A swim spa quotation goes wrong long before the factory sees it. It goes wrong in the enquiry, when a buyer writes "one 6-metre swim spa" and leaves everything else to the supplier. Two projects with that same sentence can end up with different jet counts, different pump sets and completely different electrical demands. If you are specifying Outdoor Swim Spa WS-S06CT for a villa terrace, a resort garden or a private residence project, the specification you send is the single most important document in the whole process. Here is how to write one that comes back with a comparable, complete price.

Why swim spa specifications need more detail than other outdoor products

Most items in an outdoor project are specified by size and material: a lounger is 190 cm long, the frame is aluminium, the weave is rope. A swim spa is different because it is a small plant room with water, pumps, controls and a power load attached to it. The shell dimensions may be identical across two models while the equipment inside them differs completely. In our own catalogue, WS-S06C and WS-S06CT share the same catalog footprint of 5880 x 2380 x 1400 mm, yet they carry different pump counts, jet totals and total power figures. A specification that only states the length will not distinguish them.

That is also where disputes start. If your enquiry does not say whether a heat pump, UV sterilisation or steps are included, the supplier quotes what their standard package contains, and you compare that quotation against another supplier's very different package. The rest of this guide is a section-by-section way to avoid exactly that.

Section 1: Identify the model and confirm its catalog figures

Start with the exact model code, not a size description. For WS-S06CT, our catalogue lists the following. Put these numbers in your document as the baseline you are quoting against, and ask the supplier to confirm each one in writing on their proforma invoice.

Specification itemCatalog figure for WS-S06CT
Model codeWS-S06CT
Catalog dimensions (L x W x H)5880 x 2380 x 1400 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jet total31 pcs
LED lights4
Total power8.35 kW
Features shown on the product pageWater jets, LED lighting, Ozone, Swim training system

Two practical points about this table. First, treat the dimensions as catalog figures for the shell. Confirm separately what clearance and access width your site allows, because the delivered unit has to reach its final position, and confirm with your structural engineer or builder that the deck or slab can carry the unit when it is full of water. Second, "Total power 8.35 kW" is a figure for this configuration only. It changes the moment you add a heat pump or change the pump set, so never carry a power number across from one model page to another.

Read the model code carefully. WS-S06CT and Outdoor Swim Spa WS-S06CT-L look almost identical in a quotation and are not the same product. The -L variant is listed at 6670 x 2380 x 1400 mm, which is roughly 790 mm longer. If your site plan has a fixed terrace boundary, that difference decides whether the unit fits at all.

Section 2: Separate standard equipment from optional accessories

This is the section most enquiries skip, and it is where comparable quotations are won or lost. Across the configurable swim and hydrotherapy range, the catalogue lists options that include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so your specification should do three things:

  • List what you assume is included. Copy the equipment list from the product page into your enquiry and ask for confirmation line by line.
  • List what you need but cannot see on the page. If you want a heat pump for year-round use in a cooler climate, or insulation for a colder site, write it as an explicit requirement rather than an expectation.
  • Ask for a priced options table. Request the add-on items with individual prices, so you can decide after seeing the numbers instead of committing before.

A swim spa without insulation or a heat pump is a different product to use in Melbourne than it is in Singapore. The equipment list, not the brochure photograph, is what determines that.

Section 3: State the intended use, not just the size

The same shell serves different jobs, and the job changes what you should ask for. Tell the supplier which of these describes your project:

  • Daily lap training. The swim training system becomes the priority item; confirm it is included as 1 set and ask how its output is adjusted.
  • Hydrotherapy and massage. Jet layout and count matter more than length. WS-S06CT is listed with 31 jets in total; ask where they are positioned and which zones they serve.
  • Family leisure and mixed use. Depth, entry steps and water features move up the list.
  • Hospitality or resort installation. Maintenance access, filtration duty cycle and control-system specification become procurement questions rather than lifestyle ones.

If your project needs a longer swimming channel with a separate relaxation area, that is a different product type, for example our Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool. If the space calls for a non-rectangular footprint, a customised shape may be the better route: this Customizable Shape Outdoor Spa is made in square, round, oval and curved designs with an acrylic shell. Naming the use case first helps a supplier point you to the right item instead of quoting the one you happened to find.

Section 4: Cover site conditions and services in the same document

A swim spa is rarely the only item on a project. It sits alongside a deck, an electrical supply, drainage, and often poolside furniture and paving from the same package. Because we work as a one-stop furniture and building materials supplier, project buyers frequently combine the swim spa with outdoor furniture, wall and ceiling finishes, lighting and flooring in one procurement package. That is worth stating in your specification so the same team prices and coordinates them.

Include these site items in writing:

  • Deck or slab type, and who is responsible for preparing it.
  • Total power figure and your site's supply details. Total power for this configuration is listed at 8.35 kW; give that number to your electrician instead of assuming the existing circuit handles it.
  • Drainage, overflow and any local permit requirements you have already identified.
  • Delivery access: gate widths, any lifting needs, and the final route to position.
  • What happens after delivery. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail with customs paperwork and container loading, and our installation and after-sales support covers on-site installation, inspection and spare parts. Confirm the scope for your specific port, site and country in the order documents.
Scope is confirmed per project. Freight terms, duties, installation coverage and warranty terms vary by destination. Treat any service description on a website as a starting point and get the applicable scope, lead time and warranty wording into your purchase order.

Section 5: A checklist to paste into your enquiry

Before you send anything, check that your document answers all of these:

  • Exact model code and the catalog dimensions you are quoting against.
  • Equipment list copied from the product page, with a request to confirm each line.
  • Options you want priced separately: heat pump, UV sterilisation, insulation, sand filtration, steps, spare control system.
  • Total power figure and your site's supply details.
  • Intended use: training, hydrotherapy, family or hospitality.
  • Site conditions: deck, access route, drainage, permits.
  • Delivery terms and the installation scope you expect.
  • The comparison model, if you are weighing two sizes, for example WS-S06CT against the longer WS-S06CT-L.

Write those eight points and the quotations you receive will actually be comparable. That is the whole purpose of a specification: not to sound technical, but to make sure every supplier prices the same thing.

Start a specification review. Send us the model code, your site conditions and the options list above, and we will confirm the equipment configuration and total power for your project before quoting. Browse the full Swimming Pools and Swim Spas range, or contact our team to check a configuration against your site plan.