A swim spa shell survives the voyage better than most people expect; the equipment mounted on and inside it is what usually arrives damaged. Before you place an order for Outdoor Swim Spa WS-PC02, ask your supplier to put the packaging plan in writing: how the acrylic shell is protected, where the pumps and control system travel, what crate the panels ship in, and who signs for each piece at delivery. The checklist below follows the actual equipment list for this model, so you can compare quotations on the same basis.
What WS-PC02 actually contains
Packaging decisions follow from what is being shipped. The catalogue record for WS-PC02 lists a shell of 3000 × 3000 × 1050 mm, one control system, two water pumps, one filter pump, sixty jets, one LED light and a total power figure of 7.35 kW, with water jets, LED lighting and ozone shown as features. That is one oversized, fragile monolithic body plus several loose electromechanical items, and the two groups need completely different handling.
It also means the packing list you receive should account for more than one carton or crate. If a quotation shows a single wooden case for everything, ask what is inside it and how the pumps, filter pump, control system and light are separated from the shell.
The shell: support, not just wrapping
A 3000 × 3000 × 1050 mm shell is bulky enough that it will be moved by forklift or crane at both ends of the journey. The risks are point loads under the base, flexing in the middle, and abrasion on the rim and steps. Confirm these points with your supplier:
- A rigid timber base skid or cradle that carries the full weight, so the shell is not resting on its own corners or on a single narrow pallet.
- Edge and rim protection on the top lip, the step mouldings and any cut-outs where pumps and jets mount.
- The acrylic surface covered with a soft interlayer before any strapping touches it, with straps landing on protective pads rather than directly on the shell.
- A written note of the lifting points and the recommended orientation, printed on the outside of the package rather than left to the stevedore's judgement.
Ask for photographs of the loaded and strapped shell before the container is closed. Reputable manufacturers supply them on request; if a supplier hesitates, treat that as information about how the shipment will be handled.
Loose equipment: pumps, control system and lighting
Two water pumps and a filter pump are heavy items with castings, impellers and threaded ports that crack under impact. The control system is the opposite problem — electronics that dislike moisture and vibration. Pack them separately from each other and separately from the shell.
| Item | Packaging to confirm |
|---|---|
| Water pumps (2) and filter pump (1) | Individual inner cartons with moulded or foam cushioning, ports capped to keep grit out, then a timber or heavy-cardon outer case. Confirm whether they ship loose or pre-mounted on the shell. |
| Control system (1 set) | Waterproof inner bag with desiccant, rigid box with cushioning all round, kept out of any compartment that can collect water. Label as "indoor storage / do not leave in rain". |
| LED light (1) and ozone equipment | Small-part carton with separate compartments for lenses, seals and fittings, so gaskets are not creased or crushed. |
| Jets, fittings and spares | Bagged by size in a labelled box, not dumped loose into the bottom of a crate where they will abrade the shell surface. |
Optional accessories change the picture. Catalogue-listed additions such as heat pumps, UV sterilisation, sand filtration and steps each add their own package, weight and handling notes. Confirm that every option you ordered appears on the packing list before the goods leave the factory, and confirm whether insulation boards ship flat-packed or fixed to the shell.
Container loading and the paperwork trail
SANTERSON's logistics service covers freight forwarding by sea, air and rail, customs documentation, packaging and container loading, shipment tracking and door-to-door delivery. Those services are what make a packaging specification enforceable, but only if you specify it before production closes. Useful confirmations to request in the order documents:
- Whether WS-PC02 ships alone or consolidated with other goods, and how mixed cargo is separated from the shell.
- The container size proposed and the lashing method for the cradle, so the shell cannot slide in transit.
- A packing list that names each package by contents, with net and gross weight per crate — this is what you will check against at the port.
- Commercial invoice, packing list and any certificates of origin prepared to match your import requirements; discuss them with the logistics coordinator early rather than at shipment.
- Cargo insurance for the value declared. Import terms, duties and transit times vary by destination and should be confirmed case by case for your project.
Receiving and unpacking on site
- Store the control system indoors immediately; do not leave it in the crate outside.
- Keep the shell upright on its cradle until the base slab or plinth is ready, and keep it covered while trades work nearby.
- Check the 7.35 kW total power figure against your planned supply and protection with your electrician before the equipment is wired; electrical requirements depend on the configuration you selected.
- Count jets, pumps and fittings against the packing list on the day of delivery, while returns are still possible.
Pre-order packaging checklist
Get these seven answers in writing before you pay the deposit
- Base cradle or skid specification for a 3000 × 3000 × 1050 mm shell, with lifting points marked.
- Surface and edge protection method, and where straps will land.
- Separate packaging for pumps, control system, LED light and small fittings.
- How each optional accessory ordered will be packed and labelled.
- Loading plan in the container, including lashing and separation from other cargo.
- Pre-shipment photographs of the packed unit.
- Packing list format that lets you verify contents piece by piece at delivery.
If you are ordering several units or combining a swim spa with other products from the range, packaging becomes part of a wider procurement question. The same discipline applies across the product catalogue, and SANTERSON's logistics and door-to-door delivery service handles the freight, documentation and loading side once the specification is agreed. For projects that also need cabinetry, outdoor furniture or bathroom fixtures in one shipment, the one-stop solution service coordinates production and delivery as a single package.
Send the configuration you intend to order for WS-PC02 — including options such as heat pump, sand filtration or steps — and ask for the packaging plan and packing list in the same reply. Contact details are on the contact page.