A request for quote is only as useful as the information behind it. When you are specifying Santerson Integrated Appliance Tall Cabinets for a villa, apartment or hospitality fit-out, the difference between a vague enquiry and a usable quotation comes down to appliance data, room constraints, finish choices and delivery terms. This guide sets out exactly what to include so the manufacturer can price your tall cabinet run once, correctly, instead of sending questions back and forth.
Start With the Appliance Schedule, Not the Cabinet
Integrated appliance tall cabinets are built around equipment that already has fixed dimensions. Before anyone draws a carcass, send the appliance list with, for each unit, the make and model number, the cut-out width, height and depth, the total operating weight, the power rating and supply requirement, and the water inlet, outlet or drainage need where the appliance uses water. Washing machines, tumble dryers, ovens, dishwashers and refrigerator columns all have manufacturer installation manuals; attach them or quote the model numbers so the factory can check clearances rather than guess them.
Also state how each appliance is meant to be installed: fully built behind a cabinet door, sliding on integrated hinges, ventilated through a plinth or rear cut-out, or left proud of the front line. Ventilation and service access are what most often get missed at quotation stage, and they change both the carcass build and the price.
Give Room Dimensions and Interface Conditions
A tall cabinet quotation needs the wall it stands against. Provide overall run length, floor-to-ceiling height, finished floor level, and whether the floor and walls are level or out of plumb. Note everything the cabinet must meet: skirting boards, cornices, switch plates, radiators, pipework, structural columns, doors that swing into the run, and any adjacent cabinet line that has to align with it. If the unit sits in a wet area such as an ensuite or laundry, say so plainly, because board selection and edge detailing change when surfaces see moisture.
Send drawings if you have them — a dimensioned floor plan, elevations, or a sketch with measured notes is enough. Where no drawing exists, photographs of the space from both ends plus a tape-measured sketch will still let the factory prepare a workable proposal.
Specify Finish, Door Style and Hardware
Tell the supplier what the cabinet should look like when the doors are closed. Include the substrate and surface you want, such as laminate, lacquer, veneer or acrylic; the colour reference, ideally a brand and code or a physical sample number; matte or gloss sheen; and the door profile, whether handleless, flat panel, shaker or a matching panel that continues a run of kitchen or wardrobe fronts. State hardware expectations too: hinge type, soft close, drawer runners if drawers are involved, integrated or pull handles, and any push-to-open mechanism.
Where the tall cabinets must match an existing or separately procured cabinet line, say which line and send its finish reference early. Matching a colour across two production batches is straightforward when it is quoted from the start and difficult when it is added later.
Confirm Interior Configuration per Unit
The outside is only half of the specification. For each unit, list what goes inside: fixed or adjustable shelving and how many shelves; drawer banks and their heights; pull-out trays or hampers; a dedicated broom or ironing bay; open display niches; lighting inside the carcass; and any reinforced shelf intended to carry a heavy appliance. The Santerson Utility Tall Cabinets and Multi Function Tall Cabinets in the same catalogue follow the same make-to-measure logic, so if you are mixing unit types across one project, group them in the enquiry with a clear label for each type and quantity.
State Quantity, Locations and Programme Dates
Quote accuracy depends on volume and phasing. Give the number of units of each configuration, the room or unit reference each one belongs to, and whether the project is a single villa or repeated apartment and guest-room types. Then give your programme: the date you need prices back, the date drawings must be approved, the target production release, and the required site delivery window. Manufacturers plan capacity around real dates, and a stated handover month produces a far more reliable quotation than an open-ended one.
Set Out Supply Terms and Site Practicalities
| Item to state in the RFQ | Why it changes the price |
|---|---|
| Delivery address, port of entry and Incoterms you want quoted | Determines whether freight, customs clearance and inland delivery sit with the supplier or with you |
| Packaging standard and container loading plan for mixed cabinet lines | Affects crate specification, cube usage and damage risk on site |
| Access conditions: lift size, stair width, parking, floor level, hoisting needs | Oversized flat packs that cannot reach the room need re-engineering or on-site assembly |
| Who carries out installation, and where the trades come from | Decides whether installation supervision, fixing details and snag support are quoted |
| Inspection standard and who signs off before shipment | Pre-shipment approval steps add time but reduce site rework |
| Payment terms, currency and validity period of the quote | Avoids renegotiation when board and hardware prices move |
Where a project has local building or electrical requirements, list them in the enquiry yourself rather than assuming they are understood. Appliance clearances, fixing methods into the substrate and ventilation routes should be confirmed against your own drawings and the appliance manuals before an order is released.
How a Complete Enquiry Moves Through the Process
A well-documented RFQ shortens the whole route from enquiry to handover. As set out on the turnkey solutions pages, project work moves through consultation, design and planning, production, logistics, installation and after-sales. When appliance data, room dimensions, finishes and terms arrive together in the first message, the design and quotation stage produces drawings you can approve rather than a second round of questions, and the production release is not delayed waiting for missing decisions.
If your tall cabinets are part of a wider fit-out — kitchen runs, wardrobes, vanities, doors and wall panelling — send them as one enquiry with each element itemised. Grouping the joinery package lets finishes be specified consistently across the project and lets the factory consolidate production and container loading instead of shipping several small orders.
A Simple Checklist to Paste Into Your Next RFQ
- Appliance schedule: model, cut-out dimensions, weight, power, water and ventilation requirements
- Room data: run length, floor-to-ceiling height, finished floor level, level or out-of-plumb surfaces
- Interfaces: skirting, cornices, pipework, switches, doors, adjacent cabinet lines to align with
- Wet or dry location for each unit
- Finish: substrate, surface, colour reference, sheen, door profile, hardware and soft-close needs
- Interior layout per unit: shelves, drawers, pull-outs, niches, internal lighting, load-bearing shelves
- Quantities with room or unit references, and whether types repeat across units
- Programme: quote deadline, drawing approval date, production release, required delivery window
- Supply terms: address, port, Incoterms, packaging, access conditions, installer responsibility
- Approval and sign-off process before shipment; payment terms and currency
Send the appliance schedule, measured drawings and finish references together with your quantities, and you will receive a quotation that can be compared line by line against other bids. For project enquiries on integrated appliance tall cabinets or a wider joinery package, contact SANTERSON through the contact page with your unit list and programme dates.