Grey shaker cabinets look simple on a drawing, which is exactly why they cause trouble on site. A handful of recessed-panel doors, one worktop and two appliance housings can turn into weeks of rework if the openings, services and finishes were never written down together. An installation plan is the document that prevents this: it records what has to be true about the room before a single carcass leaves the factory, and what has to happen, in what order, once the crates arrive.

For projects supplied by SANTERSON, the cabinets are made to measure, so almost every dimension below is fixed at the point of manufacture. That makes the plan more important, not less: a 10 mm error caught in the workshop costs a drawing revision; the same error caught on site costs a wall.

What the installation plan actually has to do

A quotation tells you what you are buying. The installation plan tells the builder, the electrician, the plumber and the finishing trade what they have to deliver to each other. It answers four questions in writing:

  • Which walls will carry the cabinets, and are those walls straight, plumb and able to take the load.
  • Where every water supply, waste, socket, switch and light point must sit relative to the cabinet lines.
  • What floor and wall finishes are being installed, at what thickness, and in which sequence relative to the cabinets.
  • Who inspects what, when, and against which drawings — including how shortages and damaged cartons are recorded on arrival.

Section 1: Site conditions and the survey record

Attach the measured survey to the plan, not just a set of nominal room dimensions. Record floor level variation across the run, wall offsets and out-of-plumb readings, ceiling height at both ends of the kitchen, and the position of every fixed obstruction: downpipes, radiators, skirting, door reveals, window reveals, beams and columns.

Grey shaker fronts read as a flat, regular grid. A wall that wanders along a three-metre run shows up as an uneven scribe line and misaligned panel gaps, which no amount of on-site adjustment can fully hide. The plan should state where filler panels and scribes are allowed, and how wide they may be before the detail is rejected.

Also record finishes that already exist. Renovated villas and occupied apartments frequently keep existing floor levels and tiled splashback zones; the plan should say whether the cabinets sit on the finished floor or on the structural slab, because that single decision changes every height in the drawing.

Section 2: Drawings, dimensions and sign-off

The plan must list the exact drawing set installers are working from — elevations, a dimensioned plan, sections at the tall housing and worktop edges, and an appliance integration drawing. Each drawing should carry a revision number and a date, and the plan should state who signed it off.

Our Grey Shaker Cabinets are produced to project-specific dimensions, with layout, door colour and surface finish confirmed per project before production starts. Sign-off on the drawings is therefore a hard gate: after approval, changes require re-manufacture rather than adjustment.

Before sign-off, confirm in writing:

  • Carcass heights and worktop height for each run, with the finished floor level stated.
  • Door direction, door gap specification and handle position on every elevation.
  • Internal fitting schedule — drawer stacks, shelf spacings, pull-out trays, larder housings, bin housings and appliance housings.
  • Corner and end returns, including which corner solutions are used and the clear access they give.

Section 3: First-fix services

This is where most grey shaker kitchens lose time. Every service has to be positioned against the cabinet drawing, not against a general room layout.

ServiceWhat the plan must fix
Water supply and wasteSink bowl position relative to carcass lines; stop-tap access once the doors close; waste route and trap depth before the floor build-up is laid.
Appliance positionsOven, hob, extractor, dishwasher, fridge and any integrated wine cooler: housing dimensions, ventilation gap, door swing clearance and the power or gas point each one needs.
Electrical outletsSockets inside appliance housings and base units for small appliances, plus switch positions — all shown on the elevation the electrician receives.
LightingWorktop task lighting, in-cabinet lighting for glass display units and any island feed. Note where a driver or transformer must stay reachable after installation.
Splashback zoneTiled or stone zone extents and set-out, agreed with the cabinet line so the panel edge detail is clean at both ends.

Where glass-fronted display units or lit niches form part of the design, the plan should show the cable route and the access point. A driver sealed behind a fixed carcass is a maintenance problem someone else inherits.

Section 4: Sequencing with other trades

State the order of work explicitly, because installers are otherwise told a room is ready when it is not. A typical sequence for made-to-measure cabinetry:

  • First-fix services complete and tested; walls made good, level and dry.
  • Floor finish installed to the agreed level, with protection laid along the run.
  • Wall finishes behind and around the cabinets completed before delivery where access is limited afterwards.
  • Cabinet delivery, inspection against the packing list, then installation of wall units followed by base units and tall housings.
  • Worktop templating or fitting, sink and hob cut-outs, sealing to the splashback.
  • Appliance connection, door adjustment, hardware check, cleaning, snag list.

If the worktop is templated on site, the plan must allow that visit in the programme. If it arrives pre-cut from drawings, the plan must state who signed off those dimensions.

Section 5: Delivery, handling and storage

For international projects, delivery belongs inside the installation plan rather than in a separate logistics file. The plan should record the delivery address, the receiving contact, the expected carton count from the packing list, and who signs for the consignment.

Add an inspection step: cartons opened and checked against the packing list on the day of arrival, with damage or shortage photographed and reported immediately. Doors and panels are the parts most likely to be damaged in transit and the slowest to replace, so this check protects the programme. Store doors, panels and hardware off the floor, indoors, and keep them in labelled cartons until the fitting trade needs them.

SANTERSON's logistics and door-to-door delivery service covers freight arrangements, packaging and container loading, shipping documents and tracking. Incoterms, duties and the exact delivery point should be confirmed project by project in writing.

Section 6: Installation standards to inspect against

Put the acceptance criteria for fitting into the plan so both sides inspect against the same list:

  • Runs level and plumb along their full length, with wall units fixed to a substrate confirmed as suitable for the load.
  • Door gaps consistent across the kitchen, with recessed shaker panels visually aligned at adjacent doors.
  • Drawers and runners operating freely under load; soft-close hardware correctly adjusted.
  • Carcasses secured, worktop supported along its full span, sink and hob cut-outs sealed.
  • Appliance housings ventilated as specified, with no service access blocked by fixed panels.

Section 7: Protecting grey fronts on a live site

Grey shows dust and scuffs, so the plan should require painting, touch-up and final decoration to be finished before doors are hung wherever possible, and should say how the fronts are protected afterwards.

  • Keep protective film on worktops and panels until handover, but do not leave film on painted or lacquered fronts longer than the finish allows.
  • No cutting, sanding or drilling near fitted doors unless the doors are covered or removed.
  • Any on-site touch-up recorded on the snag list together with the material used, so the finish can be matched later.

Section 8: Snagging, handover and after-sales

Close the plan with a handover pack: marked-up as-installed drawings, the internal fitting schedule, appliance documentation, spare hinges and handles if supplied, and the signed snag list. State who holds each document.

SANTERSON lists installation and after-sales support, covering on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Warranty terms, response times and exclusions vary by project and region, so confirm them for your own order rather than assuming a standard package.

Before the plan goes out: can every number in it be traced back to a signed drawing? If a dimension came from an email, a sketch or a verbal agreement, it is not in the plan yet — and that is where grey shaker installations lose their time.

How a supplier's project team carries the plan forward

When cabinetry comes from a one-stop furniture and building materials supplier, the installation plan can be prepared alongside the rest of the fit-out, so kitchen joinery, wardrobes, vanities, doors, wall panelling, lighting and flooring are coordinated against one set of levels and one programme instead of several separate ones. Our custom and OEM service covers bespoke sizing, finishes and internal layouts, and the project workflow runs from design and detail confirmation through production, logistics and site coordination.