A wall hung basin looks simple on a drawing. It is one rectangle of ceramic floating above the floor, and most specification sheets treat it as a small line item. On site it behaves differently: the wall decides whether it can exist, the waste connection decides where it can sit, and the vanity, tapware and tiling decide whether it looks correct once the grout is cured. The Wall Hung Basin 1038WB is fixed to the wall through a back panel and takes no floor area, which makes it a practical choice for guest washrooms, hotel bathrooms and villa powder rooms where every centimetre of floor matters. This article sets out what an installation plan for that basin should actually contain before anyone opens a box.
The eight items a complete installation plan needs
What the product record already tells you
The 1038WB is made from vitreous ceramic, mounted by back panel rather than a pedestal or a floor-standing vanity, and shaped with a bowl depth intended to limit splashing. The published description positions it for family bathrooms, guest washrooms, hotel and commercial restroom projects, and states that it is supplied for wholesale and bulk project orders. That is enough to plan around, and it is also a caution: dimensions, trap type and rough-in should be read from the technical sheet issued for the batch being ordered before anything goes into a construction document. A wall hung basin specified on an assumed projection or an assumed outlet size is an expensive correction, because by the time the carton arrives the waste route and the wall framing are already behind plasterboard.
Rule of thumb for the plan: anything you cannot measure on site or read on the current technical sheet should be listed as an open item with a named owner and a date, not filled in with a typical value.
The eight items a complete installation plan needs
1. Confirmed fixture dimensions and the setting-out drawing
Record overall width, projection from the finished wall face, bowl depth and the position of the back panel fixings, taken from the technical sheet for the exact batch being ordered. Then draw the basin in plan and in elevation against the finished wall line, not the structural line. Tiling build-up is usually the difference between a basin that sits flush and one with a visible shadow gap.
2. Waste outlet type, trap and rough-in height
State the outlet size, whether the waste is S-trap or P-trap, and the required distance from the finished floor to the centre of the waste connection. The 1038WB record does not publish a trap or rough-in figure, so this line stays blank until the sheet confirms it — and the plumbing contractor signs off that their proposed pipe route matches. Where the wall cavity cannot accept the required trap depth, that is a design decision to resolve in the plan, not one to improvise during first fix.
3. Wall substrate and fixing method
A basin fixed by back panel transfers its load, plus the load of someone leaning on it, into the wall. Specify the substrate: steel or timber stud with solid noggings at the fixing line, or masonry, and confirm that the framing drawing shows the reinforcement where the fixings actually land. On renovated walls where the cavity is already closed, this is the item most often discovered too late.
4. Tapware holes, spout reach and splash behaviour
Decide early between a basin-mounted mixer and a wall-mounted or deck-mounted spout, because that decision changes the count of tapped holes in the ceramic and the position of the water supplies in the wall. Check spout reach against bowl depth: a short spout over a shallow bowl sprays water onto the counter and floor, while an over-long spout hits the front of the bowl. The 1038WB is described as having a depth intended to control splashing, which is only effective once the tap matches it.
5. Clearance and usability dimensions
Give the finished rim height for the project, the clear knee space below where the basin sits over a walkway or vanity, and the side clearance to the nearest wall, mirror or door. In hotel guest rooms and accessible bathrooms these numbers come from the project brief and the applicable local requirements, which a buyer should confirm for the destination country rather than assume from a supplier's catalogue.
6. Coordination with joinery and other sanitaryware
A wall hung basin rarely stands alone. Where it sits over storage, the Santerson Floating Vanity range is described as made-to-measure, with layout, material and finish specified per project — so the two units must share one setting-out drawing rather than two separate orders. In a small guest washroom the wall hung WC usually lands on the same wall or the same cavity: the Wall Hung Toilet 1038W page states a 180 mm P-trap wall drainage and a hidden tank, so its carrier height, waste route and reinforcement must be resolved in the same drawing revision as the basin. The Wall Hung Bidet 1004F belongs on the same plan wherever bidets are part of the room strategy, since it adds a second water supply and a second waste.
7. Wet-area interfaces: tiling, tank access and adjacent showers
Show how tiles meet the back panel, whether the basin overhangs a tiled skirt or abuts a flat tiled face, and where any concealed cistern inspection panel sits — it must remain reachable after the finish is complete. Where the basin shares a wet zone with a shower, plan the two together: the Modern Rainfall Shower System with Handheld Sprayer combines an overhead rainfall head with a slide-mounted handheld sprayer, and that slide bar position determines both the splash zone and where towels and fittings can safely go.
8. Sequence, protection and handover
Write the order of work into the plan: framing inspection, first-fix waste and supplies, cavity closure, tiling, then basin fixing, then tapware and sealant. Say who protects the ceramic once it is hung, because the highest damage rate on a project comes from trades who arrive after installation. Then state the snag items — no movement under load, no leaking joint, consistent silicone line, correct drainage — and who signs them off.
How this reads in a real project
"The basin was approved on appearance. Nothing on the approval sheet said which trap, at what height, into which wall. By the time the tiles were on, the only waste route left was the wrong one."
That is a familiar pattern on villa and apartment fit-outs, including work in Australian projects where the supplier sits offshore from the site team. The fix is not more meetings; it is an installation plan that carries the technical blanks to a named close-out date before order confirmation.
| Plan item | Who confirms it | Needed before |
|---|---|---|
| Fixture dimensions and back-panel fixing positions | Supplier technical sheet, checked by the site lead | Order confirmation |
| Waste outlet, trap type, rough-in height | Supplier plus plumbing contractor | Framing / first fix |
| Wall substrate and noggings at the fixing line | Structural or framing detailer | Cavity closure |
| Tapware type, spout reach, supply positions | Interior designer and plumber | First fix |
| Vanity, WC or bidet coordination on the same wall | Joinery supplier and site lead | Setting-out drawing sign-off |
| Tiling interface and inspection-panel access | Tiling contractor and designer | Tiling start |
Where a single supplier helps with the technical blanks
When basins, wall hung WCs, vanities, shower systems, tiling-adjacent joinery and lighting come from one source, one team can carry the setting-out information across all of them instead of each trade reconciling its own datasheet. SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with services that run from design consultation and material selection through manufacturing, project coordination, freight and door-to-door delivery to installation support. For a buyer comparing quotations, the useful question is not "do you supply wall hung basins" but "will your technical drawing show the trap, the rough-in and the reinforcement line in time for my first fix".
Bulk and wholesale orders are the normal route for these fixtures, so a project enquiry should attach the room set, the number of bathrooms per type, and the open technical items you want answered. That converts a catalogue item into a buildable specification in one exchange rather than five.
Send a bathroom fixture schedule with your enquiry
Include room counts per type, the wall construction for each basin position, and the technical items you need confirmed — dimensions, waste outlet, trap and rough-in. A project enquiry can then come back with a specification that matches your first-fix date instead of a product photo.
Figures for dimensions, trap type and rough-in are not published in the current product record for this basin and must be taken from the technical sheet issued for the ordered batch. Local installation requirements, clearance heights and compliance obligations should be verified with the specifier and the licensed trades on site.