A washdown one piece toilet looks simple on a specification sheet: a ceramic bowl, a close-coupled tank, a seat. On site it is one of the most complained-about fixtures in any hotel or apartment handover, because everything that can go wrong — a rough-in that does not match the waste outlet, a suite that no longer matches the basins, a flushing valve that gives up after months of daily use — becomes visible to guests and impossible to hide. If you are ordering custom production for a project, the model itself is only the beginning of the conversation. This guide walks through what to lock down before your units leave the factory, using our Washdown One Piece Toilet, Modern Ceramic 1003A Toilet for Bathroom as the worked example.

Start with the waste outlet, not the styling

The single most expensive mistake in sanitary ware procurement is ordering the wrong trap. The 1003A is offered with two installation types: a P-trap wall drain with a 180 mm rough-in and an S-trap floor drain with a 250 mm rough-in. Those two dimensions are not interchangeable, and on renovation work the existing outlet position is usually fixed long before anyone selects the toilet.

Before we release production drawings, ask your site team for three numbers per bathroom type: the distance from the finished wall face to the centre of the waste outlet; whether that outlet is in the wall or the floor; and the finished floor level if tiling is still to be laid. A rough-in measured on a bare slab will be wrong once the screed and tile are in, so confirm the measurement is taken to the finished surface. Where a project mixes both outlet types — common when guest bathrooms follow one plumbing riser and main bathrooms another — order the two configurations as separate line items rather than assuming one SKU covers the building.

Confirm the flushing mechanism and water consumption

The 1003A uses a washdown flushing design, which delivers strong cleaning performance while keeping water consumption efficient. That is the right family of flush for most hotel and high-density residential work, but the detail that matters on a purchase order is what sits behind the word "washdown": the flush volume, the fill and flush valve set, and whether the cistern is configured for your mains pressure.

For custom production, confirm these explicitly:

  • Single-flush or dual-flush operation, and the litre figures for each, stated on the order rather than inherited from a standard catalogue item.
  • The brand and serviceability of the fill valve and flush valve. In a busy property these wear out; specifying a valve that your maintenance team can source locally saves weeks of downtime later.
  • Minimum and maximum inlet pressure for the project's supply arrangement, particularly on upper floors and in buildings with roof tanks.
  • Whether the seat supplied is standard or soft-close, and whether hinges are front-release for cleaning.

Decide how much of the suite needs to match

A toilet specified in isolation tends to look wrong once installed. Matching basins exist in the same modern ceramic family, so decide at specification stage whether you want a coordinated set — WC, basin, and where relevant bidet — or whether the toilet only has to harmonise with basins already on site.

Where consistency across a guest-room type matters, we routinely group sanitary ware with the rest of the bathroom fit-out: bathroom sanitary fixtures, shower systems, vanities and mirror cabinets, all specified against the same room card. One specification source, one shipment plan, and one set of dimensions to check against your tiled setting-out drawings.

Ceramics, glaze and finish: what to verify on a sample

The 1003A is made of vitreous ceramic with a glossy glaze, which resists staining and yellowing and keeps daily cleaning straightforward. On a custom order, the specification should state the glaze coverage — full glazing inside the trapway as well as on visible surfaces matters for long-term odour and blockage performance — plus the colour and the tolerance you will accept between production batches.

Approve a physical sample before bulk production begins, and check it for:

  • Glaze evenness on all visible faces, with no dry edges or pinholes near the rim and base.
  • Colour consistency against your approved tile, grout and basin samples under the actual bathroom lighting.
  • Seat fit, lid closure and hinge alignment, since these are the parts that get adjusted by hand at assembly.
  • Complete fixing kit for your installation type, including floor fixings or wall-frame fixings as applicable.

Certification and documentation for your market

The 1003A product page records CE certification. Treat that as a starting point, not an answer: the marks and documents you need depend on the destination country, the building class, and in some jurisdictions on the water-labelling or plumbing-approval regime that governs what a licensed installer is permitted to fit.

Before production, tell us which documents your certifier, inspector or plumber will ask for, and we will confirm what can be supplied for the order. Requiring certificates after containers have shipped is how projects end up with stock that cannot lawfully be installed.

Customisation: what is genuinely adjustable

For project quantities, customisation on a fixture like this usually covers the practical variables rather than a redesign of the ceramic. Across our Custom & OEM Service, that typically includes trap configuration and rough-in as set out above, flush volume and valve selection, seat type and finish, colour or surface treatment where the tooling allows, carton marking and labelling to your project codes, and private labelling where you are supplying under your own brand. Confirm current options and minimum order quantities for the specific model before committing a schedule.

A pre-production checklist

Item to confirmWhy it matters on site
Trap type and rough-in per bathroom type (P-trap 180 mm wall / S-trap 250 mm floor)Wrong outlet means rework of pipework or a fixture that will not fit
Flush volume, valve set and inlet pressure rangePerformance complaints and maintenance lead times in operation
Approved physical sample with signed-off colour and glazeBatch-to-batch colour variation against tile and grout
Seat specification, spares quantity and serviceable valvesHousekeeping wear and long-term servicing without full replacement
Certificates and test documents required by the destination marketInspection sign-off and lawful installation
Packaging, carton marking and container loading planFewer breakages, faster distribution to floors and room numbers
Spare-parts buffer for handover and defects periodReplacing damaged units without reordering from the main batch

Delivery, spares and after handover

Ceramics travel badly when they are packed generically. Confirm carton dimensions against your lift and corridor clearances, ask for project-coded marking so a container can be split by floor or room type on arrival, and agree the loading plan with us before the container is stuffed — details we cover under Logistics & Door-to-Door Delivery. Order a spare quantity at the same time as the main batch: breakages during installation are not unusual, and matching a colour later is far harder than keeping a handful of units in the storeroom.

After handover, Installation & After-sales Support covers inspection and snags, warranty coverage and spare parts, so agree the warranty terms and the spares list in writing at order stage rather than at the first fault.

Send us these before we quote production: room-by-room trap and rough-in schedule; required flush volume and valve preference; destination country and the documents your inspector will ask for; seat and colour preference; quantity per configuration and your target on-site date.

Frequently asked questions

Can one order mix P-trap and S-trap units?

Yes. They are produced as separate configurations against the same ceramic body, so specify quantities per type on the order and keep them on distinct lines in your packing list.

Is a washdown toilet suitable where supply pressure is low?

It depends on the cistern and valve set rather than the bowl shape alone. Give us the measured static and dynamic pressure at the fixture, and we will confirm the valve configuration for that condition.

How do I avoid colour mismatch between the WC and the basins?

Order them from the same production run where possible, approve one physical sample set against your tile and grout, and record the approved colour reference on the purchase order so later batches are checked against it.

What quantity triggers custom production rather than standard supply?

It varies by model and by which options you want. Send us your quantities per configuration and the changes you need, and we will confirm what is feasible and what the lead time looks like.