Why a media wall is a building element, not a piece of furniture
A Santerson Full Height Media Walls scheme runs from the floor slab to the ceiling line, carries a screen and its wiring, and usually sits next to doors, panelling and joinery made by other trades. That is why it needs the same planning discipline as cabinetry or wall cladding. Delivered late, it blocks painting, flooring and skirting. Delivered early, it sits in a corridor for six weeks. Ordered without the electrical information, the panel arrives with the wrong cut-outs and the on-site team starts cutting your new unit.
The product page presents these systems as configurable: finish, layout and dimensions are specified per space, and dimensions and storage configuration are confirmed for each project. Everything below assumes that same working rule — the technical content is fixed in drawings before production starts, so anything you can decide early saves a site variation later.
Step 1: Lock the wall build-up and the site dimensions
Full-height work leaves no room for guesswork. Before any drawing is signed off, record:
- Floor-to-ceiling height at several points around the wall — slab-to-slab heights vary, and a full-height unit has nowhere to hide a 20 mm difference.
- Finished floor level and finished ceiling level, including any screed, floating floor or ceiling lining that will be added after survey.
- Wall plumbness and the position of studs, beams or services you cannot move.
- The exact screen: model, screen size, mounting pattern, depth, and how far it sits off the finished wall face.
- Where power, HDMI, network and antenna runs terminate, and whether a contractor needs to relocate them.
For villas and apartments we carry out an on-site survey as part of the custom service, so measurements are taken against the actual opening rather than a drawing scale. Where your team prefers to measure, send us the same six items above and we will mark up the discrepancies before production.
Step 2: Fix the media-wall scope and its neighbours
The most common delay on a wall-system package is not manufacturing — it is an unresolved boundary between trades. Decide in writing who supplies and installs each adjacent element:
| Element | Decide before ordering |
|---|---|
| Media wall carcass, panels, doors | Panelling material and finish, wood colour, door layout, open versus closed proportion |
| Screen bracket and recess | Who provides the bracket, recess depth, ventilation clearance, access panel |
| Integrated lighting | Driver location, switching, dimming protocol, low-voltage wiring route |
| Adjacent doors and panelling | Whether flush or concealed doors are in the same package so reveals align |
| Floor and ceiling junctions | Who trims off: flooring contractor, ceiling contractor, or the fitter |
| Skirting and architrave | Where they stop against the unit, and matching profiles where needed |
When the media wall is ordered together with related items from the same range — Santerson Integrated TV Panels, Santerson Sliding Panel TV Systems, or Santerson Full Height Storage Walls — those junctions are resolved in one drawing set and one production run, which removes most of the interface arguments on site.
Step 3: Sequence production with the rest of the fit-out
Our project workflow runs through consultation, design and planning, production, logistics, installation and after-sales. The date that matters for you is the handover of approved drawings, because production starts from them and site conditions cannot be corrected afterwards.
Work backwards from your practical-completion target:
- Drawings and specification sign-off — dimensions, finish samples, storage layout, electrical points all confirmed on paper.
- Production and quality control — panels, carcasses and doors made to the approved set; finish batches kept together so colour matches across the wall.
- Packaging and container loading — panel-by-panel packing with marked crates, so the on-site team can find each piece without opening everything.
- Freight and customs — sea, air or rail freight forwarding with commercial invoices, packing lists and certificates of origin prepared for you; shipment tracking through to delivery.
- Delivery window — scheduled after plastering, painting, flooring and ceiling work are complete enough for a fixed unit to go in, but early enough that final snagging can still close out.
Rule of thumb: the media wall should arrive after the wet trades and hard finishes are done, and before loose furniture, rugs and soft furnishings. If your programme cannot guarantee that gap, tell us at the quotation stage so we can split the delivery or hold part of the package.
Step 4: Prepare the site for a fixed installation
A day of site preparation saves a day of fitting. Before the fitters arrive, confirm:
- The room is locked, dry and dust-controlled, with heating or cooling running so board moisture has stabilised.
- All electrical points are energised, tested and labelled at the positions on the approved drawing — including lighting drivers and any screen power.
- Access route from the loading point to the room is clear: lift dimensions, corridor widths, turning radius for long panels, and floor protection along the path.
- Ceiling and floor junctions are exposed where the unit trims off, so the fitter can scribe rather than shim.
- A named site contact is present who can sign off deviations on the day instead of waiting for an email reply across time zones.
Step 5: Installation, inspection and handover
Our service covers on-site installation followed by inspection and snag items, with warranty coverage, spare parts and ongoing maintenance behind it. For a full-height media wall the practical sequence is:
- Set the base or floor-mounted carcass to line and level against the actual floor, not the drawing dimension.
- Fix upper sections and panels, checking reveal consistency as you rise; ceiling heights drift over a long wall.
- Cut and fit screen recess, cable pass-throughs and access panel per the approved detail.
- Install integrated lighting — Santerson Integrated Lighting Systems or niche lighting — then test every circuit before closing panels.
- Fit doors, hinges and hardware; adjust for an even gap along the full height.
- Walk the wall with your site contact, record snags, and photograph the completed run for the handover file.
Handover should leave you with three things: as-built dimensions for any later works, the finish and hardware references used, and the contact route for spare parts such as hinges, door fronts or a replacement panel. Because these systems are made to measure, ordering a matching panel years later is far easier when the reference is on file.
A worked example: whole-house joinery in one package
Our mid-century whole house custom cabinetry and built-in storage project shows how a single coordinated package behaves on site. The same warm wood-grain language runs through a bay-window desk with storage drawers, open staircase bookshelves, vertical slat partitions and kitchen cabinets with deep metal drawers. Every cabinet dimension was measured precisely on-site to suit the appliances and layout, and one team handled survey, 3D design, production, delivery and installation.
The lesson for media-wall buyers: when the wall system, storage walls, wardrobes and doors share one drawing set and one delivery, the reveals, wood colours and junction details line up because a single team is accountable for them. Splitting those items across suppliers is where the coordination cost appears.
Common problems, and what prevents them
| Problem on site | Preventive step taken earlier |
|---|---|
| Unit is 15 mm short of ceiling height | Multi-point floor-to-ceiling survey at finished levels, confirmed after screed and ceiling lining |
| Screen sits too proud of the panel face | Screen model and bracket depth fixed before drawings; recess detail approved in writing |
| Cables visible at the base of the wall | Conduit routes and floor boxes set out on the approved drawing, coordinated with the flooring trade |
| Lighting drivers inaccessible after closing up | Driver location and access panel shown on drawings and agreed with the electrical contractor |
| Finish does not match adjacent joinery | Finish samples approved against the actual board batch before production release |
| Crates delivered into an unfinished unit | Delivery window agreed against the site programme, with storage location confirmed |
| Missing hinge or panel after handover | Finish and hardware references recorded at handover for later spare-parts orders |
What we need from you to plan delivery and installation
Send these six items with your enquiry and we can return a production schedule, a delivery sequence and an installation plan rather than a generic lead time:
- Room drawings or the measured dimensions of the wall, including floor-to-ceiling heights at several points.
- The screen specification, or the space you intend to place it in.
- Your preferred layout: open display niches, closed cabinets, sliding panels, or a mix.
- Finishes you are working to, plus any adjacent doors or panelling that must align.
- Your site programme: when wet trades, flooring and ceiling work finish.
- Delivery address, access constraints, and whether installation support is required on site.
As a one-stop furniture and building materials supplier that has been operating since 2008, we handle the survey, drawings, production, freight and customs paperwork, door-to-door delivery and installation support as one package, so the media wall arrives at the right moment and fits the opening it was measured for. Start with the dimensions and the screen; the rest of the schedule follows from those two decisions.