A Santerson Double Vanity sits inside a wider bathroom sanitary fixtures package, and it rarely stalls on design. It stalls on sign-off: the interior designer, the builder, the MEP consultant, the client and the supplier all need to agree on the same drawing, at the same revision, before production starts. This guide sets out who signs what, in which order, and how to keep approvals moving when the vanity is made-to-measure and shipped from overseas.
Why Double Vanities Need a Separate Approval Track
A single basin can often be approved as one item on a schedule. A double vanity pulls several decisions apart at once: two users competing for the same mirror and counter zone; a countertop with two basins whose spacing has to suit both; storage that must work around waste pipework; and vanity lighting positioned over two sink positions rather than one.
Santerson vanities are configurable rather than fixed catalogue sizes. The product pages for the double, floating and integrated countertop ranges list made-to-measure sizing, material and finish options, and layouts tailored to each project. That flexibility is the reason approvals matter: every dimension, finish and cut-out you change downstream changes what the factory produces, and re-cutting a stone top after sign-off is expensive.
Who Signs What: A RACI Map You Can Copy
Before the first drawing is issued, name one owner per decision. The table below maps the usual roles on a villa or hospitality bathroom package; adjust the column names to match your contract structure.
| Decision | Owner (signs) | Consulted (comments) | Informed |
|---|---|---|---|
| Vanity type: wall-hung, floor-standing or integrated countertop | Interior designer / client | Builder, plumber | Supplier, FF&E buyer |
| Made-to-measure dimensions and clearances | Builder / site lead | Designer, supplier | Client |
| Basin positions, tap holes and mirror centre line | Interior designer | Supplier, electrician | Builder |
| Countertop material, edge profile and cut-outs | Interior designer / client | Supplier, stone fabricator | Builder |
| Vanity lighting position and switching | Lighting designer / electrician | Designer, supplier | Builder |
| Storage layout: drawers, pull-outs, waste routing | Interior designer | Supplier, plumber | Client |
| Finish and colour sample sign-off | Client / design lead | Designer | Supplier, procurement |
| Delivery window and install sequence | Project manager | Builder, supplier logistics | All parties |
The point of the table is that no decision has two owners and none has zero. Where a role is missing from your team, assign it explicitly to the project manager instead of leaving it shared.
Sequence the Approvals Around Production
Santerson's project services run through design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover. Your internal approvals should slot into that sequence rather than run in parallel with it, so each gate closes before the next stage opens.
Gate 1: Scope and layout sign-off
Confirm the bathroom set-out: which rooms take a double vanity, which take a single vanity, and which take a floating vanity. Wall-hung units need a framed or reinforced wall and a waste route; that is a builder's decision, not a designer's preference, and it should be closed before the client falls in love with a detail.
Gate 2: Dimensioned drawing sign-off
Issue one coordinated drawing per bathroom showing vanity width and height, basin centres, tap and waste positions, mirror and vanity lighting setting-out, and door or drawer swing. Every party signs the same revision number. A drawing signed at Rev B while production is instructed from Rev C is the most common cause of a failed vanity.
Gate 3: Material and finish sign-off
Sign finishes from physical samples, not screen images or renders. Cabinet colour, sheen level, handle type, countertop slab and basin fit are each approved against a sample the client has handled. Record the sample reference on the drawing so the factory and the site are looking at the same item.
Gate 4: Production release
Only after Gates 1 to 3 close does the specification become an order. From this point any change is a variation with a cost and a lead-time impact, and it should be logged as one. If your client reserves the right to change finishes late, agree which gates are genuinely frozen and which remain open.
Gate 5: Delivery, installation and snag sign-off
Book the delivery window against the site programme, not against the date the order was placed. Santerson's services cover door-to-door logistics as well as installation support, inspection and snags; whoever runs the site walk should be the same person who signed the drawing at Gate 2, because they are the one most likely to notice a mirror set off the approved centre line.
The Approval Pack: What Each Signatory Needs to See
Approvals slow down when people are asked to sign something they cannot read. Issue one pack, with the same contents to every recipient:
- A dimensioned elevation and plan for each bathroom, with revision number and date on the sheet.
- A vanity schedule listing unit type, size, finish code, countertop, basin and hardware per room.
- A services coordination sheet: water supply, waste position, power for lighting and any mirror demister.
- Physical finish samples with reference codes, or a signed sample board scanned and filed.
- The open-points list, showing who owes what comment and by when.
One pack, one revision number, one open-points list. If three parties each hold a different file, the approval you think you have is not the approval the factory will receive.
Common Failure Points and How to Close Them
Two users, one mirror zone
Double vanities fail on ergonomics before they fail on style. Check sight lines between the two basins, elbow clearance at the counter edge, and whether both users can reach storage without crossing the room. Get the client to stand in the set-out with tape on the floor if the layout is tight.
Countertop and basin fit confirmed too late
For a double basin countertop, basin spacing, cut-out type and the edge profile all interact with the cabinet below. Confirm the countertop material and the fit against the selected cabinet before finish sign-off, not after.
Integrated units approved as separate items
An integrated countertop vanity is one assembly, not a cabinet plus a top ordered separately. If the designer signs the carcass and a different party signs the stone, the joint detail and the basin integration fall between them. Assign integrated units to a single signatory.
Lighting signed after the wall is closed
Vanity lighting needs its outlet in the wall before plasterboard goes up. If the lighting designer has not signed the setting-out by Gate 2, hold that bathroom out of the first production release rather than assuming a default position.
Specification detail left open
Dimensions, countertop fit, materials, hardware and installation requirements are confirmed per configuration on Santerson's product pages. Treat any item you have not confirmed as an open point with a name against it, and do not let production release happen while open points remain.
Keep the Approval Log Where Everyone Can See It
A simple register per bathroom (gate, date, signatory, revision number, open points, owner, due date) removes most arguments. When a change request arrives, check it against the log first: if the gate is closed, it is a variation and priced as one. If the gate is still open, it is free and you should absorb it without drama.
For projects where the bathroom package sits inside a wider fit-out, coordinating cabinets, bathroom sanitary fixtures, lighting and finishes through one supplier shortens this loop considerably. A single specification holder means one set of drawings to sign instead of five, which is where most approval delays on villa and hospitality projects actually come from.
Next step: send your bathroom layout and the vanity schedule for each room, and we will return dimensioned drawings, finish options and a specification you can circulate for sign-off. Enquiries are handled directly by PHILLIP on +86-13928214007 (phone/WhatsApp) or santerson@qq.com.