A metal frame open wardrobe is one of the few built-in items where every surface stays visible after handover. There is no door to close, no panel to hide behind. That is exactly why a finish sample approved before production matters more here than it does for a closed cabinet: the frame profile, the shelf edges and the interior panels are all in plain view, day after day, under bedroom lighting you cannot easily change later.
The sequence below is how our project team handles sample approval on Metal Frame Open Wardrobes and the rest of the Open Wardrobes collection. Every item in our built-in range is made to measure, with material and finish options selected per project, so the sample stage is where a drawing becomes a physical decision rather than an assumption.
Why open wardrobes expose finish problems faster
In a hinged or sliding door wardrobe, the interior carcass is only seen when someone opens the door. In an open wardrobe, the interior and exterior are the same thing. Three practical consequences follow:
- Lighting hits every surface. Recessed shelf lighting and integrated cabinet lighting wash the frame from close range. A metallic or wood-grain finish that reads evenly under a shop light can band, glow unevenly, or look flat once a light source sits 300 mm away from it.
- The frame profile is a long, thin line. Metal framing shows coating thickness and edge coverage far more clearly than a wide flat panel. Corners, mitres and cut ends are where colour drift first becomes visible.
- Adjacent materials sit side by side. Frame, shelf board, back panel, hanging rail and any glass or stone nearby are viewed together. Approving one sample in isolation is how a mismatch reaches site.
What to ask for before you approve anything
Ask for the sample set as a package, not as single loose offcuts. A useful request covers the following:
| Item to receive | Why it is needed |
|---|---|
| Metal frame profile sample, full length, including one cut end and one corner | Shows coating coverage on edges and mitres, not just the flat face you would otherwise judge |
| Shelf and carcass board sample with edge banding applied | An unbanding offcut tells you the board colour but not how the joint line reads |
| Back panel or wall panel sample in the selected finish | The largest visible area behind hanging clothes; sets the tone of the whole unit |
| Hardware and rail sample in the selected metal tone | Rails, brackets and any handles need to match the frame tone under the same light |
| A written specification sheet naming each finish as produced | Gives you a reference to check the delivered goods against at inspection |
How to judge the samples on site
Judge the samples in the room where the wardrobe will stand, not on a desk in an office. Then check these points:
- At three light conditions. Daylight from the window, the ceiling light switched on at night, and the shelf or integrated lighting if that is part of the design. Note which condition makes the finish look wrong; a single reading is not enough.
- Against the neighbouring finishes. Lay the frame sample against your flooring, wall panel and any stone countertop in the same space. Our catalogue spans engineered wood flooring, decorative wall panels and stone and marble surfaces, so cross-material matching can be handled with samples from the same project rather than left to chance.
- At the viewing distance of the room. Step back three metres and look again. A texture that looks attractive close up can read as a busy pattern across a full-height open unit.
- On the edge, not only the face. Run a thumbnail along the cut end and corner of the metal sample. Bare metal, thin coating or a lifted edge banding line should be settled now, while it is still a sample.
Decide the interior as deliberately as the exterior
With an open unit there is no separate "inside" colour. If you want hanging clothes to read calmly against the wall behind them, a quieter back panel finish usually works better than a strong grain. Where a display effect is wanted, a textured or stone-look panel does the opposite job. Decide which of these two effects the room needs before choosing the sample.
Recording approval so it protects you later
Once a finish is accepted, record it in one line per item: reference code, room or unit it applies to, date, and who signed it off. Keep the physical samples with the project file rather than returning them all to us. At delivery inspection, that file is what you compare against, and it is also how any follow-up order for a second phase matches the first.
Where a finish cannot be sampled before production because of a project schedule, ask for the specification to be confirmed in writing on the drawing instead, and state clearly which surface treatments are excluded from that decision. That keeps the record honest about what was actually reviewed.
What our team handles at this stage
SANTERSON works as a furniture and building materials manufacturer supplying built-in furniture, interior fixtures and finishes for villa, hospitality and office projects. For wardrobe work this means one supplier covering the frame and carcass finishes together with the surrounding wall panels, flooring, lighting and stone surfaces that have to match them. Our Custom & OEM Service covers bespoke material finishes and textures, prototyping and made-to-measure dimensions, so the sample you approve is the specification we produce against.
Related collections in the same open configuration include Minimalist Open Wardrobes, Wall Mounted Open Wardrobes and Wood Tone Open Wardrobes. Where a bedroom also needs kitchen or pantry joinery in the same finish, our Custom Built-in Kitchen Cabinets are specified the same way, which keeps one finish code across the whole floor.
Sample review checklist before production release
- Frame sample includes a cut end and a corner, not only a flat face
- Board samples received with edge banding applied
- All samples carry the same reference code as the drawing and quotation
- Judged in the actual room, under daylight, ceiling light and shelf lighting
- Checked against flooring, wall panel and stone finishes already selected
- Interior back panel finish chosen on purpose, not left to default
- Approval recorded with code, location, date and sign-off name
- Samples retained in the project file for delivery inspection