A floating vanity is one of those products that looks simple on a drawing and turns complicated in the quotation. Because it is wall-hung, made to measure and coordinated with a basin, a countertop and sometimes lighting, a supplier can only price what you describe. Below is the information list we work from when preparing a Santerson Floating Vanity quotation, so that the first number you receive is close to the final one.

Why the same design can be quoted very differently

Our vanities in the Vanities collection are configurable rather than fixed catalogue sizes. Each item is produced with made-to-measure sizing, a choice of material and finish, and a layout tailored to the room. That flexibility is the point of a custom programme, but it also means the quotation depends on decisions that only you can make: how long the unit is, what carries the weight of the basin, which edge detail the countertop has, and where services run inside the wall.

When any of these are left open, a supplier has two choices, and both are bad for you. They can price an assumption that later becomes a variation order, or they can pad the price to cover risk. Sending the information below removes both problems.

1. The wall and the mounting method

A floating vanity carries its own load plus the load of the basin and everything stored inside it, with nothing touching the floor. Tell us what it is being fixed to:

  • Substrate behind the finish lining (timber studs, steel framing, brick or block, or a cavity that needs a reinforcement frame).
  • Whether wall-hung cistern or in-wall services share the same wall, and their positions.
  • The finished floor-to-centre height you want for the unit, and the clear projection from the finished wall face.

This matters most in retrofit work. In the villa and apartment projects we supply, existing walls are often already lined, so a reinforcement detail has to be designed around what is there rather than assumed. A measured photograph with a tape in it, taken before any lining is removed, saves a round of questions.

2. Dimensions that actually drive the price

Send dimensions in one consistent reference (finished face to finished face) and mark them on a sketch rather than listing numbers alone.

DimensionWhy we need it
Overall width of the unitSets carcass size, drawer count and whether an intermediate support is needed.
Depth from finished wall faceDetermines basin choice and clearance in front of the mirror.
Height of the carcassAffects drawer stack and internal storage layout.
Reveal to adjacent wall or door openingPrevents drawer fronts and handles from clashing on site.
Position of waste and water outletsDetermines cut-outs and whether the internal layout can be mirrored.

3. Basin, countertop and how they meet

The vanity body is only half of the washhand basin arrangement. Tell us which of these you want, because each has different dimensional consequences:

Also send the surface you want for the deck. Our stone and marble surfaces are made to measure, so slab selection, thickness and edge profile belong in the enquiry. For a shared family bathroom or a guest suite, a double basin countertop changes the span of the carcass and the tap and waste layout, so flag it early rather than at order stage.

If you are comparing options rather than specifying a final product, say so. A single floating unit with an undermount basin can be quoted against a floor-standing single vanity carcass of the same width, and we would rather show you that trade-off than quote one of them without asking.

4. Storage layout, not just appearance

Two vanities of identical size can hold very different volumes. Tell us who uses the room and what goes in it:

  • Drawers or doors, and whether you want a full-extension runner on every drawer.
  • Tall storage for bottles and towels, or shallow drawers for daily items.
  • Whether anything needs to sit under the basin (bins, a hamper, a cleaning kit).
  • Open niches versus closed fronts, and whether internal lighting is wanted inside them.

If you are furnishing several rooms on one project, it is usually worth pairing a floating unit in the main bathroom with a double vanity in the principal ensuite. Same material and finish schedule, different carcass, one coordinated order.

5. Finish schedule and how it must match the rest of the joinery

Send the finish you want and, if the vanity has to match other cabinetry in the property, say what it has to match. Veneer, lacquer, laminate and wood-effect surfaces each behave differently under bathroom humidity and under cleaning products, and a colour name alone is not enough for a reliable match. A sample reference, a photograph of the existing joinery, or a drawing note naming the matching item all help.

Where you need a bespoke texture, colour or brand marking rather than a standard option, our custom furniture manufacturing covers design and prototyping as well as material and finish selection. That route takes longer than selecting from the range, so it belongs in the enquiry at the start.

6. Lighting, mirrors and electrical points

A floating vanity usually sits under a mirror, and that is where most site surprises appear. Confirm:

  • Whether the vanity lighting is a wall fitting above the mirror, an integrated strip in the unit, or an illuminated mirror.
  • The position of the electrical outlet and the switch that controls it.
  • Whether any integrated cabinet lighting is wanted inside niches or drawers, and where its driver will be accessible for servicing.

Electrical specifications differ by market, so state the destination country. Where a project needs illuminated storage, our LED mirror cabinet is made to the same measure as the vanity below it, which keeps the electrical coordination in one drawing.

7. Hardware, taps and waste

Tell us whether taps, waste fittings and traps are included in your order or supplied locally. If they are supplied locally, send the make and model so that spout reach, tailpiece height and trap type can be built into the cut-out drawing. Handles, integrated pulls and hinge or runner brand all change the price, so specify them instead of leaving them to be confirmed later.

8. Quantities, rooms and delivery

For a whole-house or multi-unit project, send a room-by-room schedule rather than one total quantity. It lets us group identical carcasses, keep finishes consistent across bathrooms, and pack by room so installers are not sorting crates on site.

Also confirm the delivery address, access at that address, and the sequence you need. We arrange freight and door-to-door delivery as part of the project scope, and a bathroom order that arrives after tiling is finished holds up everything downstream. If your programme has a fixed handover date, put it in the enquiry.

Before you send an enquiry, check you have covered:

  • Wall type and reinforcement, plus outlet positions on a sketch.
  • Width, depth, height and reveals in one reference system.
  • Basin type and countertop surface, with edge profile.
  • Storage layout (drawers, doors, niches, under-basin use).
  • Finish schedule and anything it must match on site.
  • Mirror and lighting choice, plus electrical point location and destination country.
  • Taps, waste and hardware: included or locally supplied.
  • Room-by-room quantities, delivery address and required date.

What happens after you send it

With the above in hand we can confirm the carcass layout, the cut-outs for basin and waste, the mounting detail for your wall, and a price that reflects what you actually specified. Where something is still open, we come back with a specific question rather than an assumption. If the vanity is part of a wider fit-out (bathroom sanitary fixtures, cabinetry, wall and floor finishes), coordinating it as one package keeps the finish schedule and the delivery sequence in step.

Send your sketch, room list and finish notes to Santerson and we will return a quotation against the specification rather than a starting price.