Why a Laundry Area Is Rarely a Single Line Item
When a stacked laundry unit appears on a bill of quantities it usually travels with a whole family of related cabinetry. In our Laundry Integration range, Stacked Laundry Units sit alongside washer and dryer cabinets, compact laundry solutions, laundry and storage combos, multi-function tall cabinets and pull-out hampers. Each is made to measure for residential bathroom and laundry projects, with project-specific dimensions, layout and finish options.
That product family is exactly where budget errors creep in. A buyer who prices only the stacked unit tends to discover later that the appliance enclosure, the benchtop, the hamper bay and the adjoining tall storage were never quoted — or were quoted by a different supplier with a different material standard and a different tolerance for site variation. This article sets out how to scope and budget the whole group in one pass, so the numbers you approve are the numbers that get delivered.
Start With the Appliance Schedule, Not the Cabinet Drawing
The order of work matters. Before any cabinet dimension is fixed, collect an appliance schedule for every laundry and utility space in the project: washer, dryer, and where relevant a third appliance such as a steamer or heat-pump unit. For each item record the model reference, the external dimensions, whether the machine is front- or top-loading, the required clearances for door swing and service access, and the connection type for water supply, drainage and power.
This sequence matters because a stacked configuration is driven by vertical load and ventilation, not floor area. A cabinet that carries one machine over another has to support the combined weight of two appliances when loaded, and it has to leave the air paths the manufacturers specify. Those two requirements determine carcass construction, whether a bridging panel or solid shelf is needed, and how much depth the enclosure can take. Change the appliance after production has started and you usually change the cabinet too.
For projects where appliances are not yet selected, ask your supplier to build in an adjustable allowance rather than guessing: a defined recess with documented tolerances is easier to reconcile at shop-drawing stage than a nominal size carried through three documents.
The Six Cost Drivers You Should Price Separately
Splitting the work into priced components makes comparison between suppliers meaningful. We recommend showing these as separate lines in your budget and in any quotation you receive:
- Carcass and structure. The stacked enclosure, load-bearing shelf or bridge panel, plinth or legs, and any reinforcement required by the appliance combination.
- Doors, drawers and hardware. Hinge type, soft-close fittings, drawer runners and load ratings. Hardware is where a low quotation often quietly becomes an expensive variation.
- Finish and fronts. The same layout in a matte lacquer, melamine or veneer front will price differently; keep the finish identical across related items if you want visual continuity between the laundry and adjoining joinery.
- Benchtops and wet areas. Countertops, splashbacks and any integrated basin near the laundry. Surface material is normally priced by area rather than by unit.
- Storage accessories. Pull-out hampers, shelving inserts, tall-cabinet internals and broom or ironing provisions.
- Ventilation, services coordination and site preparation. Openings, cut-outs, insulation and the interface with plumbing and electrical trades. Usually a site cost, not a cabinet cost — which is precisely why it gets missed.
Group Related Items Under One Supplier to Control Scope
Once the components are separated, decide who supplies what. Our practice on multi-unit residential and villa projects is to place the whole laundry family with one joinery supplier so that carcass construction, finish and hardware standard stay consistent across rooms and buildings. That single decision removes most of the reconciliation work later.
Grouping also improves the buying position. WasherDryer Cabinets, Compact Laundry Solutions, Laundry & Storage Combo and Multi Function Tall Cabinets share carcass specifications, so a project that repeats the same layout across several units can be produced as one batch. Repeat layouts are the fastest legitimate way to bring a per-unit cost down without touching finish quality.
| Project type | Typical configuration | What to lock down early |
|---|---|---|
| Apartment with a laundry cupboard in a hallway or bathroom | Stacked unit inside a tall enclosure, with an integrated hamper bay below or beside | Door swing and hinge side; ventilation path; access panel for plumbing |
| Villa with a dedicated laundry room | Stacked unit plus benchtop, sink and adjacent tall storage | Benchtop height against user profile; drainage and tapware location; continuous finish with adjoining joinery |
| Multi-unit development repeating one layout | One approved stacked configuration duplicated across units, with minor mirror variants | A single approved prototype before batch production; clear tolerance notes for wall-to-wall variation |
| Service apartment or short-stay building | Compact laundry solution sized to a smaller footprint, hardware selected for high cycle use | Hardware duty rating; replacement-part availability; finish resistance to cleaning products |
Set the Prototype Before You Commit the Batch
On any project with more than a handful of identical laundry sets, budget for one prototype or first-article unit. This is where you verify that the stacked recess takes your actual appliances, that drawer fronts clear the door opening, that the finish reads correctly under site lighting, and that the enclosure does not obstruct the machine door. The cost of one prototype is small next to re-making twenty enclosures.
Approve the prototype in writing, with the appliance model, carcass dimension, finish code and hardware schedule recorded on the sign-off sheet. That document becomes the reference for every subsequent unit and for any variation claim.
Cost control point: fix the appliance schedule and the approved prototype before batch production is released. Changes after that point affect carcass construction, ventilation and services coordination at once, which is why late changes cost more than their face value.
Coordinate With the Rest of the Fit-out
A laundry rarely stands alone. In villas and apartment fit-outs it usually adjoins a kitchen, bathroom or utility corridor, and the joinery language should carry across. Where the same supplier handles Custom Built-in Kitchen Cabinets and bathroom storage, matching carcass colours, panel profiles and hardware becomes a single specification rather than three separate negotiations.
This is also where procurement sequencing pays. As part of Turnkey Interior Project Solutions, laundry joinery can be ordered together with the bathroom and kitchen packages, produced in one factory run and shipped in consolidated containers under door-to-door logistics. Fewer shipments means fewer delivery dates to manage on site and a simpler inspection routine when goods arrive.
A Practical Budget Checklist
- Appliance schedule complete, with model references and clearances for every laundry location.
- Each cost driver priced as its own line: carcass, hardware, fronts and finish, benchtop, accessories, site coordination.
- Quantities taken from a dimensioned layout drawing, not from a room count.
- One approved prototype per distinct configuration, signed off before batch release.
- Tolerances for finished floor levels and wall-to-wall dimensions stated on the drawings.
- Ventilation and service access shown on the cabinet drawing, so no trade assumes someone else is providing it.
- Finish codes matched with adjacent joinery, recorded by code rather than by description.
- Delivery split and inspection point agreed for each phase of the project.
Common Questions
Can a stacked unit be made to measure if ceiling heights vary between units?
Yes. These units are made to measure, so the enclosure can be sized to the finished ceiling height of each location. What should not vary is the appliance recess and its ventilation; keep that module identical and adjust the top panel or filler instead.
Is it worth supplying laundry joinery separately from the kitchen package?
Usually not. Sharing carcass specification, finish and hardware across both packages simplifies the drawing set and reduces reconciliation between suppliers, which is where most hidden cost appears.
What information does a supplier need to give a firm price?
A dimensioned layout for each location, the appliance schedule, the selected finish and hardware standard, and confirmation of who provides benchtops, ventilation and service access. With those four inputs a quotation can be priced as fixed components rather than an allowance.
If you are assembling a laundry package for a villa, apartment or multi-unit project, send us the appliance schedule and layout drawings and we will price the stacked units and related cabinetry as separate, comparable line items — with a prototype approved before any batch is produced. Contact SANTERSON to start the specification.