A glass pocket door looks simple on a drawing: a panel that disappears into a wall cavity. On site it is one of the few openings where the interior designer, the architect, the builder and the joinery supplier all have to agree before anything can be cut. When those approvals are gathered in sequence rather than in parallel, the usual result is a framed opening built to the wrong depth, a revised order, and a door that arrives after the wall has been closed. The steps below show how we walk our clients through the approval path for Santerson Glass Pocket Doors, what each party signs off, and which decisions have to be frozen before production starts.

Who Actually Signs Off a Pocket Door

Pocket doors sit across three trades, which is why approval lists get long. Before you send anything for signature, name the decision owner for each item. In most villa and hospitality projects we supply, four parties are involved:

  • The designer or design studio — approves glass type, frame profile, visible finish, and how the door reads against the surrounding wall lining.
  • The architect or building designer — confirms that a pocket arrangement is acceptable at that location, including clear opening width, any fire or acoustic expectation for the compartment, and access to the cavity for servicing.
  • The builder or site contractor — confirms the structural framing, the cavity build, floor finishes and thresholds, and when the frame must be on site relative to wall closure.
  • The client or asset owner — signs the finish sample and accepts what the door does and does not do once installed.

Writing those four names against a short list of decisions is usually enough to stop the loop. If one item has two owners, it will be approved twice or never; if one item has no owner, it becomes an on-site variation.

Stage 1: Confirm the Door Type Before Approving Details

The first approval is not a finish, it is the operating type. A pocket door slides into a wall cavity; a surface-mounted sliding door travels along the face of a wall and needs no cavity but shows the track. Both are made-to-measure in our windows and doors range, and both can be specified with glass panels.

Ask the builder one question at this stage: is there a wall thick enough, and unobstructed enough, to receive a pocket frame for the full height of the opening? Services, structural studs, insulation and heavy linings all compete for that cavity. Where the answer is unclear, compare the arrangement against Santerson Flush Sliding Doors or Santerson Wooden Sliding Doors, which solve the same space problem without a recessed pocket. Settling this before detail approval avoids re-cutting an opening that was built for the wrong system.

Stage 2: Freeze Dimensions Against Site Conditions, Not Drawings Alone

Glass pocket doors are made to the dimensions of the finished opening, so the dimension sheet must reflect completed floor levels and completed wall finishes. The items we ask to be confirmed in writing before an order is released:

DimensionWho confirms itWhy it fails later if left open
Rough opening width and heightBuilderA pocket frame cannot be shortened on site without rebuilding the cavity.
Wall build-up and cavity depthBuilder / architectThe panel plus hardware needs depth; a shallow wall forces a change of door type.
Finished floor level at both sidesBuilderThreshold and bottom guide depend on the completed finish, not the slab.
Closing rebate and lining detailDesignerGlass panels meet linings differently from timber panels; the reveal must be drawn once.
Number of leaves and parking sideDesigner / clientFurniture layout decides which side the panel parks on. Moving it later means new framing.

For a project where the door is specified in more than one bathroom, study or ensuite, ask for a dimension sheet per opening rather than one repeated schedule. Openings in the same building rarely end up identical once finishes differ.

Stage 3: Approve Glass and Finish on a Physical Sample

Glass reads differently against tile, stone and painted lining than it does on a specification sheet. Before production, we ask the designer and client to approve the frame finish and glass selection from samples held against the actual wall material. The product page for these doors lists material and finish options as project-specific, so treat the sample you approve — not the catalogue image — as the reference for the order.

  • Glass appearance — clear, frosted or ribbed glass changes how much light passes between rooms. In a bathroom or study, that privacy question belongs with the client, not the builder.
  • Frame colour and profile — confirm it against the wall lining under site lighting, since a frame finish shifts noticeably against warm stone or dark joinery.
  • Ironmongery and handle — recessed pulls and flush handles need to be decided with the panel build, not added afterwards.

Record the approval as a dated sign-off naming the sample reference. That single line protects you when a second batch is ordered months later for another floor.

Stage 4: One Consolidated Approval Sheet, Signed Once

Rather than circulating four separate emails, put the decisions on one sheet and have it returned signed. A practical approval sheet for a pocket door order carries:

  • Project name, opening reference and quantity per opening
  • Confirmed rough opening dimensions and wall build-up per opening
  • Door type and parking side, with the layout sketch initialled
  • Approved glass type and frame finish, with sample reference
  • Hardware selection and who supplies it
  • Delivery address, required on-site date, and the date the frame must arrive relative to wall closure
  • Names and dates of the four approvers above

Once that sheet comes back, the order goes into production against it. Anything changed after that point is a variation with a cost and a lead time attached, so it is worth pushing for the signature before you release the order rather than during manufacture.

Stage 5: Site Handover Approval After Installation

The final sign-off happens after installation and should be walked with the builder present. Check that the panel runs without binding, that the bottom guide is fixed to the finished floor, that the frame is square within the lining, and that glass surfaces are clean and free of edge damage. Snag items written into the handover record at this point are far easier to settle than ones raised after the client has moved in.

Materials, dimensions and finish options for these doors are specified per project. The figures on a product page are indicative; confirm the final sizes and selected specifications against your own signed approval sheet before ordering.

How Our Team Supports the Approval Process

Because pocket doors touch framing, glazing and finishes at once, we handle them as part of the wider fit-out rather than as a standalone purchase. Under our turnkey interior project solutions, drawings and production coordination sit alongside cabinetry, wall linings and other joinery in the same package, so the opening, the door and the surrounding finish are approved against one coordinated set of details instead of three separate orders. Where a design calls for a bespoke arrangement, our custom furniture design and prototyping service covers material and finish development before the approval sheet is issued.

Freight and installation are planned from the same schedule. Door frames reach the site on the date the builder needs them, ahead of wall closure, through our logistics and door-to-door delivery service, with finishing and snagging handled under installation and after-sales support. That single chain of custody is what keeps the approval sheet valid from signature through to handover.

Checklist Before You Release the Order

  • Operating type agreed with the builder, and cavity depth confirmed
  • Dimensions taken against finished floor levels and completed linings
  • Glass and frame finish approved from physical samples by designer and client
  • Hardware selected and its supplier named
  • Delivery date fixed against the wall-closure programme
  • One signed approval sheet on file, naming all four approvers

Send us your opening schedule and finish preference, and we will return a dimension sheet and specification for each location so the approvals can be gathered in one pass.

Talk to our project team about glass pocket doors for your villa or hospitality project.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Send your opening schedule and finish preference