A tall bar cabinet looks simple on a drawing. It is one floor-to-ceiling box with doors, shelves and a little lighting. The problems appear later, when the unit arrives on site and the glassware does not fit, the doors rub the skirting, or the wine cooler has no ventilation gap. Most of those problems are decided at the specification stage, not during production.
If you are a purchaser, contractor, designer or developer specifying tall bar cabinets for villas, apartments or hospitality projects, the document you send to the factory matters more than the reference photo. Below is the structure we use internally when a bar unit moves from an image to a make-to-measure order, and the questions we need answered before we quote.
Start with the job the cabinet has to do
Two identical-looking tall units can carry completely different internal requirements. A wet bar for a resort lounge needs glass storage, a small fridge cavity and a workable counter height. A display unit in a villa lobby is mostly about shelf spacing, lighting and finish consistency with the joinery around it. Before you write a single dimension, state the use case in one sentence, then list what must be stored inside: stemware, bottles by the case, decanters, glassware, linens, bar tools, a kegerator, or nothing at all.
The seven blocks of a complete specification
1. Location, opening and clearances
Give the room, the wall elevation, finished floor level, and the exact opening width and height. Note skirting, architraves, cornices, ceiling bulkheads, switches, air grilles and any door swing that crosses the front of the unit. For a recessed installation, tell us whether the cabinet is to fill the recess or sit in front of it, and how the reveal is to be closed.
2. External dimensions and how they are measured
State overall height, width and depth, and say whether those figures are the cabinet carcass or the finished envelope including plinth, cornice and door faces. A 20 mm difference in door face thickness changes what fits in a recess. Where the unit meets another run of cabinetry, specify whether returns, scribes or filler panels are required.
3. Internal layout and storage
Send an internal elevation: shelf positions, adjustable or fixed, drawer stacks, wine rack type, stemware rail, and the height of every compartment. If a specific item must fit, name it and give its dimensions rather than assuming standard spacing. Our compact bar cabinets and full-height units are built to the same internal drafting rules, only at different scales.
4. Materials, finishes and edges
Name the substrate, the surface material and the finish for each visible part: door fronts, carcass interior, shelves, back panels and plinth. Our bar cabinet range is offered with made-to-measure sizing plus material and finish options, so you can match an existing wardrobe or kitchen run rather than accept a stock colour. Specify edge treatment on all visible edges, and note whether the interior of the doors should match the exterior.
5. Doors, hardware and operation
Specify door type (hinged, sliding, bi-fold or glass front), opening direction, handle style or a handleless profile, hinge brand or grade if required, soft-close needs, and drawer runner load rating. Glass-front bar units need extra detail: glass type, thickness, tint or ribbing, and how the glass is retained.
6. Services: power, lighting and cooling
Anything electrical must be drawn on the elevation, not described in an email. Give socket positions, isolator locations, cable routes, and for under-counter or built-in refrigeration the ventilation path and clearance the appliance manufacturer requires. For internal lighting, specify LED strip type, colour temperature, driver location, switch or sensor behaviour, and how the driver will be accessible for maintenance.
7. Installation and site sequence
State who installs the unit, whether it is delivered assembled or flat-packed, access constraints on site (lift size, stair width, corridor turns), and where the unit sits in the programme relative to flooring, wall finishes and benchtops. Level tolerance matters: tell us how much out-of-level floor you expect, so we can design an adjustable plinth instead of discovering it on installation day.
A specification sheet you can copy
| Item | What to state | Why it causes rework if left blank |
|---|---|---|
| Project and unit ID | Project name, room, unit code, drawing revision number | Revisions get mixed and the wrong version is produced |
| Use case | One line: what is stored and how often it is used | Shelf heights end up unusable |
| Overall size | H x W x D, carcass or finished envelope, floor to ceiling or with cornice | Unit will not fit the recess |
| Internal elevation | Every shelf, drawer and compartment with dimensions | Glassware and appliances do not fit |
| Fronts and finish | Substrate, surface material, colour or grain reference, sheen level | Colour mismatch with adjacent joinery |
| Carcass interior | Finish of inside faces and back panel | Visible raw board when doors open |
| Doors and hardware | Type, swing direction, hinge grade, soft close, handle profile | Doors clash with walls or handles on site |
| Glass | Type, thickness, tint, retention method (glass-front units) | Safety and fixing details arrive too late |
| Appliance cavity | Model or clear opening size, ventilation path, door clearance | Cooling unit overheats or will not fit |
| Electrical | Socket and isolator positions, driver location, lighting spec | Wiring is chased after the unit is installed |
| Site conditions | Floor level tolerance, wall build-up, skirting and cornice details | Scribing and packing work on site |
| Delivery and install | Assembled or flat-packed, access route, installer, sequence | Unit cannot be carried into the space |
Where specifications usually fail
- Reference photos instead of dimensions. A picture communicates style, not size. Attach it, but never let it replace the elevation.
- Assumed appliance. Specifying "wine fridge space" without a model or clear opening usually means the wrong cavity and no ventilation path.
- Finish named by feel. "Matt grey" has dozens of interpretations. Use a code, sample reference or physical approved sample.
- No door swing on the drawing. Hinge side is decided in production if you do not decide it first.
- Lighting left to last. Drivers need a location and access route; retrofitting them means cutting finished panels.
How the specification moves into production
Because these units are made to measure rather than stocked, the specification is the order. Our glass front bar cabinets follow the same path: your document becomes a shop drawing, the shop drawing comes back to you for sign-off with every dimension and material called out, and only then does the unit enter production. Confirm the dimensions and selected specification for each project before that sign-off; changes after approval cost time on both sides.
SANTERSON works as a manufacturer of furniture and interior fixtures for villa, hospitality and office projects, so bar cabinets are usually specified alongside wardrobes, media walls, kitchen cabinetry and doors. Where several joinery items share one wall, put them on one elevation sheet so reveals, shadow gaps and finish lines can be coordinated instead of reconciled on site.
Send us your bar cabinet drawing. Share the elevation, internal layout and finish references, and we will return a shop drawing with dimensions, materials and hardware confirmed before production begins. Enquiries are handled by our project team, who also coordinate the rest of the built-in joinery package for the same project.