Stone and marble wall finishes carry a project long after the specification sheet is signed. A panel that looks right on a sample board can still fail on site if the size, substrate or fixing detail was never agreed. Before you place an order for Santerson Stone & Marble Panels, work through the questions below with your supplier. They are the same questions our project team asks buyers at quotation stage, and answering them early keeps fabrication, delivery and installation on one schedule instead of three.
1. Which application am I actually specifying?
Our stone and marble products are catalogued for different parts of a build, and the detail you need changes with each one:
- Santerson Stone & Marble Panels, part of the Paneling Systems collection, for residential wall system projects.
- Stone & Marble Panels within Custom Partitions & Paneling, listed for residential bathroom projects where the finish sits next to wet zones and joinery.
- Santerson Stone & Marble Surfaces, part of Countertops & Basins, where the panel becomes a working horizontal surface with a basin, tapware and edge profile to coordinate.
Tell us which of these you are buying. A wall cladding enquiry and a vanity top enquiry need different drawings, different tolerance discussions and different coordination partners on site.
2. What are the finished dimensions, and who measured them?
These panels are made to measure rather than cut from a fixed module list, which is exactly why dimension errors become expensive. Send us the opening or wall area in millimetres, state whether the figures are design-stage or taken on site, and identify the datum line you measured from. Where a run meets a window reveal, a door lining or an existing tile edge, mark those constraints on the drawing.
For curved walls, recessed niches and feature fireplaces, we normally ask for a setout drawing rather than a single overall length, because each panel in the run then carries its own size. If your architect has issued a tiling or cladding layout, send it with your enquiry and we will confirm whether it can be produced as drawn.
3. Which material and finish are being confirmed in writing?
Material and finish are selectable options, not a single standard product. Before production starts, agree the face material, the surface treatment (polished, honed or textured), the veining direction where it matters, and the edge detail. A sample reference number is safer than a photograph; lighting on site rarely matches a screen.
If your design pairs stone panels with other finishes in the same room, ask how they will be sequenced. Our Santerson Textured Panels and Wall Panel Systems are frequently specified alongside stone in the same wall build-up, and the reveal, shadow gap and transition strip need to be decided once rather than twice.
4. What is behind the panel, and how will it be fixed?
This is the question most often left unanswered until the panels arrive. Confirm with us and with your builder: the substrate the panels attach to, whether framing or levelling is required where the wall is out of plumb, which adhesive or mechanical fixing the site team will use, and who signs off the substrate preparation. Where services, back boxes or lighting drivers sit behind the cladding, they must be located on the drawing before cutting begins.
For wet areas, ask specifically about the waterproofing layer, falls to the waste, and how the panel detail meets the tray or shower base. We can advise on the product side; your local contractor remains responsible for installation to the requirements that apply at the site.
5. How do the panels coordinate with the rest of the fit-out?
Stone rarely fails on its own; it fails at a junction. Decide early how the panel meets cabinetry, vanities, mirrors and lighting. Where a stone surface forms a countertop, basin type and tapware reach have to be settled before the cut-out is made. We supply double vanities, basins and built-in joinery on the same project package as the panels, which removes the handover argument between three different suppliers.
For villa and hospitality work we run this as one specification under turnkey solutions, with a single production schedule covering panels, cabinetry and fixtures. That matters most on projects where several trades share the same wall.
6. What is the lead time, and how will the order be shipped?
Ask for a written production window that starts from confirmed drawings, not from your enquiry date, and ask what happens if dimensions change after cutting has begun. For international orders, confirm packing standard, container loading plan, who prepares customs documents, and whether delivery runs door to door or stops at the port. Our logistics and door-to-door delivery service covers freight coordination and paperwork; import terms, duties and site access conditions still need checking for your own destination.
Order cutting, edge and finishing allowances for the whole wall at once. Splitting a run across two production batches is where colour and veining variation shows up.
7. What happens at handover if something is wrong?
Agree the inspection point before shipping: photographs of packed panels against the setout drawing, or a pre-shipment check you can review. Then confirm what the warranty covers, how a damaged or incorrect panel is replaced, and how long replacement takes. Our installation and after-sales support service includes site guidance, snag inspection and spare-part supply; the exact terms are confirmed per project, so read them against your programme rather than assuming they match another order.
Send us your drawings, the application you are specifying and your target site date, and our project team will return a specification with dimensions, finish options and a production schedule you can build your programme around.