A set of glass sliding doors looks simple on a drawing. Two panels, a track, a clean opening. In practice it is one of the least forgiving items in an international project order: made to measure, heavy, fragile in transit, and impossible to correct once the panels are cut. If the delivery plan is weak, the doors arrive late, damaged, or fitted to an opening that was never prepared for them.

This guide walks through how we plan international delivery for a project order of glass sliding doors, from the factory in China to your site, stage by stage, and what your team needs to confirm at each stage so the doors go in on the first attempt.

Why glass sliding doors are harder to ship than most items in the order

Sliding doors arrive as large flat assemblies or as panel-plus-hardware sets, and each of those characteristics creates a specific risk in transit:

  • Made to measure. Our doors are produced to the dimensions of your actual openings, so a measurement error is not fixed with a spare part on site — it means remaking a panel.
  • Glass and long spans. Tall panels take edge impact badly, and long horizontal members bend if they are supported at the wrong points inside the crate.
  • Hardware decides the fit. Tracks, rollers, guides and thresholds have to match the panel weight and the floor finish level. Mixed or substituted parts show up as doors that drag or sit out of plumb.
  • Two delivery streams. Panels are usually crated separately from hardware and framing components, so both parcels must clear customs and reach the same site in the same window.

The planning below is built around removing those four risks before the container leaves port.

Stage 1 — Lock the specification before anything is produced

Most delivery problems on doors start as a specification problem. Before production starts, we ask project buyers and site contractors to settle these items together:

  • Opening dimensions and finish levels. Slab-to-slab height, opening width, and the finished floor level on both sides of the opening. A sliding door that meets a different floor material — timber on one side, stone on the other — needs the threshold detail agreed early.
  • Panel layout and stacking. How many panels, which direction they stack, and where the pocket or bypass space goes. This determines whether the wall cavity has to be built to receive them.
  • Glass type, colour and finish. Clear, frosted, smoked or ribbed glass changes weight, appearance and handling requirements. Frame finish is chosen from the project palette, not from a catalogue shade.
  • Hardware set. Track length, roller rating, guides, handles and locks are specified as a matched set for the panel size and weight.

Our door range is configured per project — made-to-measure sizing, material and finish options, and a layout tailored to the space. For openings that pocket into the wall we also offer glass pocket doors, and where a room needs to be divided only occasionally, partition sliding systems cover the same look with a different track arrangement. Choosing the right system at this stage is cheaper than converting it later.

Confirm dimensions and selected specifications for each project in writing before production release. Dimensions taken on site after the screed and finishes are in place are far more reliable than dimensions taken from drawings.

Stage 2 — Coordinate the site works that must be finished first

Sliding doors fail on site less often because of the door and more often because the building was not ready for it. The items below should be fixed on the programme, with dates, before the order is released:

  • Floor finish levels. Track height has to agree with the finished floor build-up. If the tile thickness changes during value engineering, tell us before the track is manufactured.
  • Wall structure for pocket and flush details. Pocket openings need a cavity built to receive the panel; flush sliding doors need the surrounding wall line set out so the panel closes level with the adjacent surface.
  • Structural support above wide openings. Lintels and framing must carry the head track and the weight of daily use.
  • Sequence on site. Glass panels should go in after wet trades, painting and flooring are complete, so the opening is clean and dry when the panels arrive.

Stage 3 — Production and pre-shipment checks

Once the drawings are signed off, production runs against those confirmed dimensions. Our project workflow moves from design consultation and space planning through material selection and product specification, then manufacturing with quality control and project management. For a door order, the practical checkpoints are:

  • Panel sizes re-checked against the signed dimension sheet.
  • Hardware packed as a labelled set matched to each opening reference.
  • Finish samples approved before the full batch is produced, so colour and glass tone match what the specifier saw.
  • Packing list written by opening number, not just by item, so the site team knows which crate belongs to which room.

Stage 4 — Packing and container loading

Glass sliding doors travel in crates designed for flat, vertical or near-vertical loads, with edge protection on the glass and separate boxing for tracks, rollers and frames. Loading is planned against the crate dimensions so nothing heavy sits against a panel face, and the crates are secured so they cannot shift during ocean handling.

Two points to settle with your freight plan:

  • Consolidation or separate shipment. If the doors ship in the same container as joinery, wardrobes or flooring, the loading sequence decides what comes off first at destination. Doors should not be buried behind heavier cabinetry.
  • Cargo insurance. Glass is insurable and should be covered explicitly; we can advise on options for the shipment.

Stage 5 — International freight, documents and customs clearance

We arrange forwarding by sea, air or rail depending on order size and programme, and prepare the paperwork the importer needs to clear the goods: commercial invoice, packing list and certificates of origin. Shipment tracking keeps the site team informed of the vessel schedule so storage and labour can be booked against a real arrival date rather than an estimate.

For buyers in Australia and other markets, import terms, duties, insurance and delivery scope are confirmed case by case with our logistics coordinators, because they depend on the destination port, the order composition and who is registered as importer of record. The one rule that holds everywhere: customs documents must match the packing list exactly, item for item, or clearance stalls.

Stage 6 — Delivery to site and inspection before installation

Door-to-door delivery brings the crates to the project address. On arrival, do a short inspection before anything is signed off:

  • Check crate condition externally — punctures and impact marks on the glass-face side are worth photographing.
  • Open one or two crates and verify panel labels against the packing list by opening number.
  • Confirm every hardware set is present and matches its labelled opening.
  • Report any damage immediately with photographs, so replacement panels can be produced while the rest of the order is still on site.

Stage 7 — Installation, snagging and handover

Installation follows the confirmed layout: head and floor tracks set to level and alignment, panels hung and adjusted for smooth travel, guides and locks fitted, then a snag pass on every opening. We support this stage with site guidance and after-sales service, including spare parts and replacement of damaged components.

A practical tip for project buyers: keep one spare roller set and one spare guide per door type in the site store. Hardware that wears out two years later is a small part to replace when you already have it, and a long delay when it has to be manufactured and shipped.

A simple timeline to work back from

StageWho actsWhat must be true before it starts
Specification and dimensionsBuyer, designer, site contractorOpenings defined; floor build-up decided; glass and finish selected
Site preparation worksSite contractorCavity, lintel and threshold detail built to the confirmed drawings
Production and QCSANTERSONSigned dimension sheet and approved finish samples
Packing and loadingSANTERSONCrate plan agreed; insurance arranged
Freight and clearanceSANTERSON logistics team, importerDocuments match packing list; importer of record confirmed
Site delivery and inspectionSite teamWet trades and flooring complete; storage area ready
Installation and handoverInstaller, with our site guidanceOpening references labelled; hardware sets on site

How we support a door order end to end

SANTERSON has been manufacturing furniture and building materials in China since 2008, and we supply project orders that combine doors with the joinery, wall panelling, wardrobes and finishes around them. Handling those in one order means one dimension standard, one packing list and one delivery window instead of five suppliers arguing about who was late.

Our service covers design consultation and space planning, custom and OEM production, material selection, project management with site coordination, logistics and door-to-door delivery, and installation support with after-sales service. If your project also needs the doors matched to fitted storage, glass sliding door wardrobes can be produced to the same glass and finish specification, so the whole interior reads as one detail.

Send us your door schedule

Share the opening dimensions, panel layout and finish you are specifying, together with the destination port and target site date. We will come back with a configuration, packing plan and freight option for that order — and flag anything on the drawings that would cause trouble at installation.