A five-metre swim spa sits between a plunge tub and a lap pool, so the specification sheet decides whether it earns its footprint. Here is the practical checklist our project team uses when a buyer asks us about Outdoor Swim Spa WS-PC05, and how to apply the same checks across the wider swim and hydrotherapy range.
Start With What Is Fixed and What Is Configurable
The catalog entry for WS-PC05 lists a shell of 5000 × 3000 × 1100 mm, one control system, one water pump, one filter pump, eighteen jets in total, two LED lights and a total power figure of 2.25 kW. The features shown on the page are water jets, LED lighting, ozone and four water columns.
That list is the starting point, not the order. Optional items in this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — and availability and compatibility vary by model. Two buyers can quote the same model name and receive different equipment sets, so put the confirmed configuration in writing before you compare prices.
Compare Against the Sibling Models in the Same Footprint
The PC05 family shares a 5000 mm length but splits into very different machines. Reading them side by side is the fastest way to work out what you are actually paying for.
| Model | Catalog dimensions (mm) | Jet total | Total power | Swim training system |
|---|---|---|---|---|
| WS-PC05 | 5000 × 3000 × 1100 | 18 pcs | 2.25 kW | Not listed |
| WS-PC05CH | 5000 × 3000 × 900 | 30 pcs | 2.45 kW | Not listed |
| WS-PC05ST | 5000 × 2400 × 1470 | 6 pcs | 6.55 kW | 1 set |
| WS-PC05ST-L | 5490 × 2400 × 1470 | 6 pcs | 6.55 kW | 1 set |
| WS-PC05ST-S | 5000 × 2400 × 1470 | 6 pcs | 6.55 kW | 1 set |
Three things stand out in that table, and each one changes the buying decision:
- Jet count is not a quality score. WS-PC05CH carries more jets than WS-PC05, while WS-PC05ST runs with six. The ST models trade jet density for a deeper shell and a swim training system. Decide first whether the space is for hydrotherapy seating or for swimming against a current.
- Depth drives usable height. A 900 mm shell and a 1470 mm shell are different rooms. Seat heights, standing clearance and entry steps all follow from depth, so measure the people who will use it, not just the plot.
- Power figures track function. The 2.25 kW and 6.55 kW totals in this family reflect different pump duties. Treat the catalog figure as the machine's rated load for your own electrical design review, and confirm the supply, protection and earthing arrangement your local licensed electrician requires before the shell arrives on site.
Check the Site Conditions Before You Fix the Model
Most swim spa disputes are settled on site, not in the catalogue. Send your supplier these five items and you will get comparable quotations back:
- Slab or plinth details with the loaded weight of a filled shell, plus drainage falls around the unit.
- Access route dimensions for delivery and crane or forklift unloading, including gates, overhead lines and turning space.
- Electrical run length from the meter or switchboard, so the quotation states cabling and protection rather than leaving them as a site variation.
- Wind exposure, screening and any pergola, gazebo or hardtop you intend to combine with the spa, since these affect anchorage and maintenance access.
- Maintenance reach for the filter pump, control system and jets, because equipment buried behind finished joinery is expensive to service.
Treat Filtration, Sanitation and Insulation as Line Items
WS-PC05 shows ozone and a filter pump on the page. UV sterilisation, sand filtration, heat pumps and insulation appear in the range as options. Each one changes both the purchase price and the running cost, so ask for them itemised instead of bundled into a single "spa package" number.
For villas and hospitality projects where the spa sits within a wider outdoor scheme, we usually pair the water feature with the rest of the terrace at quotation stage. That is where a turnkey furniture and building materials scope pays for itself: pool deck, loungers, shade structures and adjacent joinery are coordinated in one production and shipping plan rather than three.
Where a Standard Shell Ends and a Custom One Begins
Standard models suit rectangular plots and repeatable layouts. When the terrace is curved, when an irregular courtyard limits the footprint, or when a resort wants a signature water feature, the catalogue range stops being the right answer — see Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool for square, round, oval and curved layouts with an acrylic shell and structural reinforcement.
Our Custom & OEM Service covers bespoke finishes and dimensions alongside flexible minimum order quantities, which matters when a hotel group wants one detail language repeated across several villas or room types.
How the Order Travels From Factory to Footing
SANTERSON has been manufacturing furniture and building materials in China since 2008, supplying project customers in hospitality, villa and office work. A swim spa normally travels as part of a consolidated container with other project goods. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, packaging and container loading, customs paperwork such as commercial invoices, packing lists and certificates of origin, shipment tracking and delivery to the site address. Import terms, duties, insurance and transit time are confirmed project by project with your logistics coordinator, because they depend on destination, incoterms and the goods sharing the container.
On arrival, Installation & After-sales Support covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. Book the crane, slab cure date and electrician against the production schedule rather than the shipping date — that single sequencing step prevents most site delays.
The Six Questions Worth Asking Before You Sign
- Which exact equipment set does this quotation include, and which items are optional extras?
- What is the filled weight, and has the slab been designed for it?
- Which electrical load and protection does the confirmed configuration require?
- What maintenance clearance is needed around the filter pump and control system?
- Who supplies steps, insulation and any surrounding deck or cladding?
- What is on the snag list at handover, and how are spare parts supplied later?
Send us the model and the site drawing
Share the plot dimensions, intended use (hydrotherapy seating or swim training) and your target handover date. We will confirm the equipment list, power requirement and a consolidated delivery plan for the spa and the rest of the outdoor scheme.
Contact SANTERSON — Phone / WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com.
Product specifications shown in this article are taken from the corresponding product pages on santerson.com. Confirm included equipment, electrical requirements and site conditions for the selected configuration before ordering.