A door schedule that looks complete on paper can still fall apart on site. Veneer doors are ordered once, cut to a single set of dimensions, and then hung against wall finishes that have already been levelled and decorated — so an omission in the checklist becomes a re-order, not a quick fix. The list below is what we ask buyers, contractors and designers to settle before a Santerson Wood Veneer Hinged Doors order goes into production, and it applies equally whether you are fitting out one villa bathroom or scheduling doors across a whole residential project.

1. Confirm the opening from the finished floor and finished wall face

Made-to-measure sizing is the first decision, and it is also where most errors start. Measure the structural opening, then record what the completed finishes will be: floor build-up, wall plasterboard or panelling, skirting, and any reveal or architrave you intend to keep. A door ordered against a bare slab will not clear a tiled floor with underlay.

  • Width, height and wall thickness taken from the finished surfaces, not the structural frame.
  • Whether the wall thickness varies along the opening, which is common on partitioned villas.
  • Flooring type at the threshold, including tile adhesive, screed or raised transitions.

Send the same numbers for every opening in one document. Doors ordered room by room across several site teams is how mismatched heights appear at handover.

2. Fix the swing, handing and hardware package

Hinged doors need the opening direction and handing agreed before the leaf is built, because hinge positions, lock preparation and any rebates follow from that choice. Confirm each of these per opening:

  • Left- or right-hand swing, and whether the leaf opens into or out of the room.
  • Hinge type, count and finish, matched to the leaf weight and expected traffic.
  • Lock case format, handle centres, and whether privacy, passage or key functions apply.
  • Whether closers, door stops or thresholds are included in your scope or supplied locally.

Where hardware is sourced locally, send its datasheet to us before production so the preparation matches. Where you would rather have it supplied with the door, say so at quotation stage.

3. Choose the veneer species, cut and grain direction

Veneer is a natural material, and the visible result depends on decisions you make on paper months before delivery. Record them explicitly in the order rather than leaving them to be inferred from a photograph.

DecisionWhat to specify
Species and toneMatch to the joinery already specified for the project, such as Dark Tone Veneer Cabinets or Light Tone Veneer Cabinets, so doors and cabinetry read as one palette.
Cut and figurePlain-sliced or crown-cut appearance, and whether a book-matched or quarter-matched leaf face is required.
Grain directionVertical grain on the leaf face, stated for every opening so a batch does not mix orientations.
FinishMatt or higher-sheen surface, consistent with Matte Finish Veneer Wardrobes and other veneer items in the same specification.
Leaf constructionFlush face or panelled layout, per room rather than project-wide.

Approve a physical sample before the full schedule is released. Screens vary widely, and a veneer tone approved on a monitor is not an approval of what arrives on site.

4. Decide how the door relates to the surrounding wall

A hinged leaf rarely sits in isolation. In open-plan villas and hotel rooms, the same veneer is often carried across walls, wardrobes and concealed openings, and the detailing differs for each case.

Agreeing this early also prevents a common sequencing error: wall finishes being completed to a line that the door frame then has to follow.

5. Check each opening against its actual use

The same veneer leaf does not suit every room. Before you release the schedule, walk it room by room:

  • Bathrooms and wet areas: ventilation, moisture exposure of the wall build-up, and privacy ironmongery.
  • Bedrooms and studies: acoustic expectations and whether a standard Standard Interior Hinged Doors specification is sufficient there.
  • Corridors and high-traffic areas: leaf protection at handle height, hinge loading, and closer requirements.
  • Utility and service cupboards: whether a hinged arrangement works with the joinery inside, or whether Santerson Wood Veneer Folding Doors free up the swing path.
  • Furniture clearance: wardrobes, beds and vanities that must clear a fully open leaf.

Where a room needs a different answer from its neighbours, order it separately rather than forcing one specification across the whole schedule. The Windows and Doors range covers hinged, sliding, pocket, folding, concealed and French arrangements for exactly this reason.

6. Set the delivery, packing and storage plan

Veneer leaves and frames are finished goods, and damage in transit or on site is the most expensive failure mode. Cover this before production:

  • Delivery address, port or site, and who receives the consignment.
  • Packing format — vertical or flat, leaf and frame separated or assembled — agreed for your handling equipment.
  • Marking on each package so it matches the room numbers in your door schedule.
  • On-site storage: dry, covered, off the ground, and away from wet trades until the room is closed in.

Our logistics service covers freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery; import terms, duties and transit times are confirmed for each project individually rather than assumed.

7. Confirm the installation and handover sequence

The last section of the checklist is the one that decides whether the doors look as intended at handover.

  • Who fits frames, who hangs leaves, and who adjusts after settlement — agreed in writing before delivery.
  • Where door ironmongery is installed: in the factory or on site.
  • Paint, touch-up and cleaning responsibilities for the veneer surface.
  • A snag list per opening, checked against the approved sample and the schedule.
  • Spare-parts needs recorded at order stage, so replacements for hardware or a single leaf can be sourced later.

Installation and after-sales support are part of our service scope, including on-site guidance, inspection and snagging, warranty coverage and spare parts. Warranty terms and response arrangements should be confirmed in the contract for your project.

The short version: finished-opening dimensions; swing, handing and hardware; veneer species, cut, grain and finish approved from a sample; the door's relationship to wall finishes and adjacent joinery; use-based checks room by room; and the delivery, storage and installation sequence. Anything missing from that list is what gets discovered at handover.

Send us your door schedule

Share the opening sizes, room list and the veneer or cabinetry already specified for your project. As a one-stop furniture and building materials supplier, we can produce the doors alongside the joinery, wall panelling and other fixtures in the same package, under Turnkey Interior Project Solutions. Contact PHILLIP to start a quotation.

Contact Us