A parquet floor is one of the few finishes that changes how an entire villa or hotel room feels underfoot, so it is rarely the item a buyer is willing to guess on. If you are specifying European Oak Engineered Parquet Flooring for a project and want a quotation that actually reflects your job rather than a generic price list, the difference between a fast answer and a slow one usually comes down to what you put in the enquiry. This guide walks through exactly what to send, what we confirm back, and how the process runs from first message to delivered crates.
Why parquet is quoted per project, not off the shelf
Parquet is laid in a pattern, and patterns generate waste. A herringbone layout in a long narrow corridor behaves completely differently from the same pattern in a square banquet anteroom, even when both rooms cover the same number of square metres. Board size, laying direction, room geometry and the detail at skirting thresholds all feed into the quantity you actually need.
Our European oak parquet is an engineered product: a 3 mm solid oak wearing layer over a multilayer base that limits movement and reduces deformation in service. The finish, tone and grade are selected per order, and volume orders are produced in batches so that boards arriving on one site share a consistent grain and colour range. That batch matching only works when we know the true quantity up front, which is why an accurate area figure matters more than it does for a standard plank floor.
What to include in your enquiry
Send us the following and we can usually come back with a structured quotation rather than a series of clarifying questions.
- Net floor area by room. Give the measured area for each space, not one lump figure for the whole building. Note where flooring stops and another finish begins.
- Laying pattern and board format. Tell us whether you want a straight stack bond, herringbone, chevron or another layout, and give the board dimensions if you have them.
- Tone, grade and surface treatment. Say whether you are after a light bleached look, a smoked or antique finish, a character grade with visible knots, or a clean uniform grain. A reference photo from our product pages is often faster than words.
- Substrate and site conditions. Confirm the subfloor type, whether underfloor heating is present, and the ambient conditions on site at the time of installation.
- Programme dates. Give the required delivery date and, if different, the date flooring needs to be laid. Production scheduling follows your programme.
- Delivery location and Incoterms. Port of discharge or the site address for door-to-door delivery, plus the terms you want quoted.
- Whether the floor sits inside a wider package. If the same project also needs cabinetry, wall panelling, doors, lighting or outdoor furniture, say so — consolidating shipments saves handling and keeps finishes coordinated.
A worked example: what one specification looks like
Here is the kind of brief that produces a clean quotation quickly. Suppose a villa renovation needs parquet through the entrance hall, living room and two bedrooms, with a herringbone layout in the hall and a straight bond elsewhere. The designer wants a light, slightly bleached tone with a matte surface, the subfloor is a screed with hydronic underfloor heating, and the goods are needed at a Melbourne port before the joinery trade arrives.
With those details we can propose the matching product from our flooring range, calculate the pattern allowance for each room separately, confirm whether the requested tone sits in our standard palette or needs a bespoke finish run, and schedule production against the delivery window. Where a project also calls for a darker secondary floor — for instance a charcoal oak in a study or powder room — we can quote both finishes on one order so they ship together.
How to read the quotation when it arrives
| Item | Product reference, board size and thickness, wear-layer thickness, pattern format. |
|---|---|
| Quantity | Square metres per room plus the cutting allowance we have applied, stated separately so you can check it against your own take-off. |
| Finish schedule | Tone, grade, surface texture and coating type, matched to the sample or reference image you approved. |
| Companion items | Adhesive, underlay, trims and thresholds where you want them included, listed as separate lines rather than folded into the floor price. |
| Commercial terms | Unit rate, total, payment terms, production lead time and the shipping basis for the delivery point you nominated. |
| Sample plan | What physical samples are sent before order confirmation and how long that takes. |
If any line is missing, ask for it. A quotation that hides the cutting allowance or bundles trims into a single number makes it very hard to compare two suppliers honestly.
Samples: the step most buyers skip
Oak is a natural material and photographs cannot carry its colour. Request physical samples before you confirm an order, look at them on the actual subfloor in both morning and evening light, and place them against the wall finish and joinery you have already selected. For hospitality work we recommend signing off samples with the operator or asset owner present, because that approval is what protects the finish when the rest of the FF&E package is reviewed.
Production, packing and delivery
Once you confirm the order, production is scheduled against your programme. Boards for a single project are produced together so grain and tone stay consistent across the whole delivery, then packed in crates sized for the handling equipment on site rather than in generic cartons. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, export paperwork and shipment tracking, with the delivery point set to whatever you agreed — a port, a builder's depot or straight to the site.
A few questions buyers ask before they send the enquiry
Can I order parquet as part of a larger fit-out package?
Yes. Flooring is one line in our one-stop solution, alongside cabinetry, wardrobes, doors, wall panelling, lighting and furniture. Coordinating them on one order keeps tones aligned and reduces the number of separate consignments landing on site.
What if my pattern generates more waste than the standard allowance?
Tell us the layout and room geometry at enquiry stage. Diagonal layouts, tight borders and rooms with many openings do consume more material, and we would rather state a realistic allowance in the quotation than underquote and leave you short mid-installation.
Can the finish be matched to an existing floor or a sample I already have?
Send the reference. Tone matching is handled through our custom and OEM service, where finishes, textures and board formats can be developed against a client sample rather than chosen from the standard palette.
Ready to price your floor?
Send us the room areas, the pattern you want, the tone you are working toward and your delivery point, and we will return a quotation broken down by room so you can check it against your own take-off. If the flooring is part of a wider villa or hospitality project, mention that in the same enquiry — contact our project team and we will handle the floor alongside the rest of the package.
Product specifications, lead times and delivery terms are confirmed on a per-order basis. Figures shown in this article describe how our quotation process works; the numbers for your project come from your drawings and site conditions.