A wardrobe order that mixes two door materials is where most quantity errors start. Glass reflects light and shows the interior; acrylic gives a solid, uniform surface. Put them in one run of Glass & Acrylic Combination Wardrobes and you are suddenly counting door leaves, carcass panels, tracks, hinges and finish samples across more than one material group. This guide walks through how buyers, contractors and project teams size those quantities and keep the two materials coordinated from drawing to handover.
Why mixed-material wardrobes need a different quantity sheet
A single-material wardrobe can be ordered as a set of identical modules: same door leaf, same edge banding, same hardware. A combination wardrobe breaks that symmetry. Glass doors and acrylic doors behave differently in three ways that directly change what you order.
- Different ordering units. Acrylic doors are usually ordered as finished leaves sized to the opening. Glazed doors are ordered as a frame system plus an infill panel, so the frame and the glass may reach site at different times.
- Different tolerances at the opening. A glazed leaf sits inside a rebate; an acrylic leaf closes against a face frame or a reveal. The gap you allow at the ceiling, skirting and adjacent wall is decided by the door type, not by the carcass alone.
- Different finish boundaries. Where a glass section meets an acrylic section, the transition detail — a trims, a shadow gap or a matching mullion — has to be drawn and quoted. Left out of the bill of quantities, it becomes a site variation.
Step 1: Count openings, not rooms
Start from a door-by-door schedule rather than a room list. For every wardrobe position on the drawing, record the opening width and height, the clear height under any ceiling bulkhead or cornice, and the depth you can actually build to once skirting, architrave and services are accounted for.
Our built-in furniture is made to measure for each project, so the schedule you send us is the document production works from. A workable entry looks like this:
| Item on drawing | Opening W x H x D | Door type | Finish / glass spec | Internal layout |
|---|---|---|---|---|
| Bedroom 1, north wall | As measured on site | Sliding, glazed section + acrylic section | To be confirmed from samples | Hanging top and bottom, centre shelves |
| Bedroom 2, recess | As measured on site | Hinged, all acrylic | Matte or high gloss, to be confirmed | Drawer bank plus hanging |
| Corridor niche | As measured on site | Open shelving with acrylic end panels | Matching Bedroom 1 | Adjustable shelves |
Take measurements from at least three heights and three widths per opening. Older villas and apartments rarely give you a square, plumb recess, and the smallest dimension governs the build.
Step 2: Decide the glass-to-acrylic split before you count anything
The proportion of glazed to solid doors changes both the look and the order. A practical way to set it is by what the section has to do:
- Display and light. Glazed sections read as display, and in a bedroom with limited natural light they keep a long run from feeling heavy.
- Storage you do not want on show. Acrylic leaves hide the everyday. Keeping linen, off-season clothing and luggage behind solid doors is usually the reason a project uses both materials in the first place.
- Visual length control. On runs that span a whole wall, alternating glazed and solid sections breaks up the mass. Decide the rhythm on the elevation drawing so the module widths fall where you want them.
Once the split is fixed, count each material separately. State the number of glazed leaves, the number of acrylic leaves, and how many of each are hinged versus sliding — the hardware sets differ, and a hinge set cannot substitute for a sliding track.
Step 3: Quantify the coordination pieces people forget
The items below rarely appear on a first-draft quantity sheet and are the usual cause of a second shipment:
- Transition trim, mullion or shadow-gap detail between the glazed and acrylic sections — measured in linear metres against the elevation.
- Track, rail, runners and soft-close hardware for each sliding leaf, plus hinges and handles matched to each door type.
- Interior fittings counted per section: hanging rails, shelf spans, drawer banks, and any integrated lighting with its wiring route and transformer position.
- End panels, scribes and packers sized to the measured out-of-plumb allowance at each wall.
- Reveal and skirting treatment — whether the carcass is scribed around existing architrave or the architrave is removed and replaced after installation.
Step 4: Coordinate finishes across the whole joinery package
Wardrobes are almost never the only joinery on a project. The same acrylic colour may reappear on vanity units, tall storage and custom built-in kitchen cabinets. Batch those items into one production instruction so they are made from the same material batch, and order physical samples of every colour before any panel is cut.
Two details to lock down in writing:
- Direction and grain. Wood-effect and textured surfaces have a direction. Note on the drawing which way each panel runs, including drawer fronts, or you will receive matching colours that do not match visually when installed side by side.
- Sheen level at the boundary. A high gloss acrylic next to a glazed section reflects twice what the drawing suggests. Confirm the sheen against a sample board in the actual room before signing off.
Step 5: Sequence production, packing and delivery around the two materials
Mixed-material orders need a deliberate sequence, because glazing and solid panels are frequently finished at different points in production:
- Confirm measured dimensions and finish selections against samples.
- Approve the elevation with module widths, door split and transition detail marked.
- Production and quality check of carcasses, doors and glazed infills.
- Packing by room and by opening, with each carton labelled to the item number on the drawing schedule.
- Delivery to site timed to the trades that must precede installation — flooring, painting, electrical first fix.
Labelling cartons to drawing item numbers rather than to room names alone is the single cheapest way to protect a multi-apartment or multi-villa order. Installers open the right pack in the right opening, and any shortage surfaces on day one instead of at handover.
Step 6: Pre-installation checks before the fitter arrives
- Re-measure each opening after floor and wall finishes are complete; compare against the approved schedule.
- Confirm the site can receive, store and keep dry a mixed consignment of panels and glazed leaves until installation.
- Check that door swing arcs clear beds, wardrobes opposite, light switches and door handles when opened fully.
- Verify electrical routes for any internal lighting, including the access point for the driver or transformer.
- Agree who protects finished walls and floors during installation, and who takes away packaging.
A short rule of thumb: if a quantity sheet lists only wardrobe sizes, it is incomplete. It should list doors by material and opening type, hardware per door, transition pieces in linear metres, interior fittings per section, and finish approvals with sample references.
How we support a combination wardrobe order
SANTERSON has been manufacturing furniture and building materials since 2008, and our custom and OEM service covers bespoke finishes, prototyping and project-specific dimensions. For a combination wardrobe package we work from your measured schedule and elevation: layout, glass specification and acrylic colour are confirmed against samples before production, then the order moves through our logistics and door-to-door delivery service with packing lists tied to drawing item numbers.
Send us your room schedule, elevations and the finish direction you are working to, and we will return a quantity breakdown that separates glazed sections from acrylic sections, including the transition details and hardware. If you are coordinating wardrobes alongside other joinery in the same project, tell us which items should share a material batch — that decision is worth making before production starts, not after.
Product specifications, dimensions and finish options are confirmed per project; the figures on this page are planning guidance rather than fixed technical values.