A swim spa rarely fails at the shell. It causes trouble in the gap between what the designer drew, what the buyer approved and what the site can actually carry, wire and drain. The Outdoor Swim Spa WS-PC07A is a configurable unit in our outdoor swim and hydrotherapy range, and like every model we supply it is ordered around a confirmed specification rather than a catalogue number alone. This note sets out the items designers and buyers should settle together before the order is placed.
Start from the envelope, not the equipment list
The catalog lists WS-PC07A at 7000 × 3000 × 1470 mm. That footprint is the starting point for three separate drawings that often get produced by three different parties:
- Access route. A one-piece shell of this size has to reach the terrace, courtyard or plant room intact. Door widths, lift capacities, turning radii and overhead clearance should be checked on site, not from the plan alone.
- Support structure. Whether the unit sits on a slab, a deck frame or a podium, the structural engineer needs the filled weight and the bearing line of the shell before sizing anything. Deck builders and structural engineers are usually on different consultants' lists; the figure has to travel between them.
- Waterproofing threshold. On terraces and balconies the drainage layer, falls and upstands must be set out around the agreed footprint. If the footprint changes later, the waterproofing detail is the most expensive item to revise.
Where a designer specifies the spa and a separate buyer raises the purchase order, both parties should sign off the same dimensioned layout. A single mismatched 100 mm between a design intent and an approved shop drawing is enough to change the deck detail.
Confirm which configuration is being priced
Two closely related models in this range are easy to confuse on a bill of quantities. The specifications captured for each are set out below so that quotations can be compared against the same basis.
| Item | WS-PC07A | WS-PC07A-T |
|---|---|---|
| Catalog dimensions | 7000 × 3000 × 1470 mm | 7000 × 3000 × 1470 mm |
| Control system | 1 set | 1 set |
| Swim training system | Not listed in the captured specification for this model | 1 set |
| Water pump | 4 pcs | 1 pc |
| Filter pump | 1 pc | 1 pc |
| Jet total | 62 pcs | 56 pcs |
| LED lights | 1 | 4 |
| Total power | 9.55 kW | 11.55 kW |
The two models share an envelope but not a plant arrangement. WS-PC07A is weighted towards jet capacity, with more water pumps and a higher jet count, while the Outdoor Swim Spa WS-PC07A-T carries a swim training system as part of its listed specification. For a project where lap swimming is the brief, that difference decides which unit to specify; for a project where hydrotherapy seating is the brief, it points the other way. Buyers comparing two quotations should check that both are quoting the same model code and the same options, because identical external dimensions hide different internal equipment.
Settle the options list before the order is released
Catalog-listed options across this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs a yes or no in writing rather than an assumption carried forward from a previous project. The options that most often get missed at tender stage are the ones with site consequences:
- Heat pump. Changes the electrical load, and on a quiet residential terrace it also introduces an outdoor unit position, noise path and condensate consideration that the landscape drawing should reflect.
- Insulation. Relevant for year-round use and for energy running cost, but it affects the shell build-up, so decide before the cover and deck detail are fixed.
- Filtration arrangement. Sand filtration and cartridge systems need access for servicing. A plant cavity that fits the equipment but not a person removing it will be rebuilt.
- Steps and access. Internal or external steps change the usable internal length, which matters when the swimming channel is part of the brief.
Agree the services interface on one drawing
The single most common coordination failure on a swim spa project is that no one owns the interface drawing. Designers and buyers should confirm, on one signed document, who provides and pays for each of the following:
- Supply and installation of the electrical sub-main, isolator and protection to the unit position
- Fill supply, and a drain or pump-out route for emptying and maintenance
- Overflow and drainage connection at the shell
- Water treatment regime and dosing arrangements, including whether an added sterilization option is in scope
- Access cover or hatch for plant servicing after handover
- Lifting, crane or placement costs if the delivery position is not at ground level
Our project work covers design coordination, production, logistics and door-to-door delivery through to installation support and after-sales service, so these boundaries are usually drawn early in a project rather than discovered on site. For villa and hospitality packages that also include outdoor furniture and surrounding finishes, the same interface drawing is what keeps the deck levels, drainage and lighting positions consistent across the whole terrace.
Check the practical items a specification sheet does not answer
Before sign-off, walk through these with the supplier and the site team:
- Delivery date against the concrete pour or deck completion date, so the unit is not on site six weeks before it can be placed, nor sitting in a storage yard at project cost.
- Weight and point loads for the chosen filled configuration, confirmed by the engineer who signs the structure.
- Local electrical and plumbing compliance, which is the responsibility of the local contractors and consultants and is not something a product catalogue can settle.
- Operating instructions, spare-parts availability and the service route after handover, named in the contract rather than left to memory.
- Finish samples for the exterior shell against the deck and cladding palette, so the grey or timber-look surround reads as one design.
A short alignment checklist
Designers and buyers should be able to answer all six questions below before the purchase order is released: which exact model code is being ordered; which options are included; who is designing the support structure and on what filled weight; where the electrical supply ends and the unit's own wiring begins; how the unit reaches its final position; and who services it after handover. If any of those is still open, the specification is not finished.
For further details on this model, see the product page for Outdoor Swim Spa WS-PC07A, or browse the wider range under Swimming Pools and Swim Spas. Send us the site drawings and the intended use, and we will confirm the configuration, plant list and delivery plan for your project.