A full-house custom wall cabinet package that carries arched niches, a concealed wardrobe and an integrated vanity is one of the hardest items to price-check. Two quotations for "the same wall" can differ by a wide margin and still both be reasonable — because the drawings behind them are not describing the same build. Below is the comparison routine we use with buyers and project teams when they review samples and proposals for this type of work, using our arched niche & full house custom wall cabinet project as the running example.
Start by putting both suppliers on the same scope sheet
Before you look at a single price line, write down what each proposal actually includes. A whole-house joinery package normally spans several rooms and several different build types, and that is exactly where quotations drift apart. The reference project covers an arched wall niche with built-in lighting used as a display shelf, layered floating shelves, a full-height seamless wardrobe in flush wood grain panels across a bedroom wall, an integrated vanity table with drawers beside an arched textured glass window, and a bathroom double sink vanity countertop fabricated from natural green marble.
Ask each supplier to confirm, in writing, which of those elements sit inside their number and which are optional extras. A proposal that quietly excludes niche lighting, the marble countertop or the arch framing looks cheaper until those items return as variations on site. We record scope line by line as part of our project service, so the comparison column stays honest from the first quotation to the final handover.
Compare samples on the four things that fail first
A sample panel is only useful if you test it against the details that cause complaints after installation. For arched, full-height work, check these:
- The arch itself. Radius, symmetry and how the curve meets the straight panel below it. Ask whether the arch is a formed component or a laminated build-up, and inspect the joint line where they meet.
- Panel-to-panel alignment. Full-height concealed wardrobes depend on flush panels with consistent gaps. Look at the sample edge-on under raking light, not straight on.
- Finish continuity across materials. The reference project mixes wood grain panels, textured glass and stone. Request samples of every surface in the same order they will appear on the wall, so the tones can be judged together.
- Hardware and moving parts. Drawer runners, hinges and any lighting driver inside a niche should come from the sample, not from a catalogue page.
Keep every approved sample with a signed date. Once production starts, an unsigned sample cannot settle a colour or profile dispute.
Read the proposal for what it does not say
| Line to check | Weak wording | Specific wording you want |
|---|---|---|
| Dimensions | "As per site" | Room-by-room elevations with numbered panels and finished opening sizes |
| Materials | "Wood veneer / MDF" | Board substrate, core, surface material, finish system, edge treatment |
| Storage layout | "Internal fit-out included" | Hanging zones, drawer banks and shelf positions drawn to scale |
| Lighting | "LED included" | Driver location, access panel, control method, replacement route |
| Stone work | "Marble countertop" | Slab reference, thickness, edge profile, sink cut-out positions, seams |
| Site interface | Silent | Who prepares walls and floors, and where joinery responsibility ends |
| Delivery | "FOB / CIF" | Packaging standard, container loading plan, delivery address, who unloads |
| Installation | "Installation available" | Who installs, on-site sequence, snag list process, handover document |
Where a supplier cannot answer one of these lines, treat it as an open risk rather than a saving. In our own workflow the same points are settled before production: interior design services cover space planning, 3D renderings and production coordination, and site survey precedes manufacturing so cabinet dimensions match the actual walls, appliances and floor levels.
Price the whole package, not the cheapest wall
Full-house joinery is usually bought in phases, which is how price differences hide. A supplier may quote a bedroom wardrobe attractively and then add premium rates for niche paneling, the vanity unit and the bathroom countertop. Compare the complete package across all rooms, and ask what changes if quantities move from one phase to another. Suppliers working from custom & OEM service agreements should be able to state clearly which items are standard production and which are bespoke fabrications, because bespoke work is where unit rates vary most.
A practical test: ask two suppliers to price the identical elevation drawing. If their totals still differ sharply, the gap is not craftsmanship — it is scope, material specification or the site interface that nobody wrote down.
Check logistics and installation terms before signing
Arched panels and full-height wardrobe doors are oversized, fragile components. Ask how they are packed, whether arch sections ship flat or assembled, and how replacement panels reach site if one is damaged in transit. Our logistics and door-to-door delivery service covers freight coordination, packaging and container loading planning and the shipping paperwork, while installation and after-sales support covers on-site fitting, inspection snags, spare parts and maintenance. Confirm the exact terms for your project — delivery scope, duties and warranty conditions are agreed case by case, not assumed.
A short comparison checklist
- One shared scope sheet listing every element in every room.
- Elevation drawings with numbered panels from each supplier.
- Physical samples of all surfaces, hardware and the arch profile, signed and dated.
- Written answers to the eight proposal lines in the table above.
- Total package price across phases, not per-room headline rates.
- Packaging, delivery and installation terms confirmed before signature.
If you are evaluating quotations for built-in cabinetry, our team can review your drawings against the specification above and return a line-by-line proposal with the same structure. Send elevations or a room list to contact SANTERSON for a quotation on panel material, wood colour, arch shape and storage layout.