A buyer in a European market does not order parquet the way a domestic distributor does. The specification has to suit a different climate, a different subfloor tradition and a different install trade, and very often it has to carry a different brand on the packing list. That is where OEM furniture manufacturing parts company with off-the-shelf trading. Here is how the process runs at SANTERSON, a China-based manufacturer producing furniture and building materials since 2008, and what a European purchaser decides at each stage.
What OEM Sourcing Means for This Product
Trading means buying what a factory already makes. OEM sourcing means the factory builds to your drawings, your finish schedule and your packaging, and your name goes on the goods. For engineered wood flooring, that difference is practical rather than cosmetic. Plank width, the geometry of the tongue-and-groove profile, the number of lamellae in the substrate, the grade of the face veneer, the type of lacquer or oil, and whether the boards ship boxed for retail or palletised for a site install — each of these is a decision you make rather than one you inherit.
The product family involved is well defined. Our European oak parquet lines carry a 3 mm solid oak wear layer over a multilayer substrate, and the same construction appears across several patterns: classic parquet blocks, herringbone, and long-format planks in light, dark brown and charcoal tones. Because the construction is shared, an OEM programme can vary the appearance and the packaging while keeping the engineering broadly constant — which is what keeps sampling cycles short and quotations comparable from one run to the next.
Stage 1: The Brief, Before Any Quotation
A serious OEM enquiry starts with a written brief, not an image. Here is what we need from you, and what should already be in your file:
- Format and pattern. Parquet block size, herringbone leg length, or plank width and length. State the module you need to match, because an existing floor on site dictates the geometry more reliably than any catalogue does.
- Face specification. Grade of oak (select, natural, rustic — knots and mineral marks included or excluded), sawn or brushed surface, wire-brushed or smooth, and the smoke, fumed or stained treatment if the design calls for it. Our light European oak engineered wood flooring, for example, keeps natural knots and reads as a soft rustic surface; that is a face decision, not an accident.
- Finish. Matt or satin lacquer, hardwax oil, UV-cured or site-oiled. Low-sheen oiled surfaces are a common expectation in northern and central European specifications, and the finishing line has to be set up for them accordingly.
- Substrate and installation method. Floating with a click profile, or glued-down with square-edge boards. Underfloor heating compatibility is stated on specific product pages, so treat it as an item-level statement: for an OEM order it must be written into the specification and confirmed against the exact construction being produced, never assumed from a similar article.
- Volume and split. Square metres per pattern, how many container loads, and whether one order mixes several finishes. Minimum order quantities are set per production run, and mixing colours in one run is exactly the kind of thing OEM flexibility allows.
Stage 2: Prototyping and Approval
With the brief fixed, we produce samples before committing to production. Our custom and OEM service covers design and prototyping, bespoke finishes and textures, material selection across wood, metals and laminates, and branding such as engraving, logos and packaging. For flooring, the sample round normally covers three things at once:
- A physical board in the requested face grade and finish, so colour and sheen can be judged under your own lighting rather than a screen.
- A profile check — boards from two production batches fitted together, to confirm the machining holds flatness and that no lipping appears across the joint.
- Your carton, label and pallet configuration, with your brand mark and article numbers, plus the batch and lot marking your market requires on the packaging.
Approval at this stage should be signed against a retained reference sample. Colour in oak is a range, not a point: sapwood content, grain figure and the response of the wood to fuming all vary within a batch. Agreeing an acceptable band — and keeping the approved board as the physical boundary of that band — prevents the argument later that no one can win.
Stage 3: Production and the Checks That Matter
Once the sample is signed off, production runs against it. The quality points a European buyer should have inspected on their behalf, in writing:
| Check | Why it matters in the European market |
|---|---|
| Face veneer thickness and sanding tolerance | A 3 mm wear layer is what allows refinishing later. Under-machining at the edges shortens the floor's service life. |
| Moisture content at packing | Kilned stock must be balanced to the destination climate, not the factory's. Moisture imbalance is a leading cause of board cupping after import. |
| Machining and joint integrity | Tongue-and-groove or click profiles are checked across pallets, not one board per pallet. |
| Finish adhesion and sheen reading | Lacquer build and gloss level measured against the approved sample. |
| Grade sorting against the agreed face standard | Knot size, sapwood and colour band verified per carton, with a defined reject allowance. |
| Packaging, marking and pallet loading | Your labels, article numbers and stacking pattern; also the basis of the packing list used at customs. |
Our manufacturing and quality-control step sits inside a wider one-stop furniture and building materials supplier workflow, which is useful when flooring is only one line in a larger order. A villa or hotel specification that takes flooring together with joinery, doors, wall panelling and lighting can be produced under one project file, so the oak on the floor and the oak on the fitted cabinetry are specified against the same finish schedule.
Stage 4: Freight, Documents and Handover
Timber goods crossing into the European union carry more paperwork than the pallet suggests. Our logistics service covers freight forwarding by sea, air and rail, customs documentation, packaging and container loading, shipment tracking and door-to-door delivery, including commercial invoices, packing lists and certificates of origin. For an oak flooring order you should expect to confirm, case by case:
- The species declaration and the legality documentation your import requires, matched to the invoice description.
- Incoterms and who carries insurance — an ex-works quotation and a delivered-to-depot quotation are not comparable prices.
- Duty classification and the declared value basis, agreed before the order rather than at the border.
- Container loading plan: flooring is dense and stacks predictably, so an under-loaded container quietly erodes the margin on every shipment.
On arrival, our installation and after-sales support covers on-site fitting, inspection with a snag list, warranty handling and spare parts. For a flooring order this is also where a batch issue becomes visible: boards laid in sequence across a room show colour variation far more honestly than the same boards inspected inside a carton.
What to Put in Your RFQ
If you are comparing suppliers, an RFQ that answers these questions up front is the fastest route to a firm quotation:
- Total square metres per article, and the split across patterns and tones.
- Face grade standard with a reference sample or photographs, plus the acceptable reject allowance.
- Wear-layer thickness, total board thickness and substrate construction.
- Finish system by name, with sheen level.
- Profile type and installation method, and whether underfloor heating is in scope for your project.
- Pack size per carton, cartons per pallet, pallet specification, and branding requirements.
- Destination, required delivery window, and the Incoterm you want quoted.
Two things are worth asking every supplier for: a physical approved sample retained on both sides, and a written specification tied to your order number. Everything else in an OEM flooring programme can be negotiated; those two should not be.
Send us your parquet specification
Tell us the pattern, tone, wear layer and volume, and we will quote production with samples, packaging under your brand, and delivery arranged to site.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Explore the range: European oak parquet engineered wood flooring · dark European oak herringbone engineered flooring