A swim spa quote is easy to compare on one number and hard to compare on the whole package. If your project centres on Outdoor Swim Spa WS-S06CT, the line items around that model decide whether you are buying the same thing as the competing offer in front of you. Below is what we ask buyers and project teams to verify before a purchase order goes out, using the published specifications for this model as the reference point.

Start from the shell dimensions, not the marketing name

Model codes in this product family are short and easy to misread. The catalogue lists WS-S06CT at 5880 x 2380 x 1400 mm, while the closely named WS-S06CT-L is listed at 6670 x 2380 x 1400 mm. That difference of nearly 800 mm in length changes the swimming channel, the deck space you need and the freight profile. Confirm that the dimensions printed on the quote match the drawing your site team measured against, and confirm which variant code appears on the packing list.

Depth matters just as much as length for a spa intended for lap swimming and hydrotherapy. At 1400 mm, this shell suits standing work and most jet positions; if your users expect deeper immersion, ask whether another shell in the range fits better rather than assuming this one can be modified.

Read the equipment schedule line by line

The published specification for WS-S06CT lists one control system, one swim training unit, one water pump, one filter pump, 31 jets in total and four LED lights. A quote that omits any of these is not cheaper; it is a different product. Check each item against the schedule rather than against the feature headline:

Item on the catalogue specificationWhat to look for on the quote
Control system, 1 setIs the controller included with its mounting and wiring interface, or priced as an option?
Swim training system, 1 setWhich swim unit is specified, and is it rated for the shell length quoted?
Water pump, 1 pc and filter pump, 1 pcAre both pumps named with flow and head data, or only as "pump set"?
Jets, 31 pcs totalIs the jet count for the quoted shell, and are jet positions shown on a layout drawing?
LED lights, 4Are fittings included with drivers, or listed under accessories?
Total power, 8.35 kWDoes the electrical section of the quote support that connected load at your supply voltage?

Where a specification sheet leaves an item blank, treat it as unresolved rather than absent. Some entries in this range list a swim training system and others do not; if your brief requires swim training, make sure the quoted configuration states it explicitly.

Separate standard features from options

Ozone sanitisation is shown as a standard feature for this model. Options that appear across the range include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each of these has a direct effect on running cost and on what your installer must connect:

  • Heat pump. Ask for the heating capacity and the stated power draw alongside the 8.35 kW total figure, so your electrical design is sized once rather than revised later.
  • Insulation. Relevant for cool-climate sites and for any spa that runs year round; ask what is insulated (shell, cabinet, pipework) and how it is protected from ground moisture.
  • Filtration. A sand filter changes the plant-room footprint compared with a cartridge arrangement, so confirm it before the deck layout is fixed.
  • Steps and access. Steps affect both the shell envelope and safe entry height; confirm whether they sit inside or outside the quoted dimensions.

Ask for options as numbered line items with a price against each one. Bundling them into a single "complete package" figure hides what you can drop or defer if the budget moves.

Match the model to the use case before comparing prices

Within this range, similar footprints deliver very different experiences. WS-S06C shares the 5880 x 2380 x 1400 mm shell but is specified with three water pumps, 33 jets and a total power figure of 9.95 kW, with temperature setting listed among its features. WS-S06 is a shallower 5820 x 2220 x 1110 mm shell with 56 jets and waterfall features, which points toward hydrotherapy rather than swim training. A quote that substitutes one for the other without saying so is the most common reason two "identical" spas arrive with different operating characteristics.

Where a project needs a longer swimming channel or a custom shape for a terrace or garden, our Customizable Shape Outdoor Spa and Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool are the alternative routes. Both sit in the same product range and are quoted from your drawing rather than a fixed catalogue code.

Check what sits outside the spa

The equipment schedule is only half of a swim spa procurement. Before signing, confirm these commercial and site items in writing:

  • Electrical responsibility. Who supplies the dedicated circuit, isolator and protection device, and what supply voltage and phase configuration is the quoted equipment built for?
  • Base and access. Who prepares the load-bearing base or deck, and is the delivery route wide enough for the shell on the packing list?
  • Freight terms. Under Furniture Logistics and Door-to-door Delivery, we arrange sea, air and rail freight with customs paperwork and container loading plans. Confirm the Incoterm, the destination charges and who handles local rigging.
  • Commissioning. Ask what start-up support is included, what site conditions must be ready for it, and which items are covered under Installation & After-sales Support.
  • Spare parts. Confirm which pumps, jet nozzles, drivers and controller modules are held as spares for the model you order, since these wear differently across configurations.

Local building approval, electrical certification and any fencing or barrier requirements are arranged by the party appointed on your project. We supply product data, drawings and packing details to support those applications; we do not certify local code compliance on your behalf.

A quick pre-order checklist

  • Variant code on the quote matches the shell dimensions you measured against.
  • Every item in the catalogue specification is either included or explicitly excluded with a reason.
  • Options are priced individually, with power draw stated for heat pump and pumps.
  • Electrical section states supply assumptions against the quoted total power figure.
  • Freight term, delivery point and rigging responsibility are named.
  • Commissioning scope, warranty terms and spare-parts list are attached, not promised in an email.

If you want a second reading of a quote you already hold, send it over with the site drawing and we will mark up what is missing against the WS-S06CT specification. As part of our Turnkey Interior Project Solutions, a swim spa can be coordinated with the surrounding deck furniture, outdoor lounge and interior fit-out under one project scope.

Send the model code, your site drawing and the quote you are evaluating to the SANTERSON team, and we will return a specification-by-specification comparison for the configuration you actually need.