A clear glass aluminum frame wardrobe looks simple on a drawing: a metal frame, a transparent panel, a set of internal shelves. On site it is one of the dimension-sensitive items in a bedroom fit-out, because glass cannot be trimmed, drilled or re-cut once fabricated. The questions below are the ones buyers, contractors and interior designers should settle with the factory before an order for Clear Glass Aluminum Frame Wardrobes is confirmed.
1. Size and site conditions, agreed before the glass is ordered
This collection is supplied made to measure: each unit is built to the dimensions of the room rather than to a fixed catalogue size. That means the survey, not the brochure, drives the outcome.
- Send finished-floor and finished-wall levels, not structural slab heights. Floor-to-ceiling height changes once tiling, screed, skirting or ceiling cornices are installed.
- Give the depth at three points along the wall — existing walls are rarely straight, and a frame that fits at one end will not close at the other.
- Mark out every obstruction: switch plates, sockets, air-conditioning outlets, downlights, doors that swing into the recess, and skirting boards that reduce usable depth.
- State how the unit meets the ceiling. A full-height built-in usually needs a scribe or filler panel; say whether you want the gap closed or left as a shadow line.
2. Glass specification, thickness and edge treatment
"Clear glass" describes transparency, not glass construction or safety grade. Agree with the factory which glass build applies to doors, side panels and any fixed display section, and confirm the thickness that the frame profile is designed to carry.
| Point to specify | What to ask the supplier |
|---|---|
| Glass build-up | Which glass construction is used for doors and panels on this collection, and what is offered as an upgrade. |
| Thickness | The panel thickness each aluminium profile accepts, and whether the same profile carries every size in the run. |
| Edges and finish | Polished or seamed edges, arris treatment, and whether cut-outs for handles or hardware are permitted on that glass. |
| Print and film | Whether sandblast bands, logos or decorative film can be added while keeping the clear look you specified. |
If a project needs transparency in some bays and concealment in others, do not mix two unrelated product families. Stay inside one system: Frosted Glass Aluminum Frame Wardrobes and Smoked Glass Aluminum Frame Wardrobes belong to the same glass-and-aluminium frame collection, so a bedroom can combine clear bays for display with frosted or smoked bays for everyday storage using one profile and one hardware set.
3. Frame colour and surface finish
The aluminium profile is the design element people actually see, so treat its finish as part of the interior scheme rather than as a default. Confirm with the factory which application is used for the colour you select — powder coating or another finish — and request a physical sample of the extrusion in that finish before sign-off. A printed swatch and a coated offcut behave very differently under warm bedroom lighting.
- Name the colour to a standard, for example a RAL reference, instead of a trade name, and record it on the drawing.
- Decide whether interior faces of the frame carry the same finish as the exterior; this matters in walk-in layouts where the frame is seen from inside.
- Check the profile against adjacent metals — door ironmongery, lighting, bathroom fittings — so the tones do not clash under the same lamp.
4. Layout, door type and internal fit-out
The internal plan decides day-to-day satisfaction, and on a made-to-measure unit it is entirely open. Send the factory a room layout with your hanging preference already marked: long hang for dresses and coats, double hang for shirts and folded storage, drawers at waist height, shelving above eye level.
- Door type and opening method — hinged, sliding or open — chosen against the circulation space actually available in front of the unit.
- Bay widths: how many doors across the run, and where vertical stiles should fall so they do not sit in front of a drawer or a mirror.
- Corner and awkward bays: rotating racks, pull-down rails or shallower carcasses where depth is limited.
- Internal board material, edge banding, and hardware brand and soft-close specification if required.
- Integrated lighting: state whether the wardrobe is to receive a door-triggered or motion-activated strip, and where the wiring must be concealed.
5. Hardware and adjustment range
Ask what adjustment the system allows after delivery. Sliding-door tracks and hinged glass doors normally carry some allowance for level and alignment. Knowing that range tells your site team how much wall flatness they must correct before installation, and it prevents an avoidable dispute later.
6. Documentation that locks the specification
Before production starts, request a shop drawing showing overall dimensions in the finished condition, door elevations, a glass schedule by bay, the frame finish code and the internal fit-out layout. Check every dimension on that drawing against your own survey. Santerson's interior design and project coordination service covers drawings, production coordination and on-site guidance, so this approval stage can run through the same team that manages manufacture.
7. Delivery, handling and installation
Glass and aluminium arrive with different risks, so raise both at the order stage. Agree the packaging standard for glazed panels, the crate or container layout, and who inspects for damage on arrival. Santerson arranges freight by sea, air and rail with customs paperwork and door-to-door delivery, and provides installation and after-sales support; buyers should still confirm delivery scope, site receiving arrangements and the snag process for their own project.
8. Cost structure and change control
A made-to-measure wardrobe is priced from the specification you confirm, so ask for a quotation broken down by carcass and doors, glass type, frame finish, internal fit-out, hardware, packaging and freight. That breakdown shows what a change costs: switching one bay from clear to smoked glass is a small revision, while altering a bay width after the shop drawing is approved means re-cutting glass.
Ordering as part of a wider fit-out
Wardrobes rarely sit alone. Ordered together with other Built-in Furniture, wall panelling, doors and flooring from one supplier, the frame finish can be matched across rooms, surveys combine into one visit, and freight consolidates into a single shipment. That coordination is where Turnkey Solutions for villa and hospitality projects earn their place: one team holds the drawing set, the material schedule and the delivery sequence.