A shaker lacquer cabinet quotation only becomes comparable once the drawings, finishes and hardware behind it are written down. Two kitchens with the same door profile can carry very different prices depending on carcass depth, panel substrate, number of lacquer coats and how many drawers replace doors. The specification below is the checklist we use internally at SANTERSON when a buyer sends an enquiry about shaker lacquer cabinets, and it is the same structure that lets you compare suppliers on equal terms.
Start with the door profile, not the colour
The shaker door looks simple: a flat centre panel inside a four-piece frame. That simplicity is where most specification errors begin, because the visual difference between two shaker doors comes from proportions nobody mentions in an enquiry. Record three numbers before anything else.
- Rebate width — the width of the frame surrounding the centre panel. A narrow frame reads contemporary; a wider frame reads traditional and pairs better with panelled wardrobes and classic interiors.
- Centre panel treatment — flat, lightly routed or raised. Raised panels need more machining and more lacquer coverage on the profile edges.
- Edge break — whether the frame edges are sharp or softly eased. Lacquer pools differently on a sharp edge, so this affects both appearance and how the door should be handled on site.
Send a reference photograph of the door you want, ideally with a scale object in it. A picture removes ambiguity that no amount of written description resolves, and our team can match an existing sample when you post one to our factory in Foshan.
State the finish system in layers
"Lacquer" covers a wide range of sprayed finishes. In our Lacquer Kitchen Cabinet collection, shaker doors sit alongside matte lacquer cabinets and high gloss lacquer cabinets, which share the same door construction but differ in sheen and build-up. Specify the finish as a system rather than a single word:
| Item to specify | What to write down |
|---|---|
| Sheen level | High gloss, satin or matte, with an approximate sheen band agreed on a physical sample. |
| Colour reference | RAL code, Pantone reference, or a sent physical swatch. Screen colours are not a specification. |
| Preparation | Primer and sealer coats before the top coats, particularly for raised profiles. |
| Top coats | Number of sprayed coats and whether they are applied on all four edges. |
| Grain direction | Whether the substrate shows wood grain under the lacquer or is a solid colour. |
The practical reason for this detail: gloss and matte doors in the same kitchen age differently. Gloss shows handling marks and micro-scratches first, while a matte surface shows polishing rings if it is cleaned with the wrong product. Write the cleaning instruction into the specification so the maintenance team at handover already has it.
Separate the door from the carcass
Buyers commonly quote a door style and leave the cabinet box undefined, which is where budget gaps appear. For each run of cabinets, state:
- Carcass depth and height for base units, wall units and tall units, including whether plinths and scribes are included or site-trimmed.
- Carcass board type and edge treatment, since the box is what carries the load over years of use.
- Back panel fixing method, which matters on uneven walls in renovation work.
- Internal configuration per unit: shelves, drawers, pull-out trays, spice racks, appliance housings.
Drawers are the single largest cost variable. A tall larder specified as two doors is priced very differently from the same box with four internal drawers and soft-close runners. List drawer counts and runner type per unit rather than adding a general allowance.
Fix the hardware schedule
Hardware is usually supplied as a matched set, so specify it once for the whole kitchen instead of leaving each unit to be decided later. Our custom built-in kitchen cabinets are supplied with matching hinges, drawer slide rails, support legs and connecting brackets, and the schedule should name:
- Hinge type and whether soft-close is required on doors.
- Runner type and load rating for drawers, plus full-extension or partial-extension travel.
- Handle style, finish and fixing centres — or the absence of handles if a routed or push-open detail is used.
- Integrated lighting: cabinet interior lights, glass display cabinets and niche lighting, with the transformer location noted.
Give dimensions that a factory can build from
Our shaker lacquer cabinets are made to measure, so the drawing set is what determines whether the installation runs smoothly. A usable set includes a wall-to-wall layout with overall run lengths, individual unit widths, a section drawing showing base and wall unit heights, and setting-out dimensions from fixed points such as corners, door openings and existing pipework. Note obstructions explicitly: flues, radiators, skirting, uneven floors and any appliance you already own with its model number.
If the kitchen is part of a villa or apartment fit-out, mark which walls are new construction and which are existing. That single note changes how scribes and packers are specified, and it prevents an installer discovering the problem on the first day.
Record what still needs confirming
A good specification is honest about open points. Before production starts, both sides should sign off:
- A physical door sample in the agreed finish, viewed under the actual site lighting.
- Final dimensions taken after wall and floor finishes are complete.
- Appliance schedule with cut-out sizes, not just model names.
- Delivery sequence and storage arrangements on site.
How SANTERSON works from your specification
Once the schedule above is complete, our team confirms it against the factory build, produces the cabinets in our own facility and arranges door-to-door delivery to the project address. The same process applies whether you are fitting one villa kitchen or supplying custom kitchen cabinets for residential and hotel projects across several units, and it sits within a wider scope that covers interior fixtures, furniture and building materials from one supplier.
Send your layout drawings, door reference images and the finish you have in mind to PHILLIP on +86-13928214007 (phone and WhatsApp), or by email at santerson@qq.com. We will return a confirmed specification sheet with the quotation, so the price you compare is the price you build.
Ready to specify your kitchen?
Share your drawings and finish preference, and we will confirm dimensions, lacquer system and hardware schedule before quoting — shaker lacquer cabinets, made to measure for your project.