A door schedule that reads "hinged doors, as per drawing" is where most interior door packages go wrong. The variations sit in details that are invisible at the elevation stage: how the leaf meets the floor covering, which direction it swings against a corridor line, what the finish has to match once the joinery arrives on site. If you are sourcing windows and doors alongside cabinetry and other fit-out items from one manufacturer, the brief is the only document that carries those decisions forward into production. This guide sets out what to write down for a classic panel hinged door package, using our Classic Panel Hinged Doors as the reference product.
Start with the opening, not the leaf
Our hinged door collection is made to measure, so the brief should carry finished opening dimensions rather than nominal leaf sizes. For every opening record the structural opening, the intended finish floor level on both sides, and the floor build-up you are working to: a 12 mm engineered board and a 20 mm porcelain tile with adhesive change the undercut and the frame reveal. Note wall make-up too, since a masonry reveal, a stud partition with noggin blocking, or a tiled bathroom wall each call for a different fixing detail and architrave decision.
Then state the tolerance you expect on site. On a refurbishment where openings have been plastered over several decoration cycles, dimensions drift; say so in the brief and ask for a site survey step before the drawings are frozen. That single line prevents the most common door package failure: hardware ordered to a size nobody verified.
Fix the swing, clearance and hardware schedule
Per opening, specify the hand (left or right, push or pull), the leaf width against the traffic route, and whether the door needs to clear a wall return, a tapware projection or a piece of loose furniture. For accessible rooms and corridors, confirm the clear opening width you are designing to and make sure the lining thickness is included in that number, not assumed away.
Hardware belongs in the same brief as the door, because leaf thickness, core build and cut-outs all depend on it. List hinge type and count, lock case format and backset, handle material, closers, threshold and drop-seal requirements, and any access-control prep. Where a project mixes hardware suppliers, say which party supplies what, since an interface gap discovered during installation is far more expensive than the same gap found on paper.
Describe the panel and finish in matchable terms
"Classic panel" covers a wide field of routings, so describe what you actually want: number of fielded panels, rail and stile widths, the depth and profile of the moulding, whether the stiles are full length or applied, and how the panel detail should relate to the architrave and skirting on the same elevation. Reference the room or elevation number where the door appears, so the person preparing the drawing can see the surrounding joinery rather than the door in isolation.
For finish, avoid colour names alone. Give the substrate you expect under the finish (painted MDF, veneered engineered board, solid timber) and state whether the surface is sprayed on site or factory-finished at the plant. Where a door has to match interior fixtures such as wardrobes, wall panelling or cabinetry in the same room, put that matching requirement in writing and ask for a physical sample board before production runs. Veneer figure, sheen level and grain direction are decisions you want settled on a sample, not argued about after delivery.
Put the whole door family in one brief
Most projects do not need one door type; they need a coordinated set. Grouping the openings by detail rather than by room makes the package easier to price and easier to check on delivery:
| Door family | What the brief must add beyond size |
|---|---|
| Classic panel hinged doors for bedrooms and suites | Panel layout, architrave profile, undercut against floor build-up, leaf height consistency across a level |
| Flush and concealed details, e.g. Santerson Flush Hinged Doors | Wall build-up detail, shadow gap width, concealed hinge type, decoration continuity with the wall finish |
| Space-saving openings such as pocket and sliding | Cassette depth in the partition, track position, floor guide, acoustic expectation at the reveal |
| Feature openings such as French and folding | Leaf count, mullion layout, glazing type, ironmongery load path on wide spans |
One brief across these families keeps heights, reveals and finishes consistent storey by storey. It also lets a turnkey furniture and building materials supplier coordinate doors with the joinery made on the same production line, which removes the mismatch between door frames and adjacent cabinetry that so often shows up at handover.
State the interface scope before quotation
Ask each supplier to confirm in writing what their price covers: frames and architraves, ironmongery, seals and thresholds, packing and protection for site, delivery sequence by floor or zone, and installation or fixing guidance. If your contract includes a logistics and door-to-door delivery arrangement, name the delivery address, access constraints and receipt process in the same document, so container loading and packing can be planned around the site sequence instead of arriving as a single undifferentiated drop.
For custom work, request shop drawings for approval before tooling starts. That is where the swing, undercut, panel profile and hardware cut-outs get checked one last time, and it is a normal step in a custom and OEM service, not an extra to be negotiated.
A quick pre-issue check
- Finished opening dimensions and floor build-up stated for every opening
- Hand, swing direction and clear opening width confirmed per room
- Hardware schedule with supplier split identified
- Panel layout, architrave profile and finish substrate described, not just named
- Matching requirement to adjacent joinery flagged, sample board requested
- Shop drawing approval step written into the programme
- Delivery address, access constraints and packing sequence specified
Send that brief with a room-by-room schedule and the elevations it refers to. The tighter the document, the fewer questions come back, and the closer the delivered package is to the drawings you signed off.