A pocket door looks simple on a drawing until it has to be ordered, shipped and installed. The leaf, the frame, the sliding hardware and the wall cavity all have to agree with each other, and when they do not, the correction happens on site at the worst possible moment. If you are sourcing made-to-measure interior doors for a villa or hotel fit-out, this guide sets out what to check before you place a purchase order with a Santerson Wood Veneer Pocket Doors supplier, and how to keep the detail phase from turning into site variation.

What a wood veneer pocket door actually includes

A pocket door is a sliding door that disappears into a cavity in the wall when opened. On paper you are buying one item; in practice you are coordinating four: the door leaf and its finish, the lining or frame around the opening, the hanging hardware and track, and the wall build that carries the pocket.

The Santerson Wood Veneer Pocket Doors listing describes a made-to-measure product for residential projects, where finish, layout and dimensions are specified per space, with material and finish options to choose from. That is a configurable product, not a stocked catalogue line, which means the value of the supplier relationship sits almost entirely in how well the specification is captured and confirmed before production starts.

The same configurability runs through the rest of the Windows and Doors range. Pocket doors, sliding doors, hinged doors and concealed doors are all listed with made-to-measure sizing and selectable finishes, so a buyer who has settled on a timber look can carry one finish decision across several door types in the same project.

Check 1: dimension capture is done against the opening, not the schedule

A door schedule written at concept stage is an approximation. For a pocket door it is not close enough, because the finished opening, the pocket depth and the wall build all interact.

Before you request a quotation, confirm for each opening: the finished opening width and height, the clear wall thickness, whether the pocket is single or double, the floor finish level on both sides, and who is building the cavity. Then ask the supplier to return a shop drawing sized to those numbers.

Ask the supplier to state explicitly which dimensions they are producing to, and whether the quoted price covers the frame and hardware as well as the leaf. A low quotation that excludes the frame and track is not a low quotation; it is an incomplete one.

Check 2: how the veneer finish is specified and approved

Wood veneer is a thin layer of real timber over a board core. Two batches of the same species can differ in grain figure, colour and openness of pore, which is why a colour name alone is not a specification.

  • Ask what substrate the leaf is built on and how the edges are finished, since pocket door edges are visible at the reveal.
  • Ask whether the grain runs vertically or horizontally on each leaf, and whether matching grain across paired openings is included.
  • Request a physical finish sample before production, and keep the signed sample as your acceptance reference.
  • Order all leaves for one phase from the same production run so colour and figure stay consistent across the floor.

If you also have wall panelling in the same timber, ask whether the door leaf and the Wood Veneer Panels can be produced to one approved finish. Paneling Systems are listed with made-to-measure sizing, material and finish options, so aligning the two is a specification question rather than a new supplier.

Check 3: hardware, track and wall build are on one drawing

Most pocket door complaints are not about the leaf. They are about a track set out of level, a floor finish that changed after the setting-out was fixed, or a cavity built to a nominal thickness that the selected frame does not fit.

  • Ask which hardware set is supplied, and whether it is included in the price or sourced locally.
  • Ask for the required clear wall build and pocket depth for the selected system, in writing, before the framing trades start.
  • Confirm the door bottom clearance against your finished floor levels, especially over tiles and thresholds.
  • Agree who sets out the pocket and who installs the leaf. Split responsibility between a framer and a joinery supplier is where defects are created.

Check 4: whether one supplier can cover the whole door schedule

Buying doors in several packages from several sources multiplies coordination. Finishes have to be re-matched, deliveries arrive at different times, and each package has its own snag list.

Door typeWhere it is usedSanterson listing
Wood veneer pocket doorBathrooms, ensuites, pantries and studies where the leaf must disappearSanterson Wood Veneer Pocket Doors
Wooden sliding doorClosets and room division where a surface-mounted slide is acceptableSanterson Wooden Sliding Doors
Wood veneer hinged doorMain circulation and bedrooms where a conventional swing is requiredSanterson Wood Veneer Hinged Doors
Handleless concealed doorCorridors where a flush, handle-free wall face is the design intentSanterson Handleless Concealed Doors
Wood veneer folding doorWide openings where a sliding pocket is not feasibleSanterson Wood Veneer Folding Doors

Each of these is described as made-to-measure with project-specific dimensions and finish options. One purchase order, one production window and one container across all five types removes the finish-matching problem entirely.

Check 5: who coordinates the doors with the rest of the fit-out

Doors rarely fail alone. They sit next to wall panelling, wardrobes, skirting and architraves, and a mismatch between any two becomes visible on handover. Where doors are ordered as part of a wider package, the same team can reconcile the junctions before production.

Santerson describes its project work as covering design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, and final installation and handover. For door-heavy projects, that coordination is the reason to buy doors inside a broader package rather than as an isolated line item. See Turnkey Interior Project Solutions for how those stages are set out.

Check 6: shipping, sequence and site readiness

Made-to-measure doors arriving in the wrong sequence stop a fit-out. Pocket doors in particular cannot be fitted until the cavity, floor finishes and decoration are complete enough to receive them without damage.

  • Agree the packing list against room numbers, not just quantities, so crates can go straight to the right floor.
  • Ask how each crate should be packed and stored on site, and label every crate with its opening reference.
  • Confirm import terms, insurance and delivery address in writing; do not assume a quoted delivery covers everything to your door.
  • Book the site preparation dates against the confirmed production window, not against an estimate.

Santerson lists logistics support including freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Ask for the specific Incoterms, transit window and insurance scope for your shipment rather than relying on a general capability statement.

Check 7: what happens after handover

Sliding hardware is the part most likely to need adjustment after occupation. Ask before ordering which parts are covered, how spares for the track and hangers are supplied, and who adjusts a door that has dropped or rubbed.

Santerson's service pages list on-site installation, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance. Get the terms that apply to your project in writing before production, including what is excluded, so the after-sales position is a contract term rather than marketing copy.

A pre-order checklist for the buyer

  • Finished opening dimensions verified on site or from as-built drawings, per opening.
  • Wall build and pocket depth confirmed against the selected hardware system.
  • Veneer species, grain direction, edge detail and finish approved by signed physical sample.
  • Panelling and joinery in the same timber specified to the same approved finish.
  • Frame, track and hangers confirmed as included or excluded in the quotation.
  • Shop drawings returned, reviewed and countersigned before production starts.
  • Packing list keyed to room numbers; delivery sequence agreed with the site programme.
  • Incoterms, insurance scope and after-sales terms stated in the purchase order.

FAQ

Is a wood veneer pocket door more expensive than a hinged door?

The leaf is usually comparable, but the pocket build and hardware add cost that a hinged door does not carry. Compare the assembled cost of opening, frame, track, wall build and installation, not the price of the leaf alone.

Can I order one size for all openings on a floor?

Not safely. Wall thicknesses and finished floor levels vary between wet and dry areas, and pocket depth depends on the hardware selected. Each opening should be dimensioned individually.

Should the doors be ordered with the rest of the joinery?

If the design uses one timber across doors, panelling and wardrobes, ordering together removes the risk of two different finishes meeting on the same wall. That is a specification decision you make before quotation, not after.

Next step

Send your door schedule with opening dimensions, finish references and your site programme, and you will receive shop drawings and a specification covering leaf, frame and hardware before anything goes into production. Enquiries can go through the Contact page.