A folding glass wall looks simple on a drawing: panels, hinges, a track, a span to close. On site it is one of the more unforgiving items in a villa or hotel fit-out, because the opening, the floor level, the frame finish and the hardware all have to agree before production starts. This guide walks through the six specification blocks we ask project teams to fill in for Santerson Glass Folding Doors, so the quotation you receive and the doors that arrive at site describe the same product.
Why folding doors need a more detailed spec than most openings
A hinged door fails if one hinge is wrong. A folding door assembly fails if any one of several linked decisions is wrong: the number of panels, the folding direction, where the stack parks when open, whether the top track carries the load or the bottom guide does, and how the frame finish matches the joinery around it. Because our doors are made to measure rather than stocked in fixed sizes, a missing dimension is not a substitution problem — it is a re-manufacture problem.
Santerson Glass Folding Doors sit inside the Windows & Doors range and are supplied as made-to-measure residential folding doors with selectable material and finish options and a layout tailored to the project. The practical consequence: you write the specification, we build to it, and both sides sign off on the same sheet before production begins.
Block 1 — Opening dimensions and what they must be taken from
Send finished-opening dimensions, not structural ones. Record width and height at three points across the opening (left, centre, right for height; left, centre, right for width) and note the smallest reading, because that is the size the frame has to work with.
- Clear opening width and height, measured after the final floor and wall finishes are in place, or state clearly which finish layers are still pending.
- Floor build-up: total thickness from structural slab to finished surface, plus the threshold or drainage detail if the opening faces a terrace or pool deck.
- Headroom above the opening, including any ceiling void, beam or duct that the top track must clear.
- Squareness and level: out-of-plumb walls and an unlevel floor are corrected in the setting-out stage, but we need to know they exist before sizing the frame.
If a site is mid-renovation, send the dimensions with a note on what has not yet been built. A dimension taken from a bare slab and later re-taken over a new screed is the single most common cause of a resizing request.
Block 2 — Panel layout, count and folding direction
State how the opening should be used, not only how wide it is. The usage decides the panel count and where the stack lands.
- Panels per leaf group and total panel count across the span.
- Folding direction: all panels stacking to one side, or splitting from the centre to both sides.
- Stack position when open — inside the room, outside against the wall, or into a recess — and the clear space available for that stack.
- Which panel is the daily-access pedestrian leaf, so traffic does not have to unfold the whole wall.
Where an opening needs doors in the same family but a different look, we also supply Santerson Wood Veneer Folding Doors and Classic Folding Doors. Specifying glass in one opening and wood veneer in the next is normal practice on villa projects, provided both are written up with the same level of detail.
Block 3 — Glass and frame choices to state explicitly
Write the glazing and frame requirements as line items. Where a project has a preference but no fixed decision, list the options you want quoted so comparison happens at tender stage rather than during production.
| Item | What to write in the specification |
|---|---|
| Glass type and build | Clear, low-iron, tinted, laminated or insulated units; state the required performance driver (safety, sound, solar gain) so the make-up matches the reason. |
| Frame material | Aluminium or timber-based framing, plus profile depth if an architectural detail has already been drawn. |
| Finish | Colour code, anodised grade, wood species or stain reference. Never "black" or "oak" alone — always a code or physical sample number. |
| Hardware | Hinge style, handle type and lock requirement per leaf group; state access control needs where doors sit on a guest route. |
| Sealing and threshold | Gasket detail at the sill, drainage expectation, and whether the opening is internal or exposed to weather. |
Block 4 — Interface with walls, floors and adjacent joinery
Folding doors rarely stand alone. In a full-house fit-out they meet cabinetry, wall panelling and skirting that were ordered separately, and the junctions are where quality is judged.
- Casings and architraves: who supplies them, and whether the door frame is designed to sit flush with the wall plane.
- Floor transition: threshold profile, change-of-level allowance, and drainage direction for external openings.
- Adjoining built-ins: state the set-out of any wardrobe, media wall or panelling that abuts the door reveal, so tolerances are shared rather than guessed.
Projects that combine doors with other interior fixtures benefit from a single coordination sheet covering all three trades. That is how we handle whole-house packages, where the same drawing pack drives doors, joinery and wall finishes.
Block 5 — Quantities, schedule codes and site sequence
Give every opening a code that matches your drawings, and repeat that code on the order. A schedule table is faster to check than a marked-up plan.
| Schedule column | Example entry |
|---|---|
| Opening code | D-01 (living room to terrace) |
| Quantity | 1 set, 4 panels |
| Rough opening (W x H) | Per drawing D-01 dimension sheet, finished level |
| Glass / frame finish code | As approved sample reference |
| Required on site by | Linked to flooring and painting sequence |
Also state the delivery destination and the access route for the panels. Folding door leaves arrive long and heavy; a service lift, a stairwell or a narrow gate changes how the consignment is packed and unloaded, and that decision belongs in the order, not in a phone call on delivery day.
Block 6 — Approval samples, sign-off and installation responsibility
- Approve a physical finish sample before production release. Screens shift colour; a code without a signed sample invites disputes later.
- Confirm the shop drawing in writing: panel count, hinge positions, stack direction, opening heights and handle side.
- Decide who installs. Santerson provides installation support and after-sales service as part of project delivery; state clearly at quotation stage whether your contractor or our team carries out fitting, because that affects preparation of the openings.
- Record snag items against the approved drawing, not against expectations that were never written down.
A short specification checklist to paste into your RFQ
- Finished-opening dimensions at three points, with pending finishes noted
- Floor build-up, threshold and drainage detail
- Panel count, folding direction, stack position, pedestrian leaf
- Glass make-up with the performance reason stated
- Frame material plus finish code or signed sample reference
- Hardware, locks and any access control
- Junction details to walls, floors and adjacent joinery
- Schedule codes matching the drawing set
- Delivery address, access route and required site date
- Named sign-off for shop drawings before production
Frequently asked questions
Can one order mix glass and wood veneer folding doors? Yes. Specify each opening separately in the schedule, with its own code, dimensions and finish reference.
What if my openings are not square or level? Send the readings anyway. We size to the smallest clear dimension and plan the correction at installation; concealing the problem is what causes on-site rework.
When should the doors be specified in the programme? As early as the flooring and wall finishes are decided, since both change finished-opening sizes. Specify before those layers are fixed.
Send us your draft schedule
If you have a partial specification for an opening, send it as it stands. We will mark what is missing and return a shop drawing that reflects the same decisions, so the doors quoted and the doors installed match. As a one-stop furniture and building materials supplier, Santerson supplies these doors within villa and hospitality projects alongside the joinery, wall finishes and fixtures they meet — which means one coordination sheet instead of several disconnected orders.
Browse the full Windows and Doors range for related configurations, or contact our project team with your schedule codes and dimensions to start the shop-drawing stage.