A wardrobe that looks right in the showroom can still fail on site: a moulding that does not line up with the skirting, a door that fouls the handle of an adjacent unit, or a finish sample approved on screen that reads differently under villa lighting. A written installation plan is what closes that gap. For Decorative Moulded Paneled Wardrobes, where the visual quality sits in profile detail and panel alignment, the plan matters more than for a flat-front unit. Below is the checklist we work to on residential and villa projects.
1. Room data taken before anything is drawn
Make-to-measure cabinetry only works if the survey is complete. Record the following for each wall the wardrobe occupies, and record it as a drawing rather than a note in an email:
- Finished floor level and finished wall face — not the structural slab or blockwork. State which surface the measurement refers to.
- High, low and out-of-plumb readings at several points along the run, so the scribing allowance can be designed in.
- Positions of skirting, architraves, cornices, switches, sockets, air-conditioning grilles, downlights and thermostat panels.
- Door and window opening sizes, swing direction, and the clearance each leaf needs when open.
- Ceiling height at the start, middle and end of the run — villa rooms are rarely level over four metres.
- Existing services that cannot be moved: soil stacks, water points, structural columns, beam lines.
2. Layout and internal zoning agreed with the client
The plan should show how the wardrobe is actually used, not just how it looks. Fix these decisions before production:
- Which sections hang long garments, which hold folded storage, which carry drawers, trays or a safe.
- Whether display niches or glazed fronts appear in the run — panel mouldings read differently next to glass, and the transition detail needs drawing.
- Total run length and where the visual break falls, so a module does not end awkwardly behind a door leaf or curtain.
- Handling clearance in front of the unit: hinged doors need a working aisle, sliding doors need track depth, and corner access changes the internal parts specified.
Where the bedroom has a separate dressing area, review it against the same plan. The L Shaped Walk in Wardrobes and Boutique Style Walk in Wardrobes in the same catalogue can be specified in matching finishes, so zoning both rooms on one drawing keeps hardware and timber tones consistent.
3. Finish, profile and material schedule
Decorative mouldings cannot be judged from a colour chip alone. The plan must carry a physical sample of the actual profile — the panel, the moulding, and the edge detail together — approved under the lighting condition of the room.
| Item to schedule | What the approval should confirm |
|---|---|
| Panel and moulding profile | Depth of the routed or moulded detail, and how it meets the adjacent flat panel. |
| Surface finish | Sheen level and grain direction under both daylight and warm artificial light. |
| Substrate and construction | Board construction for each part, and where a moisture-resistant core is specified. |
| Edge and closure details | Cornice, plinth, scribe and return to wall — drawn, not assumed on site. |
| Ironmongery | Hinges, slides, handles and any integrated lighting, with the make and model named. |
4. Interface drawing: what the wardrobe meets on site
Most snags come from interfaces, not from the unit itself. The plan should show each of these as a detail section:
- Floor build-up and whether the plinth is scribed to it or undercut so flooring runs beneath.
- Wall finish at the return — plaster, joinery panel or stone — and the shadow gap or trim used.
- Ceiling junction for full-height units, including how a cornice is stopped where the ceiling is not level.
- Lighting: switch positions, driver access, and whether integrated lighting is fed before the unit closes.
5. Sequencing, delivery and site readiness
The plan needs dates and a named responsibility against each stage, otherwise the units arrive into a room that is not ready:
- Trade cut-off for painting, flooring and electrical first fix at the wardrobe line.
- Packaging, container or crate list, and floor protection along the delivery route to the room.
- Storage area on site — paneled doors and moulded components need flat, dry staging, not a corner leaning against a wall.
- Installation crew access, working hours, and who signs off the setting-out before fixings go in.
6. Snag list and handover record
Close the plan with the acceptance items written down in advance: door alignment and gap consistency across the run, drawer and slide operation under load, moulding joints at corners, finish damage, and confirmation that the as-built dimensions match the approved drawings. Hand over the approved finish schedule and hardware list with the unit, so future replacement parts can be matched.
Every built-in furniture in our catalogue is made to project-specific dimensions, layout and finish. Send us the room drawings and the interface conditions above, and our team will return a production-ready wardrobe plan for your review before manufacture begins — supported by the Custom & OEM Service and Installation & After-sales Support.