A full height media wall is not a single product you pick from a catalogue; it is a built-in system that combines the TV zone, storage, panelling, doors and lighting into one made-to-measure wall. Because every dimension, finish and service point is decided per project, the quality of your quotation depends almost entirely on the quality of the information you hand over at the start. This guide lists exactly what a supplier such as Santerson needs in order to price a Santerson Full Height Media Walls scheme accurately, and what happens if that information is missing.
1. Room And Wall Data: The Foundation Of Every Quote
Full height units are built to your actual opening, so the supplier needs measured drawings or on-site measurements before any meaningful price can be produced.
- Clear wall width and floor-to-ceiling height at several points, since walls are rarely perfectly straight or level over a 3-6 m run.
- Skirting, architrave and cornice details, plus whether these need to be removed, scribed around or continued across the new unit.
- Position and depth of structural columns, beams, box soffits and any bulkhead that the cabinetry must bridge or avoid.
- Floor build-up: finished floor level, and whether the media wall sits on a completed floor or a screed still to be poured.
- Adjacent walls and corners — returns, recesses, fireplaces or door openings that interrupt the run.
- Access route for delivery: stair width, lift dimensions, corridor turns and ceiling height at the entry point, which affect how large each panel can be manufactured.
Where drawings are not yet available, Santerson arranges site measurement as part of the one-stop workflow, so a rough floor plan plus photographs is usually enough to begin pricing.
2. Television And Viewing Layout
The screen itself drives several structural decisions, so specify it early rather than leaving it to the end of the project.
| Item to provide | Why the supplier needs it |
|---|---|
| Screen size and model (or at least size range) | Determines the width of the TV recess, the load-bearing backing frame and whether a lift or articulating arm is required. |
| Fixed wall mount, articulating arm or ceiling lift | Affects recess depth, panel cut-out and the reinforcement behind the panels. |
| Desired screen centre height and seating distance | Sets the vertical layout of open niches, drawers and closed cabinets around the screen. |
| Screen visible or concealed | A visible screen uses an Integrated TV Panel; a concealed screen needs Sliding Panel TV Systems or a rotating mechanism, which is priced differently. |
| Room finish and glare conditions | Guides the panel sheen — matte lacquer versus glass or glossy surfaces — so reflections do not disturb viewing. |
3. Devices, Cables And The Electrical Plan
This is the most commonly incomplete part of an enquiry, and it is also the part that causes the most rework on site.
- Device inventory: soundbar, media streamer, games consoles, set-top box, AV receiver, speakers, turntable — with dimensions where devices must fit inside a closed cabinet.
- Ventilation needs: components that run warm need ventilated compartments, louvred panels or open niches; sealed cabinets can overheat equipment.
- Infrared and remote control: if devices sit behind doors, say whether you want IR-transparent fabric, glass, or a remote-control relay.
- Socket and data positions: height and location of mains outlets, HDMI runs, network points and speaker cable drops on the wall behind the unit.
- Switching: whether one switch should power the screen and all devices together, and where that switch should sit.
- Speaker plan: in-wall or in-cabinet speakers must be positioned before panels are manufactured, because cut-outs cannot be added afterwards on site without damage.
A simple annotated photo of the existing wall with socket positions marked is often more useful than a formal electrical drawing, and it prevents the classic problem of a new media wall covering an outlet that still has to be used.
4. Storage Programme: What The Wall Has To Hold
Tell the supplier how you actually use the room, not just how much storage you think you need. The open-to-closed ratio changes both layout and price.
- Closed storage for daily clutter — board games, blankets, remotes, documents — usually means drawers and hinged cabinets.
- Open display for books, ceramics and objects; deep or shallow shelves depend on what you intend to show. Open Display Niches work well when paired with accent lighting.
- Mixed arrangements combine both, as in Storage & Display Combo layouts, and are the most common choice for family living rooms.
- Special items to declare: record players, wine bottles, a projector, children's toys, or a pet station — each may need its own compartment type.
- Load requirements: heavy stone ornaments or a full book collection require deeper carcasses and shelf reinforcement.
If the media wall is one element of a wider joinery package, mention it. Combining the living room wall with Full Height Storage Walls elsewhere in the property keeps material, finish and manufacturing batch consistent, which is usually more economical than ordering separately.
5. Doors And How They Should Read
Doors decide whether the finished wall reads as cabinetry or as architecture, and this choice has to be made before panel sizing.
- Handleless Concealed Doors keep the surface uninterrupted and are opened by push mechanism or finger recess.
- Sliding Panel tracks need a pocket or an overlap zone; wall width determines whether panels can stack or must travel the full run.
- Door swing clearance: hinged doors in front of a coffee table or a walkway can be awkward, so state the traffic pattern in the room.
- Matching doors elsewhere: Flush Interior Doors and concealed doors can be produced in the same panel material, so a media wall and the property's internal doors can match exactly.
6. Materials, Finish And The Surrounding Walls
Send photographs or samples of what the media wall has to sit alongside: floor, paint colour, stone fireplace, existing furniture.
- Panel family from the Paneling Systems range — Wood Veneer Panels for warmth, Matte Lacquer Panels for a smooth modern surface, Textured Panels, Stone & Marble Panels or Glass & Glossy Panels for a reflective feature.
- Veneer cut and grain direction: book-matched, quarter-cut or sequential grain must be specified before panels are cut, and it affects the number of sheets required.
- Colour references: RAL code, paint sample, or a physical swatch posted to the factory. Photographs alone are not reliable enough to match a colour.
- Durability drivers: household children, a hotel lobby, a beach house with salt air, or direct sunlight on the panel face — all influence finish selection.
7. Lighting Specification
Integrated lighting is designed into panels and shelves during manufacture, so it cannot be an afterthought.
- Niche and shelf lighting: linear LED in recessed channels, with the transformer position agreed in advance.
- Colour temperature and dimming behaviour: warm ambient glow versus bright task light, and whether lighting is on a separate dimmer circuit.
- Sensors and switching: door-activated, motion-sensor or manual — each needs different wiring routes behind the panels.
- Showpiece elements such as an arched niche with concealed LED are possible in made-to-measure work; send a reference image so the curve can be engineered and priced.
Details of available Integrated Cabinet Lighting options can be confirmed with your project consultant once the layout is fixed.
8. Project Context, Logistics And Programme
Commercial and delivery information belongs in the enquiry as well.
- Project type and location: private villa, apartment, hotel or hospitality fit-out; and the country of delivery.
- Delivery terms: door-to-door service including logistics and customs, or supply to a nominated freight forwarder or builder.
- Installation responsibility: Santerson's on-site installation team, your own contractor, or supply only for a local joiner to fit.
- Programme: site completion date, when the media wall must be installed relative to painting and flooring, and any handover deadline.
- Budget range: an honest band lets the supplier propose a realistic specification instead of quoting something that has to be value-engineered later.
- Decision maker and drawing source: architect, designer, builder or owner — this determines how detailed the technical information already is.
9. A Ready-To-Send Enquiry Checklist
- Floor plan plus measured elevation of the media wall, with ceiling height and socket positions marked
- Photographs of the room from both ends, including floor, ceiling and adjacent walls
- Screen size, mount type and whether the TV should be visible or concealed
- Device list with dimensions and any ventilation or IR requirement
- Storage programme: what goes in closed cabinets, what stays on display
- Preferred panel family and colour reference (RAL, sample, or swatch to be posted)
- Door type and opening direction, plus any matching doors elsewhere in the property
- Lighting intent: niches, shelves, dimming, switching
- Delivery address, delivery terms, installation responsibility and required site date
- Budget range and the person who signs off drawings
With those items in one email, a supplier can move straight to a layout proposal and an itemised quotation. As a one-stop furniture and building materials supplier, Santerson then takes the project through consultation, design and planning, production, logistics, installation and after-sales — site measurement, 3D rendering, manufacturing and on-site fitting included, so you approve a rendered design before anything is cut.
Frequently Asked Questions
Can a quotation be given from a photograph alone?
A rough estimate is possible from a photo plus approximate width and height, but an accurate price needs measured dimensions, because panel sizes, backing frames and cable routes are all derived from them.
What if the room is still under construction?
Send the architectural drawings and mark the intended media wall position. Santerson can coordinate on final site measurement once floor levels and wall finishes are fixed, which avoids ordering to unfinished dimensions.
Do full height media walls have to match existing furniture?
Not necessarily, but matching veneer or lacquer across the media wall, doors and other joinery produces a calmer, more architectural result. Share samples of anything that must match, and finish selection is resolved at the design stage.
Can the media wall be designed together with other rooms?
Yes. Combining living, bedroom and study joinery into one project keeps finishes consistent across the property and simplifies production, delivery and installation scheduling.