to you.
Judge the supplier on delivery scope, not product range
A swim spa rarely arrives alone on a project. In villa and hospitality work it usually travels alongside pool and spa products, surrounding paving, outdoor furniture and shading structures, and the coordination cost of separate suppliers shows up as schedule slippage rather than on an invoice. A supplier that handles furniture and building materials under one contract reduces the number of handover points you have to police.
Ask a prospective supplier to describe their delivery scope in concrete terms:
- Logistics and door-to-door delivery — which Incoterm applies, who handles customs clearance, whether cargo insurance is included or optional, and how the shipment is tracked.
- Packaging and container loading plan — for a spa shell this affects damage risk more than any other line in the file.
- Installation and after-sales support — who commissions the plant on site, what is covered during the warranty period, and how spare parts such as pumps, jets and controllers are supplied years later.
- Custom and OEM service — whether finish, colour, jet layout or control configuration can be changed at all, and what that costs in tooling or lead time.
Written answers here are worth more than a lower unit price, because they determine the total landed cost rather than the ex-works figure.
A six-point comparison sheet before you sign
- 1. Configuration parity. Put every quote against the same list: shell size, swim system, pumps, jets, lighting, insulation, heating, lid, steps. Price only what matches.
- 2. Electrical basis. Supply requirement, breaker rating and what is excluded on site.
- 3. Filtration duty. Turnover time for the full volume, plus annual consumables.
- 4. Delivery terms. Incoterm, insurance, customs responsibility, delivery address and access constraints.
- 5. Commissioning and warranty. Who starts the plant, what is covered, how spares are sourced after handover.
- 6. Variation rules. What triggers a price change after order confirmation, and what does not.
If two proposals survive that sheet with the same total, you are choosing a supplier rather than a product — which is the right way to make the decision anyway.
Where this fits in a wider project budget
On villa and resort projects the swim spa is usually one item in an outdoor package that also includes paving, screening, pergolas and poolside furniture. Procuring it as part of a single fit-out file — with turnkey delivery covering design coordination, production and site handover — keeps material finishes consistent between the spa surround, the decking and the seating around it. If you are also specifying interior fixtures for the same building, grouping ceramics, joinery, lighting and finishes with the outdoor package shortens the number of separate approvals you have to run.
Send us your specification sheet and drawings
Share the model code, site access photos and your electrical supply details, and we will return a configuration for the WS-PC06ST-L range with pumps, filtration, insulation and heating priced as separate line items — so you can compare it against any other proposal on identical terms. Enquiries: santerson.com/contact.