A submittal is the package a buyer, contractor or designer signs off before production starts. For a made-to-measure bar wall it decides whether the unit arrives fitting the opening, matching the cabinetry around it and carrying the services it needs. Below is what we ask project teams to include when they submit a Santerson Integrated Bar Systems enquiry, and what you should expect back from us.

Why the submittal matters more for integrated bar systems than for freestanding furniture

Integrated bar systems are built into the architecture. They sit between finished walls, meet a floor screed or timber deck, often run under a bulkhead, and usually share a material palette with adjacent kitchen or joinery work. A wrong dimension is not a delivery problem you solve on site; it is a re-manufacture. That is why we treat the submittal as the contract for accuracy rather than as paperwork.

Our integrated bar systems are configured per project: made-to-measure sizing, selectable materials and finishes, and layouts tailored to the space. Nothing is fixed until your drawings and ours agree.

Section 1: The dimensional package

Send us measured information, not just a mood image. The following lets our design team produce shop drawings you can approve:

  • Overall opening width, height and depth, with the finished-face line marked on each side.
  • Floor finish build-up at the bar zone, so the carcass base can be set to the correct completed level.
  • Position of structural columns, skirting, bulkheads, radiators or any obstruction that reduces usable depth.
  • Setting-out dimensions from two fixed reference points, not from a single wall.
  • Door and drawer swing clearances where the bar abuts a circulation route or an island.

Where the bar is part of a larger joinery run, include the elevation of the neighbouring cabinetry. We match profiles, reveal widths and material transitions to it rather than designing in isolation. If your project also needs Santerson Island Bar Units or a Santerson Compact Bar Cabinets in another room, send those openings in the same package so one drawing set covers the whole job.

Section 2: Materials, finishes and specification references

Tell us what the bar must match. Useful entries in this section:

ItemWhat to state
Carcass substrateSubstrate required for the environment (dry interior, wet bar, outdoor-adjacent), any fire-rating call-out from your specifier.
Door and panel finishLacquer, veneer, melamine or acrylic, with sheen level. Where the bar must match existing work, name the make and colour code you are matching to.
WorktopMaterial, thickness, edge profile, and whether a splashback returns up the wall.
HardwareHinge brand or soft-close requirement, drawer runner load rating, handle or handleless (push-to-open / integrated profile). We supply to your hardware schedule or recommend from our own range.
Glass and displayTint, frame colour and glazing type if the design includes glazed fronts or a bottle display bay.

Finish samples are worth requesting before sign-off. Veneer grain direction and lacquer sheen read differently under bar lighting than on a specification sheet, and we would rather correct that on a sample than on production panels.

Section 3: Services and interfaces

Most coordination failures come from this section being left blank. For each of the following, give us a yes or no with positions:

  • Undercounter refrigeration or wine storage: appliance model and its cut-out dimensions, plus where the ventilation grille may discharge.
  • Dishwasher or ice maker on wet bars: water inlet, waste outlet height and drain route.
  • Power: socket locations inside the carcass for small appliances, and the circuit rating your electrician will provide.
  • Lighting: whether you want Santerson Integrated Cabinet Lighting in shelved bays, under the worktop nosing or inside glass display sections, and where the driver may be housed for access.
  • Sink and tapware: basin cut-out size, tap hole count, and whether a waste assembly is supplied by you or by us.

If services are not yet fixed, say so in the submittal. We will draw the carcass with service voids left clear and re-issue the drawings once your mechanical and electrical package is released.

Section 4: Project and delivery information

The administrative part of the submittal prevents delays later:

  • Project name, site address and the party responsible for installation.
  • Programme dates: required ship date and required on-site date, stated separately.
  • Delivery terms and destination, including port or site, and any access limits at the delivery point (lift size, stair width, gate height).
  • Packaging preference for shared-container loads, if the bar travels with other goods from our range such as custom built-in kitchen cabinets, engineered flooring or decorative wall panels. As a one-stop furniture and building materials supplier, we consolidate those trades into one shipment rather than leaving you to coordinate separate consignments.
  • Named approver for shop drawings, so sign-off is not passed around between consultants.

What we return to you

Once the submittal is in, our Interior Design Services team works through the same stages we run on any fit-out: consultation and space planning, then production coordination and site support. Expect:

  • Shop drawings with overall and face-frame dimensions, section cuts at the service zones, and door elevation layouts.
  • A material and hardware schedule listing what is supplied by us and what is supplied by others.
  • A quotation broken down by unit so partial release is possible if your programme requires it.
  • An interface sheet showing the clearances your trades must deliver before installation begins.
One point to settle early: confirm which party supplies the worktop, appliances and tapware. Integrated bars look simple on a rendering but carry three or four separate supply scopes, and an unassigned item is the most common reason for a bar wall being installed incomplete.

A quick pre-submission checklist

  • Opening dimensions taken from two fixed references and marked to finished faces
  • Finish palette named, with the adjacent joinery elevation attached
  • Appliances listed with cut-out dimensions, or explicitly marked as later decision
  • Power, water and lighting positions drawn or noted as pending
  • Worktop, appliance and tapware supply responsibility assigned in writing
  • Ship date and on-site date stated separately, with site access limits noted
  • A single named approver for shop drawings

FAQ

Can a submittal be based on a designer's rendering only?

We can quote from a rendering, but production cannot start from it. Shop drawings with confirmed dimensions and finishes are required before manufacture, and we ask that someone with authority to approve those drawings is named in the enquiry.

Do integrated bar systems have to match the kitchen cabinetry?

Not necessarily. Contrasting carcass and door finishes are a legitimate design choice. What must be consistent is the build quality, the reveal widths and how the unit meets floor, wall and ceiling lines.

What if site dimensions change after production starts?

Tell us immediately. Adjustments to internal fittings, scribing panels or door alignment can often still be absorbed; a change to overall carcass size after panels are cut usually cannot. This is why we ask for dimensions taken at the finished-face stage rather than at first fix.