A wooden sliding door wardrobe looks settled the moment the panels close. In practice, most of what a buyer later notices — how the surface reads under bedroom lighting, whether the doors still run quietly after a season, whether the edge lines match the joinery next to them — is decided by finish details that are easy to skip in an enquiry and expensive to change after production. This guide lists what to confirm before an order is placed.
1. The door face: substrate, surface and grain direction
"Wooden" covers several different build-ups, and they do not age in the same way. Our Sliding Door Wardrobes collection is made to measure, so the surface specification is one of the choices you make rather than something fixed by a standard size. Confirm which of these you are actually ordering:
- Flat panel or framed panel — a slab face reads clean and modern; a framed or paneled face carries mouldings that collect light and shadow, and needs the profile drawn out.
- Wood grain or solid colour — with a wood-look surface, ask which decorative pattern is being used and how the grain is oriented across adjacent doors.
- Sheen level — matte, satin and high gloss are usually quoted as separate finishes, not variations of one finish. High gloss shows fingerprints and every wall irregularity; matte hides them but reads flatter in a dim room.
- Edge treatment — the most visible failure point on a sliding panel is the edge. Ask whether edges are matched to the face, how they are finished on a cut-to-size door, and what happens at the top and bottom trim.
- Interior faces — the inside of the doors and the cabinet carcass edges are visible when a door is open. Specify the colour and edge treatment for those surfaces, not only the outside face.
2. Colour and grain approval: what to ask for in writing
Screen colour is not a specification. For any project where the wardrobe sits alongside other built-in furniture, lock the surface down with physical references before production:
- A signed sample of the actual door face, not just a colour chip — including the edge banding or matched edge in the same tone.
- The acceptable range stated explicitly: lighter or darker than the sample, more or less figure in the grain. Grained and veneered surfaces vary panel to panel; say how much variation you will accept across one run of doors.
- Batch consistency for repeat orders, so a second bedroom or a later phase does not arrive in a different tone.
3. The hardware that decides how a finish performs day to day
A sliding door carries its own weight on a track, so the running gear belongs in the same conversation as the surface:
- Track and hanger type, top-hung or bottom-rolling, and what load each panel is rated for once the interior layout — hanging rails, drawers, shelves — is loaded.
- Panel overlap and reveal — how much the doors overlap in the closed position, and how the gap at the jamb is detailed. A small reveal difference is visible on a dark or high-gloss face.
- Handle or handleless edge — a handleless design keeps the face uninterrupted but changes how the door is gripped; confirm the recess or pull detail before sign-off.
- Soft-close and stop details, and what access is left for later adjustment once the wardrobe is on site.
4. Mirrored and glass faces in a sliding set
Mirror and glass panels are common alternatives to a wooden face in the same opening, and they carry their own list of confirmations: whether the mirror is bonded to a substrate panel or framed, how the back of the panel is finished where it passes the track, what safety backing the mirror has, and how scratches at the panel edge are handled. If a project mixes materials — for example timber-look panels with a single mirrored centre panel — ask for the joint detail between materials and confirm the two faces sit flush.
Mixed finishes also change weight, which feeds back into item 3: a mirror or glass panel loads the hangers differently from a board panel of the same size. Specify the panel make-up before the running gear is chosen, not after.
5. Finishes that suit the room, not just the drawing
Bedrooms, hotel rooms and villa suites put different demands on the same door face. In a high-use guest room, scuff resistance and cleanability matter more than the depth of the sheen; in a villa where the wardrobe wall is a design feature, grain continuity across three or four panels usually matters most. Where the bedroom opens onto an outdoor area, discuss the room's humidity and temperature range with us before choosing the face material — our custom furniture materials and finishes are specified per project rather than from a single standard board list.
6. Confirming sizes and the opening itself
Sliding wardrobes fail most often at the room, not in the workshop. Before we finalise drawings for production, check:
- Floor and ceiling levels across the full run, and which surface the track is fixed to.
- The finished floor build-up — the height you give us must be the completed level, not the slab.
- Skirting, architrave, curtain recess and light switches that could foul a travelling panel.
- Clear opening width with the doors fully open, which is what tells you whether two, three or four panels are right.
7. How we handle these confirmations
SANTERSON has manufactured furniture and building materials since 2008 and works on villa, hotel and apartment projects end to end — design coordination, made-to-measure production, door-to-door delivery and installation support. For wardrobe orders we work from your dimensions and selected specification: layout tailored to the room, material and finish options chosen against samples, and drawings confirmed before production starts. That is also how we keep a wardrobe consistent with the customised furniture and other joinery in the same project.
Related options in the same collection include matte, high gloss, two tone and mirror sliding door wardrobes, plus wooden sliding panels where a wall system rather than a wardrobe is required.
Send us your dimensions and finish preference
Share the room drawing or photographs, the number of panels you are considering, and two or three finishes you are weighing up. We will confirm layout, specification and a quotation for the project.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com