A two-tone lacquer kitchen is one of the easiest specifications to get wrong. Two colours, a reflective or low-sheen lacquer film, made-to-measure carcasses and a long production run mean small omissions on a quotation turn into expensive corrections after the cabinets arrive on site. The checklist below follows the order we use when reviewing an enquiry for our two tone lacquer cabinets, so you can compare supplier responses line by line instead of comparing headline prices.

1. Scope: what the price actually covers

Most disputes start here. A low unit rate per linear metre means little if tall panels, scribe fillers, plinth, cornices, end panels and benchtops are quoted as extras later. Before you compare numbers, ask each supplier to state the scope in the same terms:

  • Carcass construction and the panel board used for cabinet boxes, doors and drawer fronts
  • Whether tall units, appliance housings and pantry bays are inside the measured length or priced separately
  • Filler panels, scribes and adjustment strips needed to take out out-of-plaster walls and uneven floors
  • Plinth, cornice, light plinth, valance, end panels and any exposed return faces
  • Benchtops, splashbacks, trims and the cut-outs for sinks, hobs and tapware
  • Internal fittings: hinges, slides, handles or handleless profiles, legs, brackets, baskets, trays and organisers
  • Landing, handling and installation labour at the destination, if the supplier provides it

Ask for a line-by-line breakdown rather than one lump sum. When an item is missing you can see whether it was excluded on purpose or simply overlooked.

2. The finish schedule: colour, sheen and lacquer build

Two-tone schemes fail most often on the paint specification, because "two colours" is not a manufacturing instruction. For our Lacquer Kitchen Cabinet collection we confirm each of these before production starts, and you should expect the same from any supplier:

Item to confirmWhy it matters
Colour reference for each toneA named RAL or Pantone code travels; a photo does not. State which doors, drawer fronts and tall units carry the darker tone and which carry the lighter one.
Sheen levelHigh-gloss and matte lacquer behave differently under site lighting and show fingerprints differently. Our range covers high gloss lacquer cabinets as well as Matte Lacquer Cabinets, so the sheen is a specification choice, not an assumption.
Coating system and number of passesPrimer, base coat and top coat with sanding between passes is what gives lacquer its depth. Ask how many coats and whether edges are wrapped or taped.
Edge treatment on doors and drawer frontsLacquer built up over a radiused or chamfered edge reads as solid work; a hard square edge with thin coverage is the first thing to chip.
Grain direction and panel orientationIf the design mixes lacquer with wood-veneer or textured panels, state which way the grain runs on every elevation.
Signed-off sample panelApprove a physical sample of both tones on the actual door profile before release. Keep it; it becomes your reference for snagging and any later reorder.

3. Carcass, board and hardware specification

Lacquer doors get the attention, but the carcass decides how the kitchen ages. Check that the quotation names the board type and thickness for boxes, the back panel system, and whether moisture-resistant board is used under the sink and near the dishwasher. Then check the hardware schedule: hinge brand and closing action, drawer slide load rating and extension, handleless aluminium profiles, leg height and adjustment range, and any integrated lighting or charging accessories. Where a supplier offers matching hinges, drawer slide rails, support legs and connecting brackets as part of the package, ask for the model names so you can source replacements locally later.

For apartment and hotel work we also confirm whether internal layouts repeat across units, because a standardised fit-out list keeps both production and installation consistent. That is the same logic behind our Custom Built-in Kitchen Cabinets supplied as interior fixtures for hotel and apartment projects.

4. Drawings, measurements and sign-off

A quotation should attach elevation drawings with overall dimensions per run, door and drawer sizes, appliance positions and clearances, plus the electrical and plumbing set-out that the cabinets depend on. Confirm in writing who supplies site measurements, whether a second survey happens after plaster and screed, and at which point drawings are frozen. Made-to-measure sizing is exactly where rework risk concentrates: once lacquered panels are sprayed to an approved colour, a dimensional error is not a quick adjustment.

Practical test: read the elevations with the finish schedule open. If a drawing does not say which tone applies to that specific door, or the schedule does not say which elevation it belongs to, the two documents are not yet one specification.

5. Packaging, freight and container plan

Lacquered panels are the most easily marred component in a shipment, so packaging detail belongs in the quotation, not in a later email. Ask how doors are protected (edge protectors, corner beads, interleaving foam, glassine or PE film between faces), whether carcasses are knocked-down or assembled, and how the container load is planned and photographed at loading. Then check the commercial terms: Incoterms and what is included in them, sea, air or rail option, transit window, customs documents such as commercial invoice, packing list and certificate of origin, cargo insurance and who arranges it, and delivery to site or to port. A supplier that handles door-to-door logistics removes a handover point, but you still want the paperwork listed so your own broker can work from it.

6. Installation, snagging and after-sales terms

Compare who installs: your local fitter or the supplier's team, and whether site guidance, an installation manual or fixing details are provided. Then read the warranty clause closely — what is covered (panels, coating adhesion, hardware), for how long, what voids it, and how replacements are shipped. Ask how colour matching is guaranteed on a replacement panel made months later against your approved sample. Finally check response commitments: how quickly a snag report is answered and how replacement parts are produced.

7. Reading the price properly

Normalise before you decide. Take each quotation and restate it as one delivered, complete price for the same scope: same run lengths, same hardware list, same benchtop assumption, same Incoterm. A supplier quoting a lower rate but excluding tall units, fillers and installation is usually not cheaper at all. Then check payment terms against the production milestones you can actually verify — deposit at order, balance before shipment after your inspection or your third-party inspection of the approved sample and the finished panels.

Compare onAsk each supplier for
CompletenessA scope statement listing every included and excluded item
Finish controlColour codes, sheen level, coating passes and an approved sample panel reference
DurabilityBoard specification, hardware models and moisture-resistant zones
CoordinationElevation drawings, set-out drawings and the date drawings are frozen
Transit riskPackaging method, loading photographs, insurance and Incoterms
Life after deliveryWarranty scope, replacement panel policy and response time

8. Three questions that reveal the supplier quickly

  • "Which elevation is this colour on?" If they cannot answer without asking you again, the finish schedule has not been read into the drawings.
  • "What happens if a panel arrives chipped?" The quality of this answer tells you more about the working relationship than any brochure.
  • "Can we see the sample reference number on the packing list?" Marking approved samples against shipment cartons is how careful factories handle snagging.

How SANTERSON handles this specification

We have manufactured furniture and building materials in China since 2008 for villa, hospitality and office projects, with our own factory production and a service path that runs from design consultation and material selection through manufacturing, project management, logistics and installation support. For a two-tone lacquer kitchen we confirm dimensions, panel colour and surface finish against your drawings before release, and can supply matching cabinetry hardware as part of the package. The same coordination covers adjacent work in the project — Two Tone Lacquer Wardrobes for bedrooms, wall panelling, doors, flooring and lighting — so one team carries the finish schedule across the whole fit-out.

Send us your drawings and finish schedule

Share elevations, room dimensions and the colour references you intend to use, and we will return an itemised quotation with the scope, coating system and hardware list stated line by line.