A quotation for Santerson Open Display Niches arrives as a spreadsheet, and most buyers read only the total. Built-in display niches are made-to-measure joinery: they sit inside an integrated storage wall, share finishes and substrates with closed cabinets, shelving and panelling, and their price moves with every dimension, substrate and opening detail. The checklists below show what a complete quote should state for this product family, and which gaps to close in writing before you place an order.

1. Scope: where the niches sit in the wall build-up

Open display niches are rarely a stand-alone line item. In most projects they are one module of a wider storage or media wall, next to closed cabinets and full height storage walls. A usable quote states which items belong to the same wall run, so that panel thickness, substrate and finish match across modules rather than being decided twice by two different suppliers.

Ask the quotation to show a simple elevation or layout sketch with overall width, height and depth for each niche, plus its position relative to skirting, ceiling line, doors and switches. Without that drawing you cannot compare two quotes on equal terms.

2. Dimensions and site tolerances

Confirm whether the quoted dimensions are finished sizes or opening sizes, and which side of the wall the measurement is taken from. Then check three practical points:

  • Whether on-site measurement or a dimension survey is included, or whether you must supply dimensions yourself.
  • How out-of-plumb walls and uneven floors are handled — packing, scribing to the wall, or an extra site visit.
  • Whether the quote includes an approval stage on shop drawings before production starts, and how many revision rounds are covered.

3. Substrate, finish and edge details

The product pages for this collection list project-specific dimensions together with material and finish options, so the quote must name them rather than say "as per standard". Look for:

  • The board or substrate specification and the surface treatment — laminate, lacquer, veneer or paint — stated by name.
  • Edge treatment on visible niche reveals: matching edge banding, solid timber lipping, or a shadow gap detail.
  • Colour reference for the finish. Where the supplier offers woodgrain options, ask whether grain direction is fixed or can be specified for horizontal and vertical reveals.
  • The backing panel for each niche, and whether it matches the surrounding wall panels in colour and texture.

4. Lighting, power and services

Display niches are usually lit. If your design calls for concealed lighting inside an open niche, check that the quote states who supplies the light fittings, the driver and the wiring; who provides the first fix on site; and where the transformer sits if it is hidden in a closed module nearby. Also confirm the cut-out position for sockets or data points, since these are easier to allow for at production than on site.

Where lighting is quoted as an option, ask whether it is covered by the same warranty terms and spare-parts arrangement as the joinery itself, and what happens if a driver fails after handover.

5. Commercial terms to read line by line

Item in the quoteWhat to confirm before signing
Unit price basisPrice per linear metre, per square metre or per module — and which dimensions that price covers.
Trade termsIncoterms for the shipment, the named destination, and whether duties and local taxes are excluded.
Packaging and protectionCrating method for finished panels and niche modules; corner protection; labelling that matches room or wall-run codes on your drawings.
Delivery splitWhether niches ship with the rest of the wall run in one container, or in a separate consignment, and how partial deliveries are priced.
Installation supportWhether fitting is done by your local tradesperson from fixing drawings, or with guidance from the supplier's team; what documentation comes with the crates.
Payment scheduleDeposit, the milestone tied to production sign-off, and the balance due before shipping.
Change ordersThe cut-off date after which a dimension or finish change carries a cost, and how that cost is calculated.
Warranty and sparesDuration and exclusions in writing, plus how replacement panels for a niche are ordered later.

6. Common gaps to question before you award

  • A single lump-sum line for "storage wall joinery" with no breakdown of open niches, closed cabinets and panels.
  • Finishes described by marketing name only, with no substrate or surface specification.
  • No allowance for site measurement, shop drawings or fixing details.
  • Lighting priced but not specified, with no wattage, colour temperature or driver information.
  • Delivery quoted to port when your programme needs the goods at the building; if you are sourcing for an Australian project, ask explicitly how far the delivery goes — logistics and door-to-door delivery arrangements should be written into the quote with the Incoterms stated.
  • Warranty wording that differs between the joinery, the lighting and any hardware.

7. How to compare two quotations fairly

Put both quotes into the same table: scope, finished dimensions, substrate, finish name and reference, edge detail, lighting allowance, drawings included, delivery basis, installation support, warranty. Where one quote is cheaper, the difference usually shows up as a missing line — no measurement service, thinner substrate, or a delivery term that leaves inland freight with you.

SANTERSON works from a project brief through design and detail confirmation to production, shipping and site support, so a quotation for this collection is normally issued after your layout and finish choices are confirmed. Send the wall elevation, room dimensions and the finishes you want matched, and ask for the quote to be reissued with every item above filled in — turnkey solutions for villa and hospitality projects are coordinated through the same team that handles production.

Send your wall layout for a priced breakdown

Share drawings or room dimensions together with the finishes you need, and ask for an itemised quotation covering materials, lighting allowance, delivery basis and installation support. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the contact page.