A floating TV unit looks simple on a rendering: one clean horizontal volume, no legs touching the floor, cables hidden behind it. That simplicity is exactly why an OEM order can go wrong. The dimensions have to match the wall, the substrate has to carry the load, and the opening for the screen has to line up with the joinery that arrives in containers weeks later. Here is how sourcing these units from a China-based manufacturer actually runs, stage by stage.
What OEM sourcing means for this product
OEM work is not buying an item from a catalogue. You supply the requirement; the factory builds to it. For Floating TV Units, the published specification is deliberately open: made-to-measure sizing, material and finish options, and a layout tailored to the project. Nothing about length, depth or carcass construction is fixed until your drawings are confirmed.
SANTERSON's Custom & OEM service covers custom furniture design and prototyping, bespoke finishes and textures, OEM manufacturing, flexible minimum order quantities, and brand customisation such as engraving, embossing, logos and packaging. If you are a builder, a joinery firm or a furnishing distributor placing units under your own name, that branding scope is part of the same order rather than a separate contract.
Stage 1: The brief and the wall condition
Send the manufacturer what you would send any subcontractor: room dimensions, the wall elevation, the screen size and its mounting pattern, plus which devices will sit inside or behind the unit. A floating unit is only as good as the wall behind it, so the substrate matters as much as the carcass. Solid masonry, timber studs and steel framing each need a different fixing detail, and that detail should be agreed before production, not discovered on site.
Decide early how far the design sits from other built-in work. A media wall that also carries shelving or closed storage is often specified across more than one product line, so confirm which party owns the interface between them.
Stage 2: Drawings, finishes and prototyping
Once the brief is in, the manufacturer returns layout and dimension drawings for your sign-off. This is where you settle the things that are expensive to change later:
- Overall width, depth and the projection from the finished floor level.
- Carcass material and the finish surface: laminate, lacquer, veneer or acrylic, matched to the cabinetry already specified for the rest of the project.
- Open versus closed storage, drawer banks, and where equipment ventilation is required.
- Cable routes and access panels, checked against the position of sockets and the screen's own cable drop.
- Lighting provisions. If the design calls for lit niches or a lit shelf, Integrated LED Media Units is the comparable line to reference, and the electrical detail (driver location, feeder point, switching) needs confirming for the selected design.
Prototyping and 3D modelling sit in this stage. For a repeat order across several villas or hotel room types, one approved prototype plus a signed finish sample is worth more than ten email exchanges.
Stage 3: Quotation and what to check line by line
Read the quotation as a scope document. Alongside unit price, confirm the quantity break, the MOQ that applies to your finish choice, packaging standard, container loading plan, and which Incoterms apply to your destination.
Ask explicitly what is not included: on-site wall preparation, first-fix electrical, and any local trades you will still need. MOQ flexibility is a stated feature of the OEM service, but the practical number depends on material and finish. A standard laminate in an existing colourway behaves differently from a bespoke veneer or a custom lacquer colour, where batch minimums come into play.
Stage 4: Production and quality control
Production runs against the signed drawings. Before goods leave, ask for the checks that matter on wall-hung joinery: panel squareness and edge banding, hardware schedule against the packing list, finish colour under neutral light, and pre-assembly of the mounting frame so the fixings on site are a repeat of what was tested at the factory.
Stage 5: Freight, customs and delivery to the door
The logistics service covers freight forwarding by sea, air and rail, along with commercial invoices, packing lists, certificates of origin and import paperwork, packaging and container loading, shipment tracking, and door-to-door delivery. For floating units, insist on the mounting hardware and fixing packs being packed and labelled separately from the panels, with the assembly sequence printed on the carton.
Import terms are decided per project. Duties, insurance cover, port of entry and final delivery address all change the landed cost, so get your own broker's confirmation rather than relying on a supplier's estimate.
Stage 6: Installation, snags and after-sales
Installation and after-sales support covers on-site installation, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. For a wall-hung unit, the handover check is short and specific: level and plumb, no deflection under the screen's weight, doors and drawers aligned after the building has settled, cable access clear, and lighting drivers reachable.
A short pre-production checklist
- Final dimensions against the as-built wall, not the design drawing.
- Wall substrate and the agreed fixing method and hardware.
- Screen size, weight and VESA pattern; equipment list and ventilation.
- Finish sample signed off against the project's other cabinetry.
- Electrical feeder point, driver location and switching for any lit element.
- Incoterms, packaging standard, container plan and named delivery address.
Product pages for configurable built-in items list finish, layout and dimension options rather than fixed technical values. Dimensions, load ratings, hardware, safety and lighting specifications should be confirmed for each project before order release, and warranty terms and response times should be read in the contract rather than assumed from marketing copy.
Ordering media walls as part of a wider package
Most buyers do not order one unit. A villa or apartment handover needs the TV volume to match the wardrobes, kitchen and vanities in the same finish. Sourcing them together through a one-stop furniture and building materials supplier removes the colour-matching argument between separate factories and puts one production schedule behind the whole joinery package. Related lines in the same group include Wall Mounted Media Walls for full-height treatments and Integrated TV Panels where the screen sits inside a paneled wall.