A wardrobe enquiry that arrives with drawings, dimensions and a clear finish brief moves straight into quotation. One that arrives with only a photo of a showroom door usually stalls in a long exchange of questions. The difference is rarely the supplier's willingness to help — it is what the buyer had ready before the first message was sent.
This guide lists what to prepare before you contact a supplier about wood grain melamine wardrobes, and why each item changes the price, the lead time and the result on site. It applies whether you are fitting out a single apartment bedroom or ordering joinery across a villa or serviced-apartment project.
Why preparation changes the outcome
Melamine-faced panel wardrobes are made-to-measure products. The board, the edge banding, the door style and the internal fittings are all specified after the enquiry, and each choice pulls the quotation in a different direction. A supplier who receives room dimensions, a door type and a finish reference can return a priced bill of materials within days. A supplier who receives "I want something like this picture" has to guess — and guesses get corrected on site, at someone's cost.
Preparation also protects you when you compare quotations. Two suppliers quoting the same drawing with the same finish and hardware list produce numbers you can actually compare; two suppliers quoting a photograph produce two different products at two different prices.
The room data: send drawings, not impressions
- Width, height and depth of every alcove or wall run, measured in millimetres, plus the position of skirting, cornices, architraves and any protruding arch.
- Floor and ceiling condition. Note out-of-plumb walls, uneven floors and low ceilings. Built-in wardrobes are scribed or framed to fit; the supplier needs to know how much scribing work a run will need.
- Fixed obstacles. Power points, switch plates, air-conditioning returns, downlights in the ceiling line, radiators, and light switches that a door would cover when it opens.
- Door swing or slide envelope. For hinged doors, confirm there is clearance in front of the wardrobe for the door to open fully; for sliding doors, confirm the wall length available for the panel to stack.
- Access route at both ends. Lift dimensions, stair width, corridor turns and doorway heights where the assembled or flat-packed units must pass. A 2.7 m tall side panel that will not fit the lift becomes a split unit with a visible join line.
Decide the door type before you ask for a price
Door construction is the largest single driver of wardrobe cost, and it should be settled before the enquiry rather than during it.
| Door type | Where it works | What to confirm in the enquiry |
|---|---|---|
| Hinged (swing) doors | Bedrooms with clearance in front of the run; classic and shaker interiors | Number of doors, hinge type, whether handles or push-open are wanted |
| Sliding doors | Narrow bedrooms and corridors where a swing door would block circulation | Track type, number of panels, overlap allowance, wall length for stacking |
| Open shelving / walk-in | Dress rooms and villa master suites | Bay width, upright spacing, whether doors are dropped entirely |
| Mirrored or glass fronts | Small rooms that need reflected light | Glass type (clear, frosted, bronze, smoked), safety glazing requirement |
If you are still weighing options, look at the door families on the site first — matte sliding door wardrobes and hinged-panel ranges read very differently once installed, and choosing early keeps the quotation honest.
Specify the wood grain properly
"Wood grain melamine" covers a wide field of decorative papers, and two boards can share a name while looking nothing alike under site lighting. Give the supplier these details:
- Species reference and tone. Oak, walnut, teak-look, maple — and whether you want a light, mid or dark tone. Send a reference image and the room's flooring sample; wardrobe panels are usually specified against the floor, not against a catalogue photo.
- Surface texture. Matte, textured wood grain, high gloss or a synced-grain finish. Gloss shows fingerprints and reflections in a bright bedroom; matte is forgiving but reads flatter under low light.
- Board thickness and edge banding. Ask what thickness the carcass and doors use and whether the edge banding matches the face paper exactly. Mismatched edges are the fastest way to make a melamine wardrobe look cheap.
- Grain direction. State whether horizontal runs (drawers, plinths) should run grain-matched or contrast with vertical panels.
- A physical sample before order confirmation. Screens change colour. Request the actual melamine panel sample, and check it in the room's own lighting.
Related finishes in the same collection are worth comparing at sample stage: matte finish melamine wardrobes and textured melamine wardrobes sit alongside the wood grain range, and a single sample pack covering all three settles the decision quickly.
Plan the interior, not just the exterior
Buyers often spend the whole enquiry conversation on door finish and leave the internals vague. Internals decide day-to-day usability and are cheap to change at drawing stage, expensive to change after cutting.
- Hanging zones: single or double hanging rails, and the height of each rail. Long garments need their own bay.
- Drawers versus shelves: drawers cost more per bay but make deep cupboards usable; specify how many of each.
- Trousers racks, pull-out baskets, shoe shelves, jewellery trays, and where they sit in the run.
- Lighting: door-activated or motion-activated LED strips inside open bays need wiring routed to the unit before installation.
- End panels: whether an end of the run is exposed to the room, which changes the panel finish and sometimes the price.
- Soft-close hardware on doors and drawers, and the hardware brand if your project has a specification.
State the project context and quantities
A supplier pricing one bedroom and a supplier pricing forty identical bedrooms work differently, and you get better answers when the difference is stated up front. Include:
- Number of wardrobe runs or units, and whether bedroom layouts repeat.
- Project type — private residence, villa, serviced apartment, hotel — and the handover date you are working to.
- Delivery address and who receives goods on site; for overseas projects, whether you take delivery at the port or door-to-door.
- Whether other fit-out items come from the same supplier. Coordinating wardrobes with interior fixtures and vanities in one order keeps finishes, delivery windows and site coordination on a single schedule.
Questions worth asking before you commit
Who produces the shop drawings, and when?
For made-to-measure wardrobes, expect a drawing round after your measurements: elevations of each run with dimensions, door split, internal layout and finish callouts. Review these yourself against the site conditions. Production should not start until you have signed the drawing.
How are panels packed, and what arrives first?
Ask for the packing list format and whether hardware ships with the panels or separately. For multi-unit orders, confirm that all components of one wardrobe arrive together; a missing door set stops an installation.
What happens if a measurement is wrong?
Ask before ordering how replacement panels are handled, what they cost, and how quickly they can be produced. Replacing one door is routine; being told it cannot be done is the answer you want to avoid.
Can I see a completed reference?
Photos of finished installations in similar room conditions tell you more about a finish than sample offcuts do. Project references published on the supplier's own site are a reasonable starting point.
A short checklist before you send the enquiry
- Millimetre dimensions for every run, with obstacles and access route noted
- Door type decided, with quantities per run
- Wood grain species, tone, surface texture and edge-banding expectation written down
- Internal layout: hanging heights, drawer count, lighting
- Project type, unit count, handover date, delivery address
- Sample request included in the first message, not the fifth
- Signed shop drawings required before production, stated as a condition
Send that package and you are no longer asking "how much for a melamine wardrobe?" — you are asking for a quotation against a defined product. Suppliers answer that faster, price it more accurately, and install it with fewer surprises.