Two tone melamine wardrobes are one of the easiest ways to break up a large run of built-in storage without moving into a more expensive door material. The colour-block look also travels well across a villa or apartment package, because the same two finishes can be repeated on kitchen cabinets, vanity units and media walls. That visual simplicity is exactly where procurement problems start. A wardrobe order is not one line item: it is carcass panels, doors, interior fittings, hardware, and a set of dimensions that all have to arrive together.

This guide walks through how buyers, contractors and project designers count the wardrobes in a project, split them into orderable units, and coordinate the matching products around them so the whole built-in package is specified once rather than twice.

Start From Openings, Not From Wardrobe Models

The most common estimating mistake is counting wardrobes as furniture pieces. A two tone melamine wardrobe from our Melamine Wardrobes collection is made to measure, so the order unit is a wall opening or a run of wall, not a catalogue SKU. Before any quantity work begins, record for every room:

  • The clear wall length the wardrobe must fill, measured at floor level and again at ceiling level.
  • Floor-to-ceiling height at several points, since slabs and screeds are rarely level across a long run.
  • Position of skirting, architraves, cornices and any recessed niche that the carcass has to return into.
  • Location of power outlets, switches, air-conditioning returns and light switches that fall inside the wardrobe zone.
  • The clear swing or slide envelope in front of the unit, which decides between hinged and sliding doors.

These six readings are what a manufacturer needs to turn a drawing into a bill of materials. Send them with the room list rather than after the quotation, because they change panel sizes, not just price.

How to Split a Project Into Orderable Wardrobe Units

Once the openings are measured, group them into three tiers. This keeps the quantity list readable and stops small rooms being missed.

TierWhat it coversHow to count it
Main bedroom unitsFull-height wardrobes in master and secondary bedrooms, including corner and L-shaped runsOne unit per continuous run; note each return as a separate carcass with its own angle detail
Secondary storageHallway cupboards, linen niches, under-stair storage and study cabinets in the same finishCount by opening, and flag any unit that shares a door style with a bedroom wardrobe
Matching cabinetryVanity units, TV cabinets, bookshelves and kitchen cabinets specified in the same two finishesCount separately but on the same finish schedule, so colour batches stay consistent

A practical rule: every opening gets its own line, even when two bedrooms are identical. Mark duplicate lines as "repeat of Type A" so the factory can standardise the carcass and you can compare unit prices across rooms.

Quantity fields worth adding to your schedule

  • Room, unit reference and drawing revision number.
  • Overall width, height and depth as confirmed on site, not as drawn on the concept plan.
  • Door type: hinged, sliding or open, with the number of door leaves.
  • Finish code for each surface — body panels, door faces and interior lining stated separately.
  • Interior configuration: hanging rail heights, shelf counts, drawers, and any integrated lighting.
  • Required on-site date, so units for early rooms are produced first instead of all at once.

Choosing the Two Tones Without Creating a Colour Problem

Two tone means two surfaces in one elevation, and each surface is a separate specification. In our melamine range you can pair a matte finish melamine wardrobe body with a contrasting door face, or reverse it so the doors carry the darker tone and the carcass stays light. Which pairing you choose affects cost more than most buyers expect, because high-use surfaces need a more hard-wearing board.

  • Doors take the traffic. Handles, shoulders and bags contact door faces daily. Put the tougher or easier-to-clean tone on the doors in bedrooms and hallway cupboards.
  • Wood grain one way, solid colour the other. A wood-grain door against a solid matte body reads warm at close range; a solid door against a wood-grain carcass reads deeper and works better when the wardrobe is meant to look like wall panelling.
  • Keep the two tones on one finish schedule for the whole project. If bedroom wardrobes use tone A plus tone B, then hallway cupboards switch to tone A plus tone C, you are ordering extra colour batches and accepting small shade differences between rooms.
  • Check grain direction on paper. Two tone drawings often show a vertical grain on one elevation and a horizontal band on another. State the direction explicitly for every elevation.

Ask for the finish to be confirmed by physical sample, with your project reference marked on it. Screen colour is not a specification, and melamine boards from different print runs are matched by sample, not by name.

Coordinating the Products Around the Wardrobes

Wardrobes rarely sit alone. In a villa or apartment fit-out the same two finishes usually appear on several other built-in items, and each of them is a separate production line with its own lead time. Coordinating them means specifying once and ordering together.

The wardrobe itself: door type drives everything else

If the bedroom has a bed close to the storage wall, hinged doors lose their clearance envelope and the design moves to sliding doors. Our two tone sliding door wardrobes are specified the same way — made-to-measure sizing, layout tailored to the project, and material and finish options chosen per project — but they change three downstream details: the track needs a structural fixing line at head height, the door overlap reduces usable opening width, and skirting boards must be either scribed away or carried around the carcass. Decide the door type before the flooring contract is let, not during installation.

Matching kitchen and vanity cabinetry

Where the same two tones continue into the kitchen, order the wardrobes and cabinets against one finish schedule. The two tone melamine cabinets in our kitchen range are specified with the same made-to-measure approach, so a single set of finish codes can cover both. The practical benefit is batch control: boards cut from one production run for the wardrobes and another run six months later for a site variation will not be guaranteed to match.

Flooring, wall panels and doors

Built-in storage meets three other trades at its edges. Fix these in a coordination drawing before production:

  • Flooring. State whether the wardrobe sits on the finished floor or on the structural slab with flooring scribed up to it. This changes the carcass height by the floor build-up, and engineered wood flooring installed first leaves a visible gap if the drawing assumed otherwise.
  • Wall panelling and feature walls. If a media wall or panel system abuts the wardrobe, agree which element is installed first and who trims to whom.
  • Interior doors and architraves. A wardrobe returning into a doorway reveal has to match the architrave line, or the door will not close cleanly against it.

Sequencing Production, Delivery and Installation

A wardrobe package fails on site for two reasons: something arrives incomplete, or something arrives before the room is ready. Both are schedule problems rather than manufacturing problems.

  1. Confirm dimensions after wet trades finish. Re-measure once plaster, screed and waterproofing are complete. Made-to-measure panels ordered from architectural drawings alone will need site adjustment.
  2. Approve one production release per room group. Bedrooms first, then hallway and study units, then variations. This keeps the early rooms installable while later units are still in production.
  3. Pack by room, label by unit reference. Panels labelled only with a part number turn a two-person installation into a day of sorting. Room labels let each crew open one bundle and work through it.
  4. Send hardware with the panels it belongs to. Hinges, slides, handles, rails and integrated lighting components should be inside the corresponding room bundle, not in one consolidated box that arrives separately.
  5. Book installation against finished rooms. Wardrobes go in after flooring, painting and electrical first-fix are complete, but before loose furniture and final cleaning.

A Pre-Order Checklist

  • Every opening measured on site for width, height at multiple points and depth, with the drawing revision noted.
  • Door type decided per room against the actual clearance in front of the unit.
  • Two finish codes confirmed by physical sample, with grain direction stated for each elevation.
  • Finish schedule shared with the kitchen, vanity and joinery lines so one set of tones covers the whole project.
  • Interior configuration agreed per unit: rail heights, shelves, drawers, lighting and any soft-close hardware.
  • Coordination drawing signed off for flooring level, wall panel interface and door reveal details.
  • Delivery phased by room group, with packing and labelling instructions confirmed before production starts.
  • Site variation process agreed in writing, including who measures and who pays for re-cut panels.

Quantities and coordination are the same task viewed from two ends: count what the building actually contains, then specify every surface that touches it once. Do that and a two tone melamine wardrobe package stops being a series of individual furniture orders and becomes one built-in joinery scope — measured, produced, delivered and installed in the order the site needs it.