A swim spa quote is easy to compare on one number and hard to compare once you look past the headline figure. The Outdoor Swim Spa WS-S12-T sits at the long end of our configurable outdoor swim and hydrotherapy range, and two quotes for this same model can differ by a whole equipment set without either supplier doing anything dishonest. Below is the line-by-line review we recommend before you sign.

Start with the shell dimensions, not the price

Our catalogue lists the WS-S12-T at 11740 × 2200 × 1470 mm. Treat that as a nominal envelope and ask for three separate figures: the external footprint, the internal water length, and the height measured to the coping rather than to the top of any raised lid or cover. A supplier quoting a shorter internal length is not necessarily offering a smaller spa; they may simply be measuring from the swim station instead of the far wall.

Then check what the quote assumes about siting. A unit placed on a prepared slab, one set into a terrace deck and one delivered to a sloping garden need different foundations, access routes and crane or forklift time. Those costs sit outside the spa price in most quotations, so ask for them as a separate line while you are still comparing suppliers.

Confirm the equipment set line by line

The specification published on our product page lists one control system, one swim training system, two water pumps, one filter pump, 73 jets in total, one LED fitting together with 50 small LED lights, and a total power figure of 7.65 kW. Use that list as your audit sheet. When a competing quote comes in materially lower, the saving is usually hiding in one of four places:

  • Pump count. Two water pumps versus one changes both the swim current and the jet performance, and it changes running cost per hour as well.
  • Jet quantity and type. "73 jets" only means something once the quote states how many are body jets, how many target the swim station, and whether the nozzle material is listed.
  • Filtration. The catalogue figure is one filter pump. Sand filtration is an option on this range, so confirm which system is priced and what the filter cycle duration is set to.
  • Lighting. One main fitting plus 50 small LEDs is a specific configuration; some quotations substitute a single underwater fitting at the same headline price.

The same care applies to the features shown on the product page: water jets, LED lighting, ozone and the swim training system. Ozone is a sanitisation option, not a substitute for filtration, so ask how it is specified alongside the filter pump rather than reading it as a maintenance-free claim.

Where a published specification does not answer your question, ask for it in writing on the quotation itself. A number that exists only in an email thread rarely survives a change of project manager.

Read the options list as part of the base price

Options catalogued for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so a supplier may quote an option that is not offered on the WS-S12-T at all. For each option in your quote, ask three questions: is it fitted for this model, is it factory-installed or added on site, and does the quoted power figure already include it?

That last question matters more than buyers expect. The 7.65 kW total shown on our page describes a particular configuration. Add a heat pump, change the pump specification, or upgrade the control system, and both the connected load and the electrical supply requirement move. If your electrical engineer has already sized the circuit from an earlier draft quote, send them the revised one.

Electrical scope is where most disputes begin

Every quotation for a swim spa should state, in writing, where the supplier's responsibility ends and yours begins. Ask for: the supply requirement for the quoted configuration (phase, voltage and dedicated circuit), whether a local isolator and residual-current protection are included or left to your electrician, who runs the cable from the distribution board, and who signs off the connection before commissioning.

Also ask what happens on site if your supply does not match. A unit delivered to a villa with an undersized board is a costly problem; it is far cheaper resolved on paper during quotation.

Compare what sits outside the equipment list

For a project buyer, the spa is only one package in a longer chain. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Confirm which of those your current quote includes, which Incoterm applies, whether cargo insurance is priced in, and who handles import clearance at your port.

Then check the finishing scope: on-site installation, inspection and snag list, spare parts availability and ongoing maintenance under our installation and after-sales support. A quotation that ends at "delivered to site" is not comparable with one that ends at "commissioned and handed over", even when the spa specification is identical.

If the swim spa forms part of a wider villa or hospitality fit-out, it is usually simpler to have the pool deck finishes, outdoor furniture and the spa itself specified together. As a one-stop furniture and building materials supplier, we coordinate that single package from design through production to handover, which removes the argument about who is responsible for the interface between the spa plinth and the surrounding deck.

A six-point pre-signature check

Before you return a signed purchase order

  • Model code on the quotation matches the model code on the proforma invoice, letter for letter.
  • Pump count, jet total, filter type and lighting configuration are itemised, not summarised.
  • Every option is marked factory-fitted or site-added, and the revised power figure is restated.
  • The electrical supply requirement and the division of responsibility are both written on the document.
  • Incoterm, insurance, port of discharge and final delivery address are named, along with who clears customs.
  • Installation, snag inspection, spare parts and maintenance terms appear in the same document as the price.

Sending us your enquiry

If you are specifying a WS-S12-T for a villa, resort or private residence project, send us the site drawing and your preferred equipment list. We will return a quotation that itemises pumps, jets, filtration, lighting, options and the electrical requirement for the configuration you have chosen, together with the delivery and installation scope, so you can compare it line by line against any competing offer.

Specification figures quoted above are transcribed from the published product page for the Outdoor Swim Spa WS-S12-T. Equipment sets, options and power ratings vary by configuration and by model; confirm the selected configuration with us in writing before ordering. Delivery terms, installation scope and after-sales arrangements are confirmed per project.