A wardrobe enquiry for high gloss veneer wardrobes usually starts with two attachments: a render of the bedroom and a note that says "as per image". For a made-to-measure joinery item where the whole point is a reflective wood surface, that is not enough to get a price you can rely on, let alone an article you can install. The brief has to carry the information a factory needs before it cuts veneer.

High gloss veneer sits at the awkward end of the wardrobe range. It combines a natural material, a clear coating built up in layers, and a large flat panel that shows every error in setting-out and light planning. The questions below are the ones worth answering before you send drawings, because each unanswered item turns into either a variation order or a panel you cannot accept.

Start with the room, not the door

Veneer wardrobes in this family are made to measure, with the layout and dimensions tailored to the individual project. That means the starting point is the space, taken from site survey rather than from a standard module list.

  • Send surveyed dimensions at high, middle and low points for each wall run, plus out-of-square notes. A run of panels that has to look continuous across a leaning wall is a different build from one on true walls.
  • State finished floor and finished ceiling levels, and whether the wardrobe runs to the structural slab or to a set-down bulkhead.
  • Mark skirting, architraves, radiators, switches, curtain recesses and door swings on the drawing. Panels that have to scribe around these need cut marks decided at the factory, not on site.
  • Say what is behind the carcass: brick, plasterboard, timber frame. Fixing method and packing depend on it.

If the design includes a curved return, an angled corner or a mitred external edge, flag it in the first message. Those details change how the veneer is pressed and joined, and they are the items most often priced as an afterthought.

Specify the veneer itself

"High gloss veneer" describes a finish, not a material. Two quotations using that phrase can differ in species, cut and grain matching. Put these on paper:

Item to specifyWhy the factory needs it
Species and cut — oak, walnut or another species; crown cut, quarter cut or rift sawnGrain figure and colour vary widely between cuts of the same species, and a wide crown-cut panel reads very differently from a tight quarter-cut one.
Veneer grade and whether sapwood or mineral marks are acceptableGrade determines how much of each sheet is usable and how consistent a run of doors will look.
Grain direction across the whole elevation, and matching at reveals and returnsVertical on doors with horizontal on drawer fronts looks deliberate only if it was decided in advance; otherwise it looks like a mistake.
Sequence or book-match pattern where the design calls for itBook-matched panels must be cut from consecutive leaves of the same flitch, which affects how early the order has to be placed.
Stain or bleaching treatment, and the clear coat build for the glossColour under a gloss film is what you actually see; ask for the finished sample, not the raw veneer.
Backing balance on both faces of each panelA single-faced veneer panel in a large door size can cup. Balanced construction is part of the specification, not an upgrade.

Where the design mixes finishes — gloss veneer doors with matte finish veneer wardrobes in an adjacent room, or a two tone veneer combination inside one run — send all of them together. Matching stain and sheen across separate orders is where colour drift appears.

Agree the sample before the order, not after

Ask for a physical sample panel in the actual construction: substrate, veneer thickness, clear coat build, and edge treatment. Look at it under the lighting planned for the room, because gloss surfaces are judged by reflection, not by colour card.

  • Check the surface at a low angle for orange peel, dust nibs and roller or spray marks.
  • Check the edge. Mitred veneer edges, ABS-type edging and lacquered lipping each look different on a gloss door; decide which one the price refers to.
  • Approve the sample in writing and keep it as the reference for delivery inspection.
Ask how many panels of the approved sample were produced before your order. A finish that was made once for a photograph and a finish running on a line are not the same thing.

Settle the interior layout separately from the exterior

The doors carry the design; the inside carries the cost. Specify shelving, hanging zones, drawers, tall units and any integrated lighting as its own schedule, with dimensions per wardrobe. If part of the run uses standard storage instead of gloss panels, say so — mixing carcass finishes is a normal way to control budget without touching the visible elevation.

Where a project needs storage walls across several rooms rather than one wardrobe, ask about modular systems in the same visit. A combination modular wardrobe arrangement can be quoted alongside the bespoke run, and comparing both tells you whether the whole elevation needs to be made to measure or only the parts that are seen.

Cover the practical items that decide delivery

  • Panelling and handling. Gloss panels need edge protection and flat packing for export. Ask how they are packed, and how spares are supplied.
  • Sequence of supply. If the bedroom floor or the plaster is still open, say so; setting levels and site conditions change scribing allowances.
  • Site assembly. Confirm whether panels arrive as carcasses or flat packs, who assembles them, and what tolerance the fitter is expected to absorb.
  • Care and warranty terms for the gloss coat. Ask in writing what the coating covers, what contact and cleaning products to avoid, and how a damaged panel is replaced — replacing one gloss veneer door into an aged run is a colour-matching job.

What to send with the enquiry

  • Surveyed room dimensions and elevations, marked with levels and obstructions.
  • Elevation drawings showing door sizes, reveal widths and grain direction.
  • Veneer species, cut, grade and matching rules, plus the approved sample reference.
  • Interior storage schedule per unit.
  • Edge detail decision, packing expectation and delivery location.

SANTERSON manufactures made-to-measure wardrobes in the wood veneer collection, including high gloss finishes with project-specific dimensions, layouts and finish options. Send your drawings, sample reference and storage schedule through the contact page to start a wardrobe enquiry.