A compact bar cabinet looks like a small item on a villa or apartment schedule, which is exactly why it gets signed off too early. The unit has to fit an opening that already exists, carry glassware and bottles without racking, survive daily use in a household or a managed residence, and arrive in a finish that matches the cabinetry around it. Before your drawings are released into production, here is the shortlist of decisions worth closing out.

1. The opening, not the brochure dimension

Santerson Compact Bar Cabinets are made to measure for residential living projects: height, width and depth are set per project rather than picked from a fixed size ladder. Before anything is quoted, confirm the finished dimensions of the niche or wall it sits in, with floor finishes, wall finishes, skirting and any plaster build-up already accounted for. A dimension taken off a structural drawing and a dimension taken off the completed site can differ by enough to matter once scribes and trims are added.

Then confirm what the unit has to clear: door swings and drawer pulls in front of it, skirting or architraves behind it, and any socket, switch, data point or return air already fixed inside the opening. Where the bar cabinet butts into kitchen cabinetry or a wall panel run, decide now who owns the transition detail.

2. Layout and what actually goes inside

Write down what the client intends to store and serve from the unit, because that drives the internal layout far more than the front elevation does:

  • Glassware orientation — stemware racks, shelf spacing for tall highballs, or open shelving for display.
  • Bottle storage — upright, racked, or a refrigerated compartment with its own ventilation and drainage requirement.
  • Small appliances — a wine cooler, ice maker or undercounter fridge needs a defined cavity, a service gap at the back, and access to the outlet.
  • Working surface — whether there is a stone or engineered-stone top, how deep it is, and whether it overhangs the carcass.
  • Closed versus open balance — how much of the unit reads as joinery and how much is on display.

If the same project also calls for a taller or fully integrated arrangement, that decision should be made once across the whole scheme rather than room by room. Santerson Integrated Bar Systems and Santerson Glass Front Bar Cabinets are configured the same way — made-to-measure sizing, material and finish options, and project-tailored layouts — so a single set of rules can cover several bars in one villa.

3. Materials, finishes and hardware

Material and finish are selectable per project, so specify them the way you would specify kitchen cabinetry: by named sample, not by a colour family described in an email. Confirm carcass board, door substrate, surface (lacquer, veneer, laminate or glass), handle style or handleless profile, and hinge and runner brand and soft-close specification. For a bar cabinet specifically, ask how the interior surfaces are finished — a sealed interior matters where spills and glass wash water are routine.

Where lighting is part of the design, treat it as a coordinated item rather than an afterthought. Santerson Integrated Cabinet Lighting is configurable to suit each cabinet design, but electrical specification and compatibility have to be confirmed against the specific cabinet build — driver location, cable route, and who provides the connection point on site.

4. Drawings, sign-off and the production trigger

Most rework on custom joinery traces back to a shop drawing that was approved without the right people looking at it. Before release, check that the drawings show:

Item to confirmWhy it matters before production
Overall and internal dimensions, with clear opening sizesShelf spacing and appliance cavities are set from internal, not external, figures.
Finish schedule with physical samples referencedScreen proofing does not survive a container; sample sign-off does.
Glass type, thickness and edge treatment on any glazed doorDetermines hinge loading and whether the door needs tempered glass.
Aperture, ventilation and electrical points for cooling or lightingSite services must be relocated before the unit arrives, not after.
Fixing method and load path for wall-hung sectionsFull glass and bottle loads need solid backing, which affects wall build-up.
Delivery route: lift size, stair width, door clearancesA one-piece carcass that will not turn the corner becomes two units cut on site.

5. Logistics, installation and who does what

Custom cabinetry leaves the factory once, so the delivery plan is part of the specification. Confirm the packaging standard and container loading sequence for the whole fit-out, the Incoterms and import terms you are buying on, and the delivery address and access window. SANTERSON's stated services run from design and production through door-to-door logistics, installation and after-sales support, so agree in writing which stages you are engaging and which stay with your local contractor. Plumbing, electrical connection and making-good normally sit with the local trades.

Agree the inspection point too. A pre-shipment check against the signed shop drawing, with photographs of the packed unit, is far cheaper than a snag list raised after the container lands.

Confirm before you order: exact dimensions, material and finish names, hardware specification, electrical and ventilation requirements, and delivery access are all project-specific for these cabinets. The options shown on the product page are configuration choices, not fixed specifications — get them confirmed in writing against your own signed drawings.

Send us the opening dimensions, a marked-up elevation and your finish preference, and we will come back with a configuration and quotation for review before anything enters production. Enquiries are handled by our team through the contact details on this site.