A pool deck order rarely arrives as one crate of identical loungers. On a resort or hotel project, the sun-lounger line has to match the layout drawing, survive several weeks at sea, clear customs, and still land ready to place on the deck without a re-order. This guide walks through how we plan international delivery for the Aluminum Sling Sun Lounger Collection, Multiple Frame Designs with Adjustable Backrest as a project order — from locking down frame versions and finishes to loading the container and handing over on site.
Start with the deck layout, not the lounger count
The Aluminum Sling Sun Lounger Collection is built for commercial poolside use: a textilene sling mesh that stays cool in direct sun and dries quickly after splashing or rain, on an aluminium frame treated to resist chlorine and salt air. Within the family you choose between a static sled base, a wheeled version for layouts that get reconfigured, and a folding version for venues that stack furniture out of the way — all with backrest adjustment.
Before any quantity is fixed, send us the pool deck plan or a marked-up drawing showing:
- the walking aisles and spacing your staff need between loungers, plus how many units sit in each block;
- which positions are permanent and which get moved for events, cabana set-ups or pool service — that decides the split between sled base, wheeled and folding frames;
- where shade structures, planters, steps and handrails interrupt a row, so end units can be sized differently;
- storage location for off-season or stacked units, which is usually what makes the folding frame the cheaper option over the life of the project.
This one step prevents the two most common delivery problems: a container that arrives with the wrong frame mix, and a deck that cannot physically take the number of units on the purchase order.
Lock finishes and sling colour before production starts
Frame finish and sling colour on this collection can be customised to the project palette. Because colour and coating are decided at material purchasing, a change after production begins means a new batch — and a new delivery window. We recommend confirming these items in writing with your designer or architect before we book materials:
| Item to confirm | Why it affects delivery |
|---|---|
| Frame finish (powder coat colour, and whether the venue is coastal or heavily chlorinated) | Coating choice is fixed at the paint line; a late change restarts that stage of production. |
| Sling mesh colour and any two-tone layout across the pool deck | Mesh is bought by the roll. Mixed colours split one order into separate material lots, which can move the ready date. |
| Backrest mechanism per position type (stepless or multi-position) | Different mechanisms are assembled on different lines, so a mixed specification needs to be planned in the schedule, not added at packing. |
| Any branding, host stand or side-table pairing | Cross-referenced items should ship together; ordering them separately multiplies freight and customs handling. |
If your project needs non-standard dimensions, a private label, or a finish taken from a sample board, our custom furniture design and prototyping service covers bespoke materials, finishes and branding — worth settling at the same time as the lounger specification so everything leaves on one shipment.
How we group a project order into containers
Loungers are bulky but light relative to their volume, so the shipping plan is driven by cube, not weight. For a poolside package we normally consolidate in three stages:
- Split by frame version. Sled base, wheeled and folding units pack differently. Keeping them in separate labelled bundles means the site team can unload block by block against the deck plan instead of sorting a mixed pile.
- Pack for the sea leg, not the factory floor. Frames are protected at contact points, corners and castors; sling meshes are packed so they do not crease under load. On part-load and multi-port routings, cargo is handled many more times than on a full container, so protection spec goes up accordingly.
- Bundle with the rest of the outdoor package. Side tables, umbrellas and daybeds from the same phase ship together wherever ready dates allow. Our furniture logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading, so one consolidated shipment is usually simpler than three small ones.
Choose the routing on your site programme, not on freight price alone
Sea freight is the default for a full poolside order; air becomes relevant when a topping-up quantity has to reach a venue before an opening date. Our furniture freight by sea, air and rail options are quoted against your handover date, working back from it:
- production ready date for each frame version;
- the sailing or service window that follows it — a missed week at booking is a missed week on the water;
- port handling and clearance time at the destination, which is where part-load cargo usually loses days;
- the inland leg to the site, including whether the venue has a dock, a lift, or only a gate that a truck can turn into.
We prepare the commercial invoice, packing list and certificate of origin with the shipment, and import permits are handled where they apply. Cargo insurance is available as an option. Exact Incoterms, duties, transit time and the point where our delivery responsibility ends are confirmed per project in writing — the figures on a quotation are for your routing, not a general promise.
A practical rule: order the fixed positions first and hold the flexible ones. Sled base loungers rarely move once placed, so they can be produced and shipped early. Wheeled and folding units are the ones a venue re-specifies during fit-out, so booking them in a later tranche protects you from paying for a change you have not yet decided on.
Plan the receiving side before the container is booked
Delivery does not end at the port. Before we load, confirm with your site team:
- a named receiver and a date window when the deck area is clear of other trades;
- unloading equipment — a forklift or pallet truck for bundled frames, and enough storage that nothing has to be stacked in a corridor;
- the sequence for assembling wheeled castors and setting backrests, so units go straight to their positions;
- a joint inspection against the packing list while the packaging is still on site, so any transit damage is recorded on the day it is found.
Our on-site installation and after-sales support covers snag inspection, warranty coverage and spare parts once the furniture is on site. For a sling lounger line specifically, keep the mesh and hardware spares on your maintenance list: pool decks are high-turnover areas, and replacement slings are far easier to store than a full replacement frame.
A short checklist for your enquiry
To move from enquiry to a firm delivery plan in one round, send us:
- the deck drawing with lounger positions marked, and the quantity per frame version;
- frame finish and sling colour references (sample number or image);
- destination port or site address, and your required handover date;
- your preferred Incoterms and who clears customs at destination;
- any items to consolidate with the loungers — tables, umbrellas, daybeds, side units.
With those five inputs we can quote production, packing, freight and delivery to your site as one package rather than a series of separate costs. Send the drawings and quantities through the custom furniture and OEM service enquiry, or start from our outdoor furniture range, and we will come back with a container plan for your pool deck order.