A round mirror cabinet looks like a small item on a bathroom schedule, which is exactly why it gets specified late and quoted wrong. Once you have decided on the Santerson Round Mirror Cabinet, the difference between a clean quotation and three weeks of back-and-forth comes down to what you hand the supplier on day one. Below is the information list we work from on residential bathroom projects, and why each item changes the price rather than just filling in a form.
Why a Round Mirror Cabinet Is Quoted Differently from a Rectangular One
The Santerson Round Mirror Cabinet belongs to our Mirror Cabinets collection, made for residential bathroom projects with project-specific dimensions and finish options. The published configuration covers made-to-measure sizing together with material and finish choices, so there is no single catalogue price to point at.
The circular outline drives most of that difference. A round front means the mirror, the carcass edges and the door cut are all curved work, and the storage layout inside has to be planned around a circle instead of a rectangle — shelf depths taper toward the edge, and what fits in the middle does not fit near the rim. Two cabinets with the same diameter can therefore carry very different internal layouts, hardware sets and finish areas, which is why an incomplete enquiry produces an incomplete number.
The Six Details That Decide the Quote
1. Overall diameter and depth, plus how it will be mounted
Give the finished outer diameter you want and the case depth, then say whether the unit will be fixed to the wall or sit as a surface-mounted piece. Depth matters more than most buyers expect: it sets what the door can hold, how far the cabinet projects past the basin, and whether it clears the tapware and the mirror-light zone when someone stands at the vanity.
2. What goes inside
Tell us how the cabinet will actually be used — daily toiletries, hair tools, medicines, cleaning products, or stock for a guest bathroom. Internal layout is where we need your input rather than ours: adjustable shelving, a shallow door rack, an open section below the circle, or a plain single compartment all quote differently, and each one changes the hardware count.
3. Material and finish
The collection lists material and finish options, so name the finish you are matching — paint tone, wood grain, laminate or lacquer — and say what it has to sit alongside in the room. If your bathroom already has a chosen vanity, wall panel or wardrobe finish, send that reference too; matching a sample is far faster than describing a colour in words.
4. Lighting and any electrical work
If you want an illuminated unit, say so at the enquiry stage rather than after the quote. Our Santerson LED Mirror Cabinet is a separate configurable model in the same collection, and lighting and electrical specifications need confirming for each project — supply, mounting position and how the cable reaches the wall. Deciding this late usually means a revised drawing, not just an extra line on the invoice.
5. The rest of the bathroom package
Mirror cabinets rarely travel alone. If your project also needs basins, WC suites, shower sets, vanity tops or bathroom sanitary fixtures, list them in the same enquiry. Grouping items lets us check clearances and finishes across the room, plan one shipment instead of several, and quote the package as a whole — which is how we handle the wider fit-out on our turnkey villa and hospitality projects.
6. Quantity, location and delivery terms
State how many units you need, the rooms or apartments they are for, the delivery address and the incoterm you work to. One cabinet for a single home and twelve cabinets across a villa or small hotel are different production runs, and packing is designed around the quantity and the destination.
How Those Details Reach Us
| Detail you provide | What it determines in the quote |
|---|---|
| Outer diameter and case depth | Carcass size, curved front work, projection past the basin |
| Mounting method and wall build-up | Fixing hardware, whether a reinforcing backing is needed |
| Internal layout and use | Shelving, door storage, hardware count |
| Material and finish reference | Panel choice, surface area, matching with other joinery |
| Lighting decision | Illuminated or plain front, electrical specification |
| Quantity, rooms, address, incoterm | Production run, packing, freight plan |
A Quick Pre-Enquiry Check
- Measure the wall space, then measure the basin and tapware projection so you know the maximum case depth that still works.
- Note the height of the basin rim and the mirror-light position, since both constrain where a round front can sit.
- Pick the finish before you enquire, and keep the sample reference or photograph to hand.
- Decide on lighting now; if you are undecided, ask for both options quoted.
- List every other bathroom item you still need so the enquiry is handled as one package.
What Happens After You Send It
With those six items in place, we can come back with a specification rather than a set of questions: proposed dimensions, internal layout, finish, hardware and price. If the drawing needs adjusting, that happens on paper before production starts. As part of our custom and OEM service, bespoke sizes, finishes and layouts are handled at this stage, and where a project team would rather not do the measuring themselves, our interior design services cover space planning and product specification for the room.
Ready for a quotation? Send the diameter, depth, mounting method, internal layout, finish reference, lighting decision and quantity, and we will specify the Santerson Round Mirror Cabinet for your bathroom project.
Contact SANTERSON — Phone / WhatsApp +86-13928214007 (PHILLIP) · Contact page