Open corner wardrobes look simple on a drawing and complicated on site. Because they combine made-to-measure joinery with wall, floor and ceiling finishes that meet them at two angles, they need to appear in the materials schedule as a complete package, not as a single line item. This guide shows procurement teams how to specify them properly so the schedule matches what actually gets manufactured and installed.
Why Open Corner Wardrobes Are Easy to Under-Schedule
A corner wardrobe sits in the junction between two walls, and an open version removes the doors that would otherwise hide the interior. That single decision changes what has to be scheduled. With a closed unit, the inside faces are rarely seen; with an open corner wardrobe, every shelf side, hanging rail, back panel and edge band becomes a visible finish that must match the rest of the room.
Our built-in furniture ranges, including the Corner Wardrobes collection, are made to measure with material and finish options selected per project. That flexibility is exactly why the schedule has to be precise: "corner wardrobe" on its own does not tell the factory what edge profile, substrate or interior finish you expect, and it certainly does not tell the site team how the adjacent finishes should be resolved.
Treat the Wardrobe as a Package of Line Items
The most common scheduling error is one row for the wardrobe. In practice, each unit needs its own set of linked entries so nothing falls between trades. Split every open corner wardrobe into the following rows and give them matching reference codes:
- Carcass and back panels, with substrate and decorative face specified
- Shelves, hanging rails and any drawer units, with exposed edge treatment stated
- Open display sections and lighting provisions, if the design calls for them
- Adjacent wall finish, skirting or architrave that butts into the unit
- Floor finish transition at both legs of the corner
- Fixings, packing and any site-built blocking needed for a true right angle
When those rows share one code, a reviewer checking the schedule can trace the whole assembly. When they do not, the gap between the joinery contractor and the finishing contractor is where the variation order appears.
What Each Schedule Row Should Record
A row that only carries a product name is not usable for pricing or production. For open corner wardrobes, each entry should carry enough information to be quoted and manufactured without a follow-up query.
| Schedule Field | What to Record | Why It Matters for Open Units |
|---|---|---|
| Location and reference | Room, wall face, unit code, matching drawing number | Corner units are mirrored; a left-hand and right-hand return are not interchangeable |
| Dimensions | Both leg lengths, depth, height, and the finished ceiling line | Made-to-measure production starts from these figures, not from a nominal size |
| Substrate and face finish | Board type, laminate, lacquer or veneer, colour reference | Interior faces are on show in an open layout and must match exterior faces |
| Edge treatment | Exposed edge profile and colour at every visible shelf side | Unspecified edges are the usual source of site disputes on open shelving |
| Interior configuration | Shelf spacing, rail positions, drawer banks, display niches | Determines whether the unit is storage or display, and what fixings it needs |
| Interface details | Skirting, cornice, floor transition and wall return details | Tells the site team who closes the gap and with what material |
| Delivery and installation | Packaging type, delivery point, install sequence, snag list owner | Corner units must be installed after both wall finishes are complete |
Sequence the Wardrobe Against the Finishes It Touches
In a whole-project schedule, dates matter as much as descriptions. Open corner wardrobes sit late in the joinery sequence because they are boxed into two finished walls. Work backwards from handover:
- Confirm setting-out dimensions only after the wall finishes are built out, since plasterboard and tiling change the true corner dimension
- Release production drawings for approval before ordering boards, so finish samples and edge details are signed off together
- Schedule delivery after the wet trades in that room have dried, to protect panels and edges on site
- Leave installation before final cleaning and soft furnishing, so snags on visible edges can be handled while access is still open
Our project service covers this kind of coordination as part of the workflow from design and planning through production, logistics, installation and after-sales support. Where a project needs several wardrobe types across the same floor plan — L shaped corner wardrobes in bedrooms, open sections in dressing areas, closed storage elsewhere — grouping them under one production package keeps finishes and batch colours consistent.
Keep Finish Samples Linked to the Schedule
Open storage shows more surface area than a wardrobe with doors, so a finish that reads well on a small sample can look busy across a run of shelves. Before the schedule is frozen, attach approved physical samples to each finish code and record the sample reference in the row itself. That gives the site team one authority to check against when a delivery arrives, and it removes the argument about whether a delivered panel matches what was approved.
The same discipline applies to neighbouring products that share the wall plane. Where minimalist open wardrobes continue along an adjacent wall, the shelf depth and edge detail should be identical even if the unit type differs. Record that continuity in a note column rather than relying on the drawing alone.
A Practical Review Checklist Before You Issue the Schedule
- Does every open corner wardrobe have separate rows for carcass, interior fit-out and adjacent finishes?
- Are both leg dimensions, depth and height recorded for each unit rather than a generic size?
- Is the exposed edge treatment named for every visible shelf side?
- Do interior faces carry the same finish code as exterior faces?
- Is the installation date placed after both wall finishes are complete?
- Are sample references recorded against each finish code?
- Is one responsible party named for inspection and snags at handover?
Common gap to watch for: schedules frequently specify the wardrobe but leave the corner interface — packing, blocking and the floor transition — to "site to suit". For made-to-measure units that tolerance has to be agreed before production drawings are released, otherwise the delivered unit will not sit true against two finished walls.
Send us your schedule for a specification review
If you are assembling materials schedules for villas, hotels or apartment fit-outs, share the wardrobe rows with our team. We will confirm which details are missing before production is released, and quote the open corner wardrobes as one coordinated package alongside the rest of the interior fixtures.