A wardrobe package in a commercial project rarely fails on the doors or the drawer runners. It fails in the paperwork around them: an unspecified timber species, a finish sample nobody signed off, a moisture reading nobody took, and a delivery date that quietly slipped while three other trades waited. If you are assessing a proposal for classic paneled solid wood wardrobes, the useful question is not "is this price competitive?" but "does this document leave anything open for a site argument later?" The checklist below follows the order in which those gaps actually appear on site, from the specification line to the handover snag list.

1. What the product description must state before you compare prices

Classic paneled construction looks simple from a rendering: a frame with one or more panels set inside it, repeated across a run of doors. That is exactly why proposals get away with vague wording. In a commercial setting — serviced-apartment bedrooms, a villa conversion let as short-stay accommodation, a guesthouse or boutique-hotel fit-out — the same visual can be built several different ways, and the differences show up two years into operation rather than at handover.

Before any pricing comparison, insist that each line item names:

  • The substrate behind the look. Solid timber components with a panel infill behave differently from a moulded MDF door in a painted finish, even when both are described as "paneled".
  • The species and cut, not just a trade name. "Oak" can mean several grades and cuts; state which one you have priced.
  • How movement is handled. Solid timber components expand and contract with the room. A proposal that says nothing about construction method — how the frame is joined and how the panel is allowed to move in its groove — is a snag waiting to happen.
  • The finish system: primer, topcoat, sheen level, and whether interior surfaces are finished as well as the visible faces.
  • Whether the carcass is made to measure for each opening or assembled from fixed modules. Panelled doors on a modular box will not close neatly against an out-of-plaster wall.

SANTERSON's own product record for this range is deliberately short and honest about it: made-to-measure sizing, material and finish options, and a layout tailored to the project, with dimensions and selected specifications to be confirmed per project. Treat that as the starting point of a conversation, not as a specification you can copy into a bill of quantities.

2. How to tell whether the supplier is quoting or guessing

A quotation and a guess look identical until production. The difference is visible in four places, and all four are cheap to check at proposal stage:

  • A dimensioned drawing comes before the number. If pricing arrives without shop drawings showing each unit against a real opening, someone is estimating room by room type rather than measuring.
  • Finish decisions are recorded as samples, not adjectives. "Warm grey" means one thing to your designer and another thing to a factory. Ask for physical samples or named finish references, and get the signed sample back with the order.
  • Interior configuration is priced per room type. A guest-room wardrobe and a master-suite wardrobe carry different shelf, rail and drawer mixes. One blended rate across all units usually means a change order later.
  • Assumptions are written down. Wall flatness tolerances, skirting treatment, lighting provisions inside the unit, and who supplies the hinges all belong in the quotation text.

Where the work genuinely needs to be engineered around the building rather than selected from a catalogue, that is a custom and OEM service conversation: design and prototyping, bespoke finishes, and flexible order quantities. Ask what is prototyped before production for your project, and what is simply assumed.

3. Commercial use changes the specification, not just the quantity

Wardrobes in a commercial or rental context get opened hundreds of times a week by people who do not know how carefully the door was aligned. Two practical consequences:

  • Movement allowance matters more. A building moves seasonally; a solid timber frame that was perfect when installed can bind in mid-winter if the construction detail did not allow for it. Ask the supplier how the panel sits in the frame and what adjustment range the hardware offers on site.
  • Finish durability is a specified item, not a preference. Sheen level, edge treatment and topcoat type determine whether scuffs polish out or become permanent. Get the finish system named in writing.

One point of accuracy worth stating plainly: this wardrobe range sits on the site as part of the Solid Wood Wardrobes collection for residential wardrobe projects. If your project is a hotel or apartment block, that is not automatically a problem — the same paneled construction is specified in guest-room joinery all the time — but it does mean you should ask the supplier directly whether they have delivered this construction type into comparable commercial work, and see the case references rather than accepting a general claim.

4. Reading the price line properly

Wardrobe pricing across borders is where buyers most often compare two things that are not equivalent. Before you rank bids, put each one into the same frame:

What the line saysWhat to confirm before comparing
Unit price per wardrobeIs it per linear metre or per unit? Does it include the top panel, scribes and end panels against uneven walls?
"Hardware included"Hinge brand and grade, runner type and load rating, whether soft-close is standard or an upgrade.
"Finish included"Number of coats, sheen level, and whether interior surfaces are finished.
"Delivery"Which Incoterm, to which address, and whether the last leg to site is covered. Ask for the delivery scope in writing for your specific project; do not assume a published service description applies to your address.
"Installation support"Who physically installs, who supervises, and what happens to any snags afterwards.

The cheapest bid that excludes scribing, top panels and interior finishing is not the cheapest bid. Normalise all of it into a landed-and-installed figure per room type before you rank anything.

5. Coordination: where a single supplier earns its keep

Wardrobes rarely sit alone. They meet flooring at the threshold, wall panelling and paint at the reveal, doors at the corner, and lighting at the top edge. When those items come from different suppliers, every junction becomes a coordination meeting with two parties defending their own detail.

Sourcing the joinery together with adjacent finishes through one turnkey project service puts those junctions under a single production and installation sequence. The practical benefit is not fewer invoices — it is that the skirting, the reveal and the door alignment are decided once instead of argued twice.

For Australian work specifically, project references published on this site include villa and apartment projects in Willoughby, Perth, North Turramurra, Melbourne and Sydney. Those confirm comparable delivery geography; they do not by themselves prove local compliance certification, warranty terms or transit times, which you should confirm per project before they go into your contract.

6. The pre-order check: eight questions worth asking in writing

  • Which substrate and species are you pricing for the frame, and which for the panel infill?
  • How is the panel seated so that seasonal movement does not crack the joint?
  • What is the finish system — primer, topcoat, sheen — and are interior surfaces finished?
  • Are all units made to measure against site-verified openings, and who verifies them?
  • Which hinge and runner grade, and what adjustment do they allow on site?
  • What is the delivery scope to my specific address, under which Incoterm?
  • Who installs, who supervises, and how are snags closed out at handover?
  • Have you delivered this construction type into a project like mine — and may I see it?

A supplier who answers eight questions cleanly in writing is giving you the cheapest form of project insurance available. If the answers are vague now, they will be more expensive later.

Before you commit: send your room-by-room schedule and ask for dimensioned drawings plus physical finish samples against it. That single step exposes every real difference between bids that look identical on a spreadsheet.