A bar unit rarely fails on style. It fails on measurement, sequencing and the small interfaces nobody drew: a fridge that does not clear the door swing, a worktop that arrives after the carcass, glass shelving that never got its fixing detail. When you specify Santerson Integrated Bar Systems as part of a villa or hospitality fit-out, quantity planning and product coordination are the two decisions that decide whether the bar goes in cleanly or becomes a variation order. This guide walks through both, with the checklists we use on real projects.

What an integrated bar system actually covers

In our built-in furniture range, the Bar Cabinets collection is split into configurations that suit different floor plans. Each one is made to measure: dimensions, layout, carcass material and finish are set per project rather than chosen from a fixed catalogue size. That flexibility is the reason quantities have to be planned properly: the unit is manufactured once, to the drawing you approve.

ConfigurationWhere it usually goesWhat drives its quantity
Integrated Bar SystemsOpen-plan living, media or storage walls, lounge and bar zones where the unit is built into the joinery lineNumber of wall runs and linear metres; one drawing per run
Island Bar UnitsKitchen or living islands, entertainment zones with circulation on both sidesOne unit per island; services and clearance set the footprint
Tall Bar CabinetsPantry walls, butler's pantries, back-of-house service pointsCount of bays; ceiling height sets the vertical module
Glass Front Bar CabinetsDisplay of glassware and bottles in dining and lounge areasCount of display bays; glass type per bay
Wall Mounted Bar UnitsCompact entertaining walls, media rooms, smaller guest suitesCount of units; substrate and fixing detail per wall
Compact Bar CabinetsSecondary bars, corridors, office pantries, villa guest wingsCount of units per floor or zone

Because the specification is project-tailored, "quantity" is never just a number of boxes. It is linear metres of joinery, a count of modules within each run, and the items that sit inside or beside them.

Step 1: Set the quantity baseline from the drawing, not the mood board

Before any enquiry goes out, take these five measurements per bar location. Missing one of them is the most common cause of a re-made unit.

  • Finished floor to finished ceiling height at the bar run, including any skirting, cornice or wall build-up that will sit against the carcass.
  • Clear run length in millimetres, with what each end terminates into: a wall, a return, an appliance housing or open shelving.
  • Depth available after services: ducting, sockets and switches that push the unit off the wall line.
  • Door and drawer swing envelope, checked against circulation and against adjacent appliances.
  • Worktop return and upstand detail, including where the worktop meets tiling or panelling.

Record them on a marked-up plan rather than in a spreadsheet column. When we quote, drawings beat descriptions every time, and a dimensioned plan is what lets us confirm whether an integrated run should be split into transportable modules.

Step 2: Split the bill of quantities into four groups

A bar that reads as one line item on a schedule is really four procurement groups with different lead times. Group them so nothing waits on something that was never ordered.

GroupTypical itemsPlanning point
A. CabinetryCarcasses, doors and drawer fronts, shelving, glass fronts, plinths, scribesUsually the longest lead time; released first, after dimensions are frozen
B. SurfacesWorktops and splashback panels in engineered stone or other specified finishesTemplate or drawing must match the approved carcass sizes exactly
C. Services and hardwareUnder-counter refrigeration, wine storage, taps, sinks, power, integrated cabinet lightingCut-outs and electrical points must be fixed before cabinetry is released
D. Finishes and trimPanel finishes, handles or handleless profiles, trims, wall panelling that the unit abutsSample approvals needed before mass production of doors

For multi-unit projects, such as a villa with a main bar, an outdoor bar and a guest-wing compact unit, keep one master schedule with all four groups per location. Duplicate line items across locations are normal; duplicated approvals are what save time.

Step 3: Coordinate the finishes across the whole joinery package

An integrated bar disappears into the surrounding wall only when its finish, grain direction and edge detail match the cabinetry next to it. If the same project also includes kitchen run, wardrobes or a media wall, order those from one manufacturer so the doors come off the same batch of material.

This is where our position as a one-stop furniture and building materials supplier changes the coordination load. Bar cabinets, kitchen cabinetry, wall panelling, doors, flooring, lighting and sanitary fixtures come from one production programme under one project manager, so a finish decision made for the kitchen flows through to the bar without a third party being asked to colour-match across two factories.

Practical rule: never approve a bar door finish from a brochure image. Request a physical sample in the actual carcass material and finish system, view it on site under the installed lighting, and sign it off with the same reference number used on the drawings.

Step 4: Lock interfaces before production starts

Every interface below should be shown on the coordinated drawing set. Each one is a place where two trades or two suppliers meet, and each is a cost if it is resolved on site.

  • Appliances: model, dimensions, ventilation requirement and door opening direction confirmed before carcass widths are set.
  • Worktop: thickness, edge profile, cut-out positions for sink and hob or prep bowl, and the joint location if the run exceeds one slab.
  • Lighting: driver position, switching, cable routes and the profile that holds the LED strip, with the electrical specification confirmed per cabinet design.
  • Glass: glass type, thickness, shelf spans and fixing method for glass-front doors and display shelving.
  • Walls and floors: flatness tolerance, panelling build-up, and whether scribes are cut on site or in the factory.
  • Plumbing: waste and supply positions for any bar sink, checked against carcass depths.

Our custom and OEM service covers this stage directly: design consultation and space planning, material and finish selection, prototyping where a detail is new, then production with quality control against the approved drawing set. The interface list above is what we ask project teams to close out before doors go into production.

Step 5: Plan quantities around shipping modules, not just rooms

Made-to-measure cabinetry is usually shipped internationally in flat packs, and the destination site is where the fit is decided. The quantity plan should reflect how the units will be packed and sequenced on site:

  • Break long integrated runs into modules that pass through the site's access route (lift car, stairwell, doorway), and note the split lines on the drawing.
  • Order scribing and trim material with a small allowance for on-site adjustment; it is cheap to add now and expensive to chase later.
  • Group glass and surface items in a container that arrives after the carcasses if the site cannot store them safely, and say so at the quotation stage.
  • Label every module to a room code that matches the setting-out drawing, so the installer is not identifying units by eye.

Our logistics and door-to-door delivery service handles packing, container loading, freight by sea, air or rail, customs paperwork and shipment tracking, so the container sequence can be planned alongside the site programme instead of being decided at the factory gate.

A pre-production sign-off checklist

  • Dimensions taken from finished surfaces, and confirmed on site after the wall and floor finishes are in.
  • Every bar location listed with its configuration type and module count.
  • Appliances, taps, sinks and lighting scheduled with models fixed.
  • Worktop drawings matching approved carcass dimensions, joints located.
  • Finish samples signed off with reference numbers on the drawing set.
  • Glass specification confirmed for display bays and doors.
  • Module split lines drawn and checked against site access.
  • Delivery sequence agreed against the site programme, with installation and after-sales support booked.
Dimensions, materials, finishes, hardware and electrical specifications for bar cabinets are confirmed per project. Until your drawing set has been reviewed and returned, treat the details shown on a product page as indicative rather than fixed.

Where this fits in the wider fit-out

Bar cabinetry is one line in a much larger schedule, and it usually sits between flooring, wall panelling and lighting on the critical path. If you are assembling that schedule for a villa or hospitality project, browse the interior fixtures range to see which finishes and fixtures can be pulled into the same production programme, then send us the drawings.

Send your floor plan, a marked-up bar elevation and your appliance schedule to SANTERSON, and we will return a module-by-module quantity breakdown with finish options and a production timeline for your project.