A matte lacquer wall rarely fails on price per square metre. It fails in the handover meeting, when the panel supplier, the cabinet maker and the tiling crew discover that nobody agreed who was supplying the reveal trims, who was measuring the recessed niche, and who pays for the second shipment of panels cut to the wrong opening. This guide walks through how we scope and price Santerson Matte Lacquer Panels as one line in a multi-product package, so the number you approve at quotation stage is close to the number you pay at delivery.
What Santerson Matte Lacquer Panels Are Supplied As
The panels sit in our Paneling Systems collection alongside acoustic, textured, glass and glossy, and stone and marble finishes. The product page describes them as configurable wall panels for residential wall system projects: finish, layout and dimensions are specified per space, with made-to-measure sizing and material and finish options listed under configuration.
That wording matters when you read a quotation. "Made-to-measure" means the panel sizes come from your drawings or an agreed site survey, not from a stock sheet, so there is no off-the-shelf price to compare line by line. What we can fix early is the finish family, the panel thickness and edge detail for the chosen configuration, and the total developed area in square metres. Everything else follows from those three decisions.
Confirm dimensions and selected specifications for each project before any figure is treated as final. The catalogue page lists options, not a fixed specification.
The Cost Blocks That Make Up a Panel Line
When we price panels inside a villa or apartment package, the line breaks into six blocks. Quotations that show only one number per square metre leave several of them undefined, and they surface later as variations.
| Cost block | What it covers | Where budgets go wrong |
|---|---|---|
| Panel area | Developed net area in square metres, by wall, with the selected finish and configuration | Gross wall area quoted instead of net; openings and returns not deducted or added back |
| Sizing and detailing | Made-to-measure cutting from approved setting-out drawings, joint positions, corner and perimeter details | No setting-out drawing, so panels are cut to a rough take-off and the last row is scribed on site |
| Trims, battens and fixings | Edge trims, mounting battens, concealed fixings and adhesives for the selected wall build-up | Fixings assumed to be supplied by the local builder, then bought at retail on site |
| Substrate preparation | Leveling, moisture control and the flatness tolerance the panel system needs before battens go on | Panel price agreed while the wall behind it is still an opening item in the main contractor's bill |
| Packaging and freight | Export packing, container loading, sea/air/rail freight, customs paperwork and door-to-door delivery | Freight quoted per shipment instead of per pallet group, so partial re-orders cost disproportionately |
| Site coordination | Sequencing with doors, joinery, lighting and skirting; installation support and snag inspection | Panels arrive before the electrical first-fix is signed off, and the job waits in storage |
Step 1: Lock the Scope Boundaries Before You Ask for a Price
Write down which walls are in and which are not. In practice we ask for four answers before pricing a wall system:
- Which rooms, and how many linear or square metres per room, taken from the drawing scale rather than an estimate?
- Where does the panel stop — at skirting, at a reveal, into a door lining, or behind a wardrobe carcass?
- Who prepares the substrate: your builder, our installation team, or nobody yet?
- Which other SANTERSON products touch the same wall — doors, wardrobes, media walls, shelving, lighting?
That last question is the one that changes the number most. A matte lacquer panel wall running into a matte lacquer wardrobe or a run of flush hinged doors has to be coordinated as one detail package, because the reveal depth and the door leaf thickness decide each other. Priced separately by two suppliers, the same wall costs more and never sits flush.
Step 2: Group Products So One Detail Package Carries Several Lines
Multi-product projects are where a single-supplier package earns its keep. Panels, joinery and doors that share a finish family can be produced in one run, packed on the same pallets and inspected against the same tolerance sheet.
Typical groupings we quote together
- Living wall: matte lacquer panels with integrated TV panels or a full-height media wall, plus integrated cabinet lighting.
- Bedroom: panels with matching lacquer wardrobes and decorative concealed doors, so the door disappears into the panel field.
- Kitchen and utility: wall panels with matte lacquer kitchen cabinets, keeping the lacquer batch and sheen consistent across vertical surfaces.
- Acoustic zones: matte lacquer panels in visible areas with acoustic panels behind seating or media positions, priced as one wall system rather than two competing systems.
Grouping does not mean one flat rate. Each line still carries its own specification and quantity. It means one setting-out drawing set, one production window and one freight consolidation, which is where the real saving sits.
Step 3: Build a Three-Tier Budget Instead of One Number
Panel projects move between quotation and construction as finishes get value-engineered. A three-tier budget lets you make that decision without re-opening the whole package.
- Tier A — base scope: the panels, trims and fixings exactly as drawn, with a defined developed area per room and no allowances.
- Tier B — allowance line: a stated percentage or square-metre allowance for setting-out changes, extra returns and site-cut pieces. We prefer an explicit allowance over silence, because an unused allowance is easy to credit back.
- Tier C — option lines: upgrades priced separately, such as a different finish in the same panel system, feature niches, or a change from fixed panels to closet sliding panels.
Ask your supplier to price the same three tiers. If a quotation cannot be split this way, it is not a scope — it is an estimate with no baseline.
Step 4: Sequence Production, Freight and Site So Cash Flow Matches Reality
Our service path runs consultation, design and planning, production, logistics, installation and after-sales. For a panel package the practical milestones are these:
- Drawing freeze. Setting-out drawings signed off with dimensions, joint grid and trim details. This is the point at which made-to-measure pricing becomes firm.
- Substrate sign-off. Walls confirmed level, dry and ready for battens. Site photos or a survey report protect both sides.
- Production and inspection. Panels produced with the joinery and doors they meet, then inspected against the same detail sheet.
- Freight and clearance. Packaging and container loading planned around the site's storage capacity, with commercial invoices, packing lists and certificates of origin prepared for import. Freight terms, duties and transit times are confirmed case by case for the destination country.
- Installation and snag list. Panels fitted after first-fix services are signed off, then inspected jointly; defects and replacement pieces are handled under the after-sales terms written into the contract.
Budget the freight block against storage. A villa that can hold one pallet group at a time should not order all panels in one container; staged deliveries cost slightly more in freight and much less in damaged stock and double handling.
Step 5: Check the Quotation Line by Line
Before you sign, put the panel quotation next to the joinery and door quotations and check for these gaps:
- Does each line state developed area in square metres, or just a count of pieces?
- Are trims, battens and fixings listed as supplied items rather than "site to provide"?
- Is the finish named consistently across panels, wardrobes and doors, including sheen?
- Are corner details, door reveals and skirting interfaces drawn, not described in words?
- Is there a stated allowance for site-cut pieces and setting-out changes?
- Does the delivery scope say where goods stop — port, kerbside, or room of installation?
Cost Drivers We See on Villa and Apartment Jobs
Scope patterns repeat across villa work of the kind shown in our project cases, including homes in Sydney, Melbourne, Perth, Willoughby and North Turramurra:
- Floor-to-ceiling heights that vary room to room. Made-to-measure pricing follows the variation; a single average height understates the cut list.
- Feature lighting inside the panel field. Recessed channels and driver access have to be detailed before cutting, not after.
- Doors aligned to the panel joint grid. Flush doors only read as flush when the grid is set out around them.
- Late finish changes. Moving from matte lacquer to textured panels or stone and marble panels after drawing freeze restarts detailing, not just the material price.
- Small re-orders. One replacement panel shipped alone is the most expensive square metre on the job; hold a documented allowance instead.
Frequently Asked Questions
Can I get a price per square metre before drawings are ready?
You can get an indicative range from the finish family and configuration, but it is not a scope. Made-to-measure sizing means the firm number follows drawing freeze.
Should panels be ordered with the cabinetry?
Where they meet, yes. Panels and lacquer joinery produced in one run share batch, sheen and tolerance, and travel together.
Who is responsible for the wall behind the panels?
It has to be written down. Either your builder delivers a prepared substrate to an agreed tolerance, or the scope includes site preparation and installation support from the panel supplier. Silence on this line is the usual cause of variation.
What if I change the finish later?
Treat it as a priced option line. Finish changes inside the same panel system alter detailing and production scheduling as well as material cost.
Send Us the Drawings and We Will Price the Package Once
If you are scoping matte lacquer panels alongside cabinetry, doors or media walls, send us the room drawings and finish schedule. We will return a scoped quotation with panel area, trims and fixings, an explicit allowance and staged freight — one package, priced once. As a China-based furniture and building materials manufacturer and one-stop supplier, SANTERSON covers design coordination, custom/OEM production, door-to-door logistics and installation support for villa, hospitality and office projects.